Advisory Committee on Reactor Safeguards (ACRS) 2015 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title Response
12/14/2015 Report on the Safety Aspects of the Duke Energy Carolinas, LLC, Combined License Application for William States Lee III Nuclear Station, Units 1 And 2 01/22/16
11/17/2015 ACRS Assessment of the Quality of Selected NRC Research Projects 12/03/15
11/17/2015 The Revised Fuel Cycle Oversight Process Cornerstones 12/13/15
11/16/2015 Plans for Resolving the NRC Near-Term Task Force Open Fukushima Tier 2 and 3 Recommendations 12/16/15
11/13/2015 Draft SECY Paper, "Recommendations on Issues Related to Implementation of a Risk Management Regulatory Framework" 12/28/15
11/12/2015 Report on the Safety Aspects of the License Renewal Application for Davis-Besse Nuclear Power Station 12/01/15
11/09/2015 Draft Regulatory Guide No Response Required
10/20/2015 Interim Staff Guidance, "Guidance for the Evaluation of Acute Chemical Exposures and Proposed Quantitative Standards" 11/24/15
10/16/2015 Reactor Oversight Process Enhancements 11/25/15
10/15/2015 Report On The Safety Aspects Of The Construction Permit Application For Shine Medical Technologies, Inc. Medical Isotope Production Facility 11/25/15
10/13/2015 Draft Regulatory Guide No Response Required
10/09/2015 Documentation of Receipt of Applicable Official NRC Notices to the Advisory Committee On Reactor Safeguards for October, 2015 No Response Required
09/23/2015 Interim Staff Guidance: DC/COL-ISG-028, "Assessing the Technical Adequacy of the Advanced Light-Water Reactor Probabilistic Risk Assessment for the Design Certification Application and Combined License Application" 11/19/15
09/22/2015 Draft Regulatory Basis for Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors 10/29/15
09/21/2015 Report on the Safety Aspects of the License Renewal Application for Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 10/23/15
09/15/2015 Draft Regulatory Guide No Response Required
07/21/2015 Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request 09/04/15
07/13/2015 Draft Regulatory Guide No Response Required
07/13/2015 Withdrawal of Regulatory Guide No Response Required
06/25/2015 PSEG Early Site Permit 07/17/15
06/24/2015 Grand Gulf Nuclear Station Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request 07/29/15
06/15/2015 Draft Final Regulatory Guides No Response Required
06/15/2015 Draft Regulatory Guide No Response Required
06/15/2015 Regulatory Information Summary No Response Required
05/11/2015 Draft Final Regulatory Guide No Response Required
05/11/2015 Interim Staff Guidance No Response Required
04/30/2015 Interim Staff Guidance JLD-ISG-2015-01, "Compliance with Phase 2 of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions" 05/22/15
04/22/2015 Draft SECY Paper, "Proposed Rulemaking: Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49)" 05/15/15
04/21/2015 Draft Final Regulatory Guides No Response Required
04/21/2015 Interim Staff Guidance No Response Required
04/21/2015 Withdrawal of Regulatory Guide 1.1 No Response Required
04/20/2015 Topical Report NEDC-33766P, "GEH Simplified Stability Solution (GS3)" 04/22/15
03/13/2015 Report on the Safety Aspects of the License Renewal Application of the Sequoyah Nuclear Plant Units 1 and 2 04/06/15
03/11/2015 Review of Draft SECY Paper, "Cumulative Effects of Regulation Process Enhancements and Risk Prioritization Initiative: Response to Commission Direction and Recommendations 04/09/15
03/11/2015 Draft Regulatory Guides No Response Required
03/11/2015 Interim Staff Guidance No Response Required
02/26/2015 Proposed Revision for 10 CFR 50.55a to Incorporate by Reference IEEE Standard 603-2009, "IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations" 04/14/15
02/20/2015 Draft Final Generic Letter 20XX-XX, "Treatment of Natural Phenomena Hazards at Fuel Cycle Facilities" 03/27/15
02/19/2015 Report On the Safety Aspects of the Nuclear Innovation North America, LLC Combined License Application for South Texas Project Nuclear Station, Units 3 and 4 04/02/15
02/12/2015 Draft Regulatory Guides dated February 12, 2015 No Response Required
02/12/2015 Proposed Revision to Branch Technical Position No Response Required
02/12/2015 Final ACRS Review of Watts Bar Nuclear Plant Unit 2 Operating License Application 03/19/15