The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Advisory Committee on Reactor Safeguards (ACRS) 2015 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title Response
12/14/2015 Report on the Safety Aspects of the Duke Energy Carolinas, LLC, Combined License Application for William States Lee III Nuclear Station, Units 1 And 2 01/22/16
11/17/2015 ACRS Assessment of the Quality of Selected NRC Research Projects 12/03/15
11/17/2015 The Revised Fuel Cycle Oversight Process Cornerstones 12/13/15
11/16/2015 Plans for Resolving the NRC Near-Term Task Force Open Fukushima Tier 2 and 3 Recommendations 12/16/15
11/13/2015 Draft SECY Paper, "Recommendations on Issues Related to Implementation of a Risk Management Regulatory Framework" 12/28/15
11/12/2015 Report on the Safety Aspects of the License Renewal Application for Davis-Besse Nuclear Power Station 12/01/15
11/09/2015 Draft Regulatory Guide No Response Required
10/20/2015 Interim Staff Guidance, "Guidance for the Evaluation of Acute Chemical Exposures and Proposed Quantitative Standards" 11/24/15
10/16/2015 Reactor Oversight Process Enhancements 11/25/15
10/15/2015 Report On The Safety Aspects Of The Construction Permit Application For Shine Medical Technologies, Inc. Medical Isotope Production Facility 11/25/15
10/13/2015 Draft Regulatory Guide No Response Required
10/09/2015 Documentation of Receipt of Applicable Official NRC Notices to the Advisory Committee On Reactor Safeguards for October, 2015 No Response Required
09/23/2015 Interim Staff Guidance: DC/COL-ISG-028, "Assessing the Technical Adequacy of the Advanced Light-Water Reactor Probabilistic Risk Assessment for the Design Certification Application and Combined License Application" 11/19/15
09/22/2015 Draft Regulatory Basis for Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors 10/29/15
09/21/2015 Report on the Safety Aspects of the License Renewal Application for Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 10/23/15
09/15/2015 Draft Regulatory Guide No Response Required
07/21/2015 Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request 09/04/15
07/13/2015 Draft Regulatory Guide No Response Required
07/13/2015 Withdrawal of Regulatory Guide No Response Required
06/25/2015 PSEG Early Site Permit 07/17/15
06/24/2015 Grand Gulf Nuclear Station Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request 07/29/15
06/15/2015 Draft Final Regulatory Guides No Response Required
06/15/2015 Draft Regulatory Guide No Response Required
06/15/2015 Regulatory Information Summary No Response Required
05/11/2015 Draft Final Regulatory Guide No Response Required
05/11/2015 Interim Staff Guidance No Response Required
04/30/2015 Interim Staff Guidance JLD-ISG-2015-01, "Compliance with Phase 2 of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions" 05/22/15
04/22/2015 Draft SECY Paper, "Proposed Rulemaking: Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49)" 05/15/15
04/21/2015 Draft Final Regulatory Guides No Response Required
04/21/2015 Interim Staff Guidance No Response Required
04/21/2015 Withdrawal of Regulatory Guide 1.1 No Response Required
04/20/2015 Topical Report NEDC-33766P, "GEH Simplified Stability Solution (GS3)" 04/22/15
03/13/2015 Report on the Safety Aspects of the License Renewal Application of the Sequoyah Nuclear Plant Units 1 and 2 04/06/15
03/11/2015 Review of Draft SECY Paper, "Cumulative Effects of Regulation Process Enhancements and Risk Prioritization Initiative: Response to Commission Direction and Recommendations 04/09/15
03/11/2015 Draft Regulatory Guides No Response Required
03/11/2015 Interim Staff Guidance No Response Required
02/26/2015 Proposed Revision for 10 CFR 50.55a to Incorporate by Reference IEEE Standard 603-2009, "IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations" 04/14/15
02/20/2015 Draft Final Generic Letter 20XX-XX, "Treatment of Natural Phenomena Hazards at Fuel Cycle Facilities" 03/27/15
02/19/2015 Report On the Safety Aspects of the Nuclear Innovation North America, LLC Combined License Application for South Texas Project Nuclear Station, Units 3 and 4 04/02/15
02/12/2015 Draft Regulatory Guides dated February 12, 2015 No Response Required
02/12/2015 Proposed Revision to Branch Technical Position No Response Required
02/12/2015 Final ACRS Review of Watts Bar Nuclear Plant Unit 2 Operating License Application 03/19/15