The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Advisory Committee on Reactor Safeguards (ACRS) 2017 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title Response
11/16/2017 State-of-the-Art Reactor Consequence Analysis (SOARCA) Project:  Sequoyah Integrated Deterministic and Uncertainty Analyses 12/22/2017
11/06/2017 Report on the Safety Aspects of the Construction Permit for Northwest Medical Isotopes, LLC, Radioisotope Production Facility 12/08/2017
10/20/2017 Revision 3 to Regulatory Guide 1.174 11/20/2017
10/20/2017 Safety Evaluation of the Nuscale Power, LLC Topical Report TR-0116-20825-P, "Applicability of AREVA Fuel Methodology for the Nuscale Design," Revision 1 11/21/2017
10/19/2017 Safety Evaluation for Topical Report ANP-10300p, Revision 0, "Aurora-B: an Evaluation Model for Boiling Water Reactors; Application to Transient And Accident Scenarios" 02/26/2018
10/11/2017 Regulatory Guide No Response Required
09/25/2017 Interim Letter: Chapters 7 and 18 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the APR1400 Design 11/02/2017
07/27/2017 Safety Evaluation for WCAP-17642-P, Revision 1, "Westinghouse Performance Analysis and Design Model (PAD5)" 09/19/2017
07/26/2017 Report on the Safety Aspects of the License Renewal Application for South Texas Project, Units 1 and 2 08/21/2017
07/26/2017 Safety Evaluation of the NuScale Power, LLC Topical Report TR-0815-16497-P, "Safety Classification of Passive Nuclear Power Plant Electrical Systems," Rev. 1 09/11/2017
07/26/2017 Interim Letter: Chapters 3, 4, 9 and 15 of The NRC Staff's Safety Evaluation Report With Open Items Related To The Certification Of The APR1400 Design 09/07/2017
06/21/2017 Draft Proposed Rulemaking 10 CFR 73.53, "Requirements for Cyber Security at Nuclear Fuel Cycle Facilities," Related Parts 70, 73, and 40, and Draft Regulatory Guide DG-5062, "Cyber Security Programs for Nuclear Fuel Cycle Facilities" 08/31/2017
06/21/2017 Proposed Revision to NUREG-1530, "Reassessment of NRC's Dollar Per Person-Rem Conversion Factor Policy" 07/21/2017
06/21/2017 Interim Letter: Chapters 6, 12, 13, 14, 16, 17, and 19 of the NRC Staff’s Safety Evaluation Report with Open Items Related to the Certification of the APR1400 Design 08/10/2017
06/19/2017 Browns Ferry Power Station Units 1, 2, and 3 Extended Power Uprate License Amendment Request 07/21/2017
06/19/2017 Draft Safety Evaluation of PWROG-14001-P, Revision 1, "PRA Model for the Generation III Westinghouse Shutdown Seal" 07/24/2017
05/19/2017 Consequential Steam Generator Tube Rupture 06/27/2017
05/18/2017 Safety Evaluation of License Amendment Request by South Texas Project Nuclear Operating Company to Adopt a Risk-Informed Resolution of Generic Safety Issue-191 06/16/2017
04/24/2017 Safety Evaluation of the NuScale Power, LLC Licensing Topical Report TR-1015-18653-P, Revision 1, Design of the Highly Integrated Protection System Platform 05/31/2017
04/18/2017 Draft NUREG/BR-0058, Revision 5, U.S. Nuclear Regulatory Commission Guidance on Performing Regulatory and Cost-Benefit Analyses 05/03/2017
04/18/2017 Report on Subsequent License Renewal 05/19/2017
03/21/2017 NRC Non-Light Water Reactor Vision & Strategy – Near-Term Implementation Action Plans and Advanced Reactor Design Criteria 05/10/2017
03/20/2017 Interim Comments on Draft NUREG/BR-0058, Revision 5, "U.S. Nuclear Regulatory Commission Guidance on Performing Cost-Benefit Analyses" 05/03/2017
03/20/2017 Proposed Revision to NUREG-1530, "Reassessment of NRC's Dollar Per Person-REM Conversion Factor Policy" 05/01/2017
02/28/2017 Safety Evaluation of APR1400 Topical Report, "KCE-1 Critical Heat Flux Correlation for PLUS7 Thermal Design"  03/30/2017
02/22/2017 Revision of Regulatory Guidance for Evaluating the Effects of Light-Water Reactor Water Environments in Fatigue Analyses of Metal Components 03/24/2017
02/21/2017 Interim Letter: Chapters 2, 5, 8, 10, and 11 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the APR1400 Design 03/31/2017
02/21/2017 Safety Evaluation of Topical Report, "Fluidic Device Design for the APR1400 03/31/2017
02/14/2017 Response to the December 15, 2016 Staff Letter Regarding "Draft Final Rule on Mitigation of Beyond-Design-Basis Events and Associated Regulatory Guidance"  03/17/2017
01/11/2017 ACRS Assessment of the Quality of Selected NRC Research Projects - 2016 No Response Required
12/13/2016 Closure of Fukushima Recommendations Related to Evaluation of Natural Hazards Other Than Seismic and Flooding, Periodic Confirmation of Natural Hazards, and Real-Time Radiation Monitoring 01/17/2017

Page Last Reviewed/Updated Wednesday, May 20, 2020