Date |
Title |
Response |
12/20/2012 |
Response to the EDO October 26, 2012, Letter Regarding Chapter 9 of the Safety Evaluation Report with Open Items for the US-APWR Design Certification Application |
02/11/2013
|
12/19/2012 |
Response to the October 26, 2012, EDO Letter Regarding Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel |
01/28/2013
|
12/18/2012 |
Draft Design Specific Review Standard for mPower iPWR Chapter 7 Instrumentation and Control Systems |
02/06/2013 |
12/17/2012 |
Draft Final Regulatory Guide 4.22, "Decommission Planning During Operations" |
No Response Required |
11/13/2012 |
SECY-12-0110, “Consideration of Economic Consequences within the U.S. Nuclear Regulatory Commission’s Regulatory Framework” |
12/07/2012
|
11/08/2012 |
ACRS Review of Staff’s Draft SECY Paper on Consideration of Additional Requirements for Containment Venting Systems for Boiling Water Reactors with Mark I and Mark II Containment Designs |
12/11/2012 |
11/07/2012 |
Response to the August 15, 2012 EDO Letter Regarding ACRS Recommendations in Letter dated July 17, 2012 on the Draft Interim Staff Guidance Documents in Support of Tier 1 Orders |
12/13/2012 |
11/07/2012 |
Long-Term Core Cooling for the South Texas Project Advanced Boiling Water Reactor Combined License Application |
12/07/2012 |
10/22/2012 |
ACRS Assessment of the Quality of Selected NRC Research Projects – FY 2012 |
|
10/18/2012 |
Draft Safety Evaluation of WCAP-16793-NP, Revision 2, “Evaluation of Long-Term Cooling Considering Particulate, Fibrous and Chemical Debris in the Recirculating Fluid” |
11/19/2012 |
10/16/2012 |
Withdrawal of Regulatory Guide 1.182 |
No Response Required |
10/16/2012 |
Proposed Regulatory Guide DG-1294 |
No Response Required |
10/16/2012 |
SECY-12-0064, Recommendations for Policy and Technical Direction to Revise Radiation Protection Regulations and Guidance |
11/13/2012
|
09/25/2012 |
Draft Regulatory Guide DG-1290 (Proposed Revision of Regulatory Guide 1.59), “Design-Basis Floods for Nuclear Power Plants” |
11/01/2012
|
09/18/2012 |
Interim Staff Guidance 8, Revision 3, “Burnup Credit in the Criticality Safety Analyses of PWR Spent Fuel in Transportation and Storage Casks” |
10/26/2012
|
09/18/2012 |
Chapters 5, 8, 10, 11 and 12 of the Safety Evaluation Report with Open Items for the Comanche Peak Nuclear Power Plant, Units 3 and 4, US-APWR Reference Combined License Application |
10/15/2012
|
09/18/2012 |
Chapter 9 of the Safety Evaluation Report with Open Items for the US-APWR Design Certification Application |
10/26/2012
|
09/17/2012 |
Draft Final NUREG-1022, Revision 3, “Event Reporting Guidelines 10 CFR 50.72 and 50.73” |
No Response Required |
09/17/2012 |
Draft Final Regulatory Guides |
No Response Required |
09/11/2012 |
Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel |
10/26/2012
|
07/23/2012 |
Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 2, License Amendment Request for an Extended Power Uprate |
08/10/2012 |
07/19/2012 |
Draft Final NUREG-1934 (EPRI 1023259), “Nuclear Power Plant Fire Modeling Analysis Guidelines (NPP FIRE MAG)” |
08/17/2012
|
07/17/2012 |
SECY-12-0081, “Risk-Informed Regulatory Framework for New Reactors” |
No Response Required |
07/17/2012 |
Draft Interim Staff Guidance Documents in Support of Tier 1 Orders |
08/15/2012
|
07/16/2012 |
Proposed Regulatory Guides DG-1282, DG-3042, and DG-1269 |
No Response Required |
06/20/2012 |
Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 1, License Amendment Request for an Extended Power Uprate |
08/01/2012
|
06/19/2012 |
NRC Staff’s Draft Plans and Status Summaries for Tier 3 Japan Lessons Learned Recommendations |
07/17/2012
|
06/18/2012 |
Grand Gulf Nuclear Station, Unit 1, Extended Power Uprate License Amendment Request |
08/01/2012
|
06/18/2012 |
Proposed Revision 1 to Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, ASME OM Code" |
07/24/2012
|
05/18/2012 |
Chapters 3, 9, 14, and 19 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Rector Design Certification Application |
06/18/2012
|
05/17/2012 |
Draft Final NUREG-1921, (EPRI Report 1023001),“EPRI/NRC-RES Fire Human Reliability Analysis Guidelines |
06/19/2012
|
05/15/2012 |
State-of-the-Art Reactor Consequence Analyses (SOARCA) Project |
07/31/2013
Enclosure |
05/14/2012 |
Withdrawal of Regulatory Guides 5.67 and 7.3 |
No Response Required |
04/26/2012 |
Draft Commission Paper, "Risk-Informed Regulatory Framework for New Reactors" |
05/30/2012 |
04/25/2012 |
Spent Fuel Pool Study |
05/23/2012 |
04/25/2012 |
Response to the January 24, 2012, EDO Letter Regarding the Progress Energy Florida Combined License Application for Levy Nuclear Plant, Units 1 and 2 |
05/29/2012
|
04/25/2012 |
Chapters 6, 7, 15, and 18 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application |
05/31/2012
|
04/24/2012 |
Report on the Safety Aspects of the License Renewal Application for the Columbia Generating Station |
07/06/2012 |
04/23/2012 |
Extremely Low Probability of Rupture Project |
05/30/2012 |
04/16/2012 |
Draft Final Regulatory Guide 4.20 |
No Response Required |
04/16/2012 |
Proposed Regulatory Guides DG-5028 and DG-1279 |
No Response Required |
04/16/2012 |
Disposition of the ACRS's Review of Draft 10 CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Dai-Ichi Event |
05/10/2012
|
04/03/2012 |
Review and Evaluation of the Nuclear Regulatory Commission Safety Research Program |
06/18/2012
|
03/20/2012 |
Report on the Final Safety Evaluation Report Associated With the Florida Power and Light Turkey Point Nuclear Plant Units 3 and 4 License Amendment Request for an Extended Power Uprate |
04/09/2012 |
03/15/2012 |
Draft Final Regulatory Guide 1.82 |
No Response Required |
03/15/2012 |
Chapters 6, 7, 11, 13, 15, 16, and 18 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Reactor Design Certification Application |
04/24/2012
|
03/14/2012 |
ACRS Review of Proposed Orders in Response to Fukushima Lessons Learned (SECY-12-0025) |
07/06/2012 |
03/13/2012 |
Response to February 27, 2012 Letter Regarding Final Disposition of Fukushima-Related ACRS Recommendations in Letters dated October 13, 2011 and November 8, 2011 |
04/26/2012
|
02/16/2012 |
Draft Final Revision 1 to Regulatory Guide 1.93,"Availability of Electric Power Sources" |
03/15/2012 |
02/15/2012 |
Draft 10 CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Daiichi Event |
03/21/2012 |
02/13/2012 |
Draft Final Regulatory Guides 1.160 and 4.11 |
No Response Required |
02/13/2012 |
International Isotopes Fluorine Extraction and Depleted Uranium De-Conversion Plant Safety Evaluation |
No Response Required |
01/26/2012 |
Proposed Draft Rule for 10 CFR 50.46c, "Emergency Core Cooling System Performance During Loss-of-Coolant Accidents" |
02/17/2012 |
01/24/2012 |
Draft Final Regulatory Guides 7.4, 3.74, and 7.7 |
No Response Required |