Advisory Committee on Reactor Safeguards (ACRS) 2013 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title Response
12/24/2013 Chapters 6 and 7 of the Safety Evaluation Report With Open Items for Certification of the US-APWR Design and Related Long-Term Core Cooling Issues 02/24/2014
12/18/2013 Chapters 2, 6, and 7 of the Safety Evaluation Report With Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application 01/16/2014
12/18/2013 Staff Evaluation and Recommendation for Japan Lessons-Learned Tier 3 Issue on Expedited Transfer of Spent Fuel 01/31/2014
12/12/2013 Chapters 2, 3, 9, 13, and 14 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application

01/31/2014

12/12/2013 Draft Revision to Standard Review Plan Sections No Response Required
12/12/2013 Proposed Rulemaking on Station Blackout Mitigation Strategies  
11/21/2013 ACRS Assessment of the Quality of Selected NRC Research Projects – FY 2013  
11/21/2013 Interim ACRS Review of Watts Bar Nuclear Unit 2 Operating License Application 01/09/2013
11/20/2013 ACRS Review of Spent Fuel to Dry Cask Storage  
11/20/2013 Draft Final Revisions of Regulatory Guides 1.168 through 1.173, Software Processes for Digital Computers in Safety Systems of Nuclear Power Plants 02/10/2014
11/20/2013 Draft Commission Paper, "NRC Staff Recommendation for the Disposition of Recommendation 1 of the Near-Term Task Force Report" [SRM-M120911] 12/06/2013
11/13/2013 Draft Final Regulatory Guides No Response Required
10/18/2013 Interim Staff Guidance JLD-LSG-2013-02, "Compliance With Order EA-13-109, Order Modifying Licenses With Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions"  
10/08/2013 Regulatory Guide 1.79, "Preoperational Testing of Emergency Core Cooling Systems for Pressurized-Water Reactors," Revision 2, and Regulatory Guide 1.79.1, "Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors," Revision 0  
10/07/2013 Draft Final Regulatory Guide (RG) 1.73 No Response Required
10/07/2013 Draft Revision to Standard Review Plan Section No Response Required
10/07/2013 WCAP-17577 No Response Required
09/19/2013 Draft Commission Paper, "Recommendations for Risk Informing the Reactor Oversight Process for New Reactors" 12/13/2013
09/16/2013 Monticello Nuclear Generating Plant Extended Power Uprate License Amendment Request; 10/22/2013
09/12/2013 Proposed Amendment to 10 CFR 50.55a No Response Required
09/12/2013 Draft Revisions to Standard Review Plan Section No Response Required
09/12/2013 Draft Final Regulatory Guide 1.129 No Response Required
09/11/2013 Withdrawal of Regulatory Guide 2.4 No Response Required
07/22/2013 Revisions to Low-Level Radioactive Waste Disposal Requirements (10 CFR Part 61) 08/29/2013
07/18/2013 Spent Fuel Pool Study 08/14/2013
07/17/2013 Draft Revisions to Standard Review Plan Sections No Response Required
07/17/2013 Proposed Draft Guide (DG-8031) No Response Required
07/01/2013 Proposed Draft Guide (DG-3042) No Response Required
06/18/2013 Draft Final Revisions Of Regulatory Guides 1.168 through 1.173, Software Processes For Digital Computers In Safety Systems Of Nuclear Power Plants

08/29/2013

06/17/2013 Draft Final Interim Staff Guidance No Response Required
06/17/2013 Proposed Rulemaking on Station Blackout Mitigation Strategies 08/01/2013
06/11/2013 Draft Final Regulatory Guides No Response Required
05/15/2013 Final Revision 2 of Regulatory Guide 1.137 No Response Required
05/15/2013 Draft Revisions to Standard Review Plan Sections No Response Required
05/15/2013 Next Generation Nuclear Plant (NGNP) Key Licensing Issues 06/20/2013
05/02/2013 WCAP-17116-P, "Westinghouse BWR ECCS Evaluation Model: Supplement 5-Application to ABWR" 05/31/2013
04/29/2013 Chapters 4, 15, 17, and 19 of the Safety Evaluation Report with Open Items for Certification of the US-APWR Design and Safety Evaluations of Supporting Topical Reports 05/24/2013
04/26/2013 Chapters 4, 13, 15, 16, 17, and 19 of the Safety Evaluation Report with Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application 05/31/2013
04/15/2013 Draft Final Regulatory Guide 1.68 No Response Required
04/15/2013 Proposed Regulatory Guide DG-7009 No Response Required
03/20/2013 Regulatory Guide 1.163, “Performance-Based Containment Leak-Test Program,” Revision 1 04/09/2013
03/19/2013 Draft Design Specific Review Standard for mPower iPWR Chapter 7 Instrumentation and Control Systems 04/29/2013
03/12/2013 Proposed Regulator Guides DG-1235 and DG-1300 No Response Required
03/11/2013 Draft Revisions to Standard Review Plan Sections No Response Required
03/11/2013 Proposed Closeout – Generic Issue 189 No Response Required
02/26/2013 Construction Reactor Oversight Process (cROP) Program and the Crop Pilot Program Results 03/25/2013
02/14/2013 Report on the Safety Aspects of the License Renewal Application for Limerick Generating Station, Units 1 and 2 03/25/2013
02/14/2013 Draft NUREG-2125, "Spent Fuel Transportation Risk Assessment" 03/25/2013
02/12/2013 Final Interim Guidances 013 and 014 No Response Required
02/12/2013 Withdrawal of Regulatory Guide 4.4 No Response Required
01/02/2013 Draft NUREG-1855, Revision 1, “Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking” 02/05/2013

Page Last Reviewed/Updated Friday, March 13, 2020