Date |
Title |
Response |
12/24/2013 |
Chapters 6 and 7 of the Safety Evaluation Report With Open Items for Certification of the US-APWR Design and Related Long-Term Core Cooling Issues |
02/24/2014 |
12/18/2013 |
Chapters 2, 6, and 7 of the Safety Evaluation Report With Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application |
01/16/2014 |
12/18/2013 |
Staff Evaluation and Recommendation for Japan Lessons-Learned Tier 3 Issue on Expedited Transfer of Spent Fuel |
01/31/2014 |
12/12/2013 |
Chapters 2, 3, 9, 13, and 14 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application |
01/31/2014
|
12/12/2013 |
Draft Revision to Standard Review Plan Sections |
No Response Required |
12/12/2013 |
Proposed Rulemaking on Station Blackout Mitigation Strategies |
|
11/21/2013 |
ACRS Assessment of the Quality of Selected NRC Research Projects – FY 2013 |
|
11/21/2013 |
Interim ACRS Review of Watts Bar Nuclear Unit 2 Operating License Application |
01/09/2013 |
11/20/2013 |
ACRS Review of Spent Fuel to Dry Cask Storage |
|
11/20/2013 |
Draft Final Revisions of Regulatory Guides 1.168 through 1.173, Software Processes for Digital Computers in Safety Systems of Nuclear Power Plants |
02/10/2014 |
11/20/2013 |
Draft Commission Paper, "NRC Staff Recommendation for the Disposition of Recommendation 1 of the Near-Term Task Force Report" [SRM-M120911] |
12/06/2013 |
11/13/2013 |
Draft Final Regulatory Guides |
No Response Required |
10/18/2013 |
Interim Staff Guidance JLD-LSG-2013-02, "Compliance With Order EA-13-109, Order Modifying Licenses With Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions" |
|
10/08/2013 |
Regulatory Guide 1.79, "Preoperational Testing of Emergency Core Cooling Systems for Pressurized-Water Reactors," Revision 2, and Regulatory Guide 1.79.1, "Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors," Revision 0 |
|
10/07/2013 |
Draft Final Regulatory Guide (RG) 1.73 |
No Response Required |
10/07/2013 |
Draft Revision to Standard Review Plan Section |
No Response Required |
10/07/2013 |
WCAP-17577 |
No Response Required |
09/19/2013 |
Draft Commission Paper, "Recommendations for Risk Informing the Reactor Oversight Process for New Reactors" |
12/13/2013 |
09/16/2013 |
Monticello Nuclear Generating Plant Extended Power Uprate License Amendment Request; |
10/22/2013 |
09/12/2013 |
Proposed Amendment to 10 CFR 50.55a |
No Response Required |
09/12/2013 |
Draft Revisions to Standard Review Plan Section |
No Response Required |
09/12/2013 |
Draft Final Regulatory Guide 1.129 |
No Response Required |
09/11/2013 |
Withdrawal of Regulatory Guide 2.4 |
No Response Required |
07/22/2013 |
Revisions to Low-Level Radioactive Waste Disposal Requirements (10 CFR Part 61) |
08/29/2013 |
07/18/2013 |
Spent Fuel Pool Study |
08/14/2013 |
07/17/2013 |
Draft Revisions to Standard Review Plan Sections |
No Response Required |
07/17/2013 |
Proposed Draft Guide (DG-8031) |
No Response Required |
07/01/2013 |
Proposed Draft Guide (DG-3042) |
No Response Required |
06/18/2013 |
Draft Final Revisions Of Regulatory Guides 1.168 through 1.173, Software Processes For Digital Computers In Safety Systems Of Nuclear Power Plants |
08/29/2013
|
06/17/2013 |
Draft Final Interim Staff Guidance |
No Response Required |
06/17/2013 |
Proposed Rulemaking on Station Blackout Mitigation Strategies |
08/01/2013 |
06/11/2013 |
Draft Final Regulatory Guides |
No Response Required |
05/15/2013 |
Final Revision 2 of Regulatory Guide 1.137 |
No Response Required |
05/15/2013 |
Draft Revisions to Standard Review Plan Sections |
No Response Required |
05/15/2013 |
Next Generation Nuclear Plant (NGNP) Key Licensing Issues |
06/20/2013 |
05/02/2013 |
WCAP-17116-P, "Westinghouse BWR ECCS Evaluation Model: Supplement 5-Application to ABWR" |
05/31/2013 |
04/29/2013 |
Chapters 4, 15, 17, and 19 of the Safety Evaluation Report with Open Items for Certification of the US-APWR Design and Safety Evaluations of Supporting Topical Reports |
05/24/2013 |
04/26/2013 |
Chapters 4, 13, 15, 16, 17, and 19 of the Safety Evaluation Report with Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application |
05/31/2013 |
04/15/2013 |
Draft Final Regulatory Guide 1.68 |
No Response Required |
04/15/2013 |
Proposed Regulatory Guide DG-7009 |
No Response Required |
03/20/2013 |
Regulatory Guide 1.163, “Performance-Based Containment Leak-Test Program,” Revision 1 |
04/09/2013 |
03/19/2013 |
Draft Design Specific Review Standard for mPower iPWR Chapter 7 Instrumentation and Control Systems |
04/29/2013 |
03/12/2013 |
Proposed Regulator Guides DG-1235 and DG-1300 |
No Response Required |
03/11/2013 |
Draft Revisions to Standard Review Plan Sections |
No Response Required |
03/11/2013 |
Proposed Closeout – Generic Issue 189 |
No Response Required |
02/26/2013 |
Construction Reactor Oversight Process (cROP) Program and the Crop Pilot Program Results |
03/25/2013 |
02/14/2013 |
Report on the Safety Aspects of the License Renewal Application for Limerick Generating Station, Units 1 and 2 |
03/25/2013 |
02/14/2013 |
Draft NUREG-2125, "Spent Fuel Transportation Risk Assessment" |
03/25/2013 |
02/12/2013 |
Final Interim Guidances 013 and 014 |
No Response Required |
02/12/2013 |
Withdrawal of Regulatory Guide 4.4 |
No Response Required |
01/02/2013 |
Draft NUREG-1855, Revision 1, “Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking” |
02/05/2013 |