The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Advisory Committee on Reactor Safeguards (ACRS) 2011 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title EDO
Response
12/13/2011 Revised Branch Technical Position on Concentration Averaging and Encapsulation of Low-Level Radioactive Waste 02/03/2012
12/12/2011 Response to the October 28, 2011, EDO Letter Regarding the ACRS Recommendations on Topical Report NEDC-33173P, Supplement 2, Parts 1, 2, and 3, "Analysis of Gamma Scan Data and Removal of Safety Limit Critical Power Ratio (SLMCPR) Margin" 01/16/2012
12/08/2011 Proposed Requirements for ITAAC Maintenance and Draft Final Regulatory Guide 1.215, "Guidance for ITAAC Closure Under 10 CFR Part 62" 01/16/2012
12/07/2011 Report on the Safety Aspects of the Progress Energy Florida, Inc. Combined License Application for Levy Nuclear Plant, Units 1 and 2 01/24/2012
12/06/2011 ESBWR Design Certification Rulemaking and Supplemental Final Safety Evaluation Report No Response Required
12/06/2011 Proposed Revisions to Regulatory Guides 1.140 and 1.185 No Response Required
11/14/2011 Draft Final Revision 6 of Standard Review Plan Branch Technical Position 7-19, "Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems" 01/27/2012
11/14/2011 Topical Report NEDC-33173P-A, Supplement 2, Parts 1, 2, and 3, "Analysis of Gamma Scan Data and Removal of Safety Limit Minimum Critical Power Ratio (SLMCPR) Margin" Non-publically Available
11/14/2011 Draft Final Regulatory Guide 1.106 No Response Required
11/14/2011 Proposed Revision 4 to Regulatory Guide 1.52 (DG-1274) No Response Required
11/10/2011 Nine Mile Point Nuclear Station, Unit 2, Extended Power Uprate Application 12/12/2011
11/08/2011 ACRS Review of Staff's Prioritization of Recommended Actions to be Taken in Response to Fukushima Lessons Learned (SECY-11-0137) 12/08/2011
10/17/2011 Enhancing the Fuel Cycle Oversight Process 11/08/2011
10/17/2011 Draft Final Regulatory Guide (RG) 1.82, "Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident," Revision 4 11/21/2011
10/13/2011 Initial ACRS Review of: (1) the NRC Near-Term Task Force Report on Fukushima and (2) Staff's Recommended Actions to be Taken Without Delay 12/08/2011
10/12/2011 Proposed Closeout – Generic Issue 186, "Potential Risk and Consequences of Heavy Load Drops in Nuclear Power Plants" No Response Required
09/22/2011 Final Rule – AP1000 Design Certification Amendment No Response Required
09/22/2011 Chapters 2, 5, 8, 10,11,12, 13, and 16 of the Safety Evaluation Report with Open Items for Certification of the US-APWR Design 10/25/2011
09/22/2011 Proposed Rulemaking to Introduce a Site-Specific Performance Assessment and Human Intrusion Analysis Requirement to 10 CFR Part 61 11/03/2011
09/21/2011 Proposed Regulatory Guide DG-1278 No Response Required
09/20/2011 Draft Final Regulatory Guides 1.159, 1.221, and 1.218 No Response Required
09/20/2011 Supplement 1 to NUREG-1930, "Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Units 2 and 3" No Response Required
09/19/2011 Draft Final Regulatory Guide 1.115, Revision 2, "Protection Against Turbine Missiles" 10/25/2011
09/19/2011 ACRS Assessment of the Quality of Selected NRC Research Projects-FY2011  
09/19/2011 Revision 19 to the AP1000 Design Control Document and the AP1000 Final Safety Evaluation Report 10/12/2011
08/11/2011 Response to the June 8, 2011, EDO Letter Regarding Draft Final Revision 3 of Regulatory Guide (RG) 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants" 01/30/2012
08/11/2011 Topical Report NEDC-33173P, Supplement 2, Part 1, 2 and 3, "Analysis of Gamma Scan Data and Removal of Safety Limit Minimum Critical Power Ratio (SLMCPR) Margin  
07/20/2011 Information Requested During the April 7, 2011, ACRS Meeting  
07/20/2011 Draft Final Regulatory Guide 1.156 No Response Required
07/20/2011 Request for Waiver of ACRS Review of Final Rule: U.S. Advanced Boiling Water Reactor Aircraft Impact Design Certification Amendment (RIN 3150-A184) 08/04/2011
07/19/2011 Supplement 2 to NUREG-1891 No Response Required
07/19/2011 Proposed Regulatory Guide DG-1270 No Response Required
06/22/2011 Draft Regulatory Guides DG-1261, DG-1262, and DG-1263  
06/22/2011 Draft SECY Paper, "Options for Proceeding with Future Level 3 Probabilistic Risk Assessment Activities" 09/21/2011
06/16/2011 Report on the Safety Aspects of the License Renewal Application for the Hope Creek Generating Station 07/14/2011
06/13/2011 NRC Bulletin 2011-01, "Mitigating Strategies"  
06/09/2011 Draft Final Regulatory Guides 1.107 and 1.179 No Response Required
05/25/2011 Report on the Safety Aspects of the License Renewal Application for the Salem Nuclear Generating Station Units 1 and 2 06/16/2011
05/24/2011 Human Factors Considerations Associated with Emerging Technologies in Nuclear Power Plants 06/16/2011
05/20/2011 High Temperature Gas-Cooled Reactor (HTGR) NRC Research Plan 06/10/2011
05/19/2011 Response to the April 5, 2011, EDO Letter Regarding Draft Final Regulatory Guides 1.34, 1.43, 1.44, and 1.50 06/24/2011
05/19/2011 Response to the February 5, 2011, EDO Letter Regarding the Final Safety Evaluation Associated with the Amendment to the AP1000 Design Control Document 06/30/2011
05/18/2011 Response to the March 1, 2011, EDO Letter Regarding Draft Final Rule, “Enhancements to Emergency Preparedness,” and Related Regulatory Guidance Documents 06/22/2011
05/17/2011 Safety Evaluation Report Related to the License Renewal of Prairie Island Nuclear Generating Plant, Units 1 and 2, Docket Numbers 50-282 and 50-306  
04/20/2011 Final Draft Revision 3 of RG 1.152 Criteria for use of Computers in Safety Systems of Nuclear Power Plants 06/08/2011
04/19/2011 Response to the March 22, 2011, EDO Letter Regarding Comparison of Integrated Safety Analysis and Probabilistic Risk Assessment for Fuel Cycle Facilities 06/01/2011
04/19/2011 Chapters 2, 4, 5, 8, 10, 11, 12, 16, 17, and 19 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant Unit 3 Combined License Application 05/19/2011
04/12/2011 Proposed Regulatory Guides DG-1264, DG1206, DG-1207, DG-1208, DG-1209, DG-1210, and DG-1267 No Response Required
04/12/2011 Draft Final Regulatory Guides 8.2, 8.24, and 3.67 No Response Required
04/12/2011 Additional Information Regarding The Safety Evaluation Report For The License Renewal Of Palo Verde Nuclear Generating Station, Units 1, 2, and 3  
04/12/2011 Draft Revision 3 to NUREG-1022, “Event Reporting Guidelines 10 CFR 50.72 and 50.73” No Response Required
03/23/2011 Status of Groundwater Protection Task Force Efforts 04/22/2011
03/23/2011 Point Beach Nuclear Plant Units 1 and 2 Extended Power Uprate Application 04/08/2011
03/16/2011 SECY-11-0024, "Use of Risk Insights to Enhance the Safety Focus of Small Modular Reactor Reviews" 03/22/2011
03/10/2011 Draft Final Regulatory Guide 1.149 No Response Required
03/10/2011 Draft Final Revision to 10 CFR 50.55a, "Codes and Standards"  
03/10/2011 Supplement 2 to NUREG-1907, "Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station, Docket NO. 50-271"  
03/10/2011 Withdrawal of Regulatory Guide 8.5 No Response Required
03/01/2011 Report on the Safety Aspects of the License Renewal Application for the Palo Verde Nuclear Generating Station 03/24/2011
02/28/2011 Response to the January 21, 2011, EDO Letter Regarding the Safety Culture Policy Statement 03/31/2011
02/24/2011 Draft Final Regulatory Guides 1.34, 1.43, 1.44, and 1.50 04/05/2011
02/17/2011 Comparison of Integrated Safety Analysis (ISA) to Probabilistic Risk Assessment (PRA) 03/22/2011
02/17/2011 Report on the Safety Aspects of the South Carolina Electric and Gas Company Combined License Application for V.C. Summer Nuclear Station, Units 2 and 3 03/26/2011
02/17/2011 SECY-11-0014, “Use of Containment Accident Pressure in Analyzing Emergency Core Cooling System and Containment Heat Removal System Pump Performance in Postulated Accidents” 03/27/2011
02/17/2011 Current State of Licensee Efforts to Transition to National Fire Protection Association (NFPA) Standard 805 05/03/2011
02/17/2011 Proposed Regulatory Guide DG-1254 No Response Required
01/31/2011 Review of RAMONA5-FA For Use in BWR Stability Calculations  
01/24/2011 Draft Final Revision 2 to Regulatory Guide 1.174 and Revision 1 to Regulatory Guide 1.177 02/04/2011
01/24/2011 Draft Final Rule, "Enhancements to Emergency Preparedness," and Related Regulatory Guidance Documents 02/15/2011
01/24/2011 Report on the Safety Aspects of the Southern Nuclear Operating Company Combined License Application for Vogtle Electric Generating Plant, Units 3 and 4 03/03/2011
01/19/2011 Report on the Safety Aspects of the Aircraft Impact Assessment for the Westinghouse Electric Company AP1000 Design Certification Amendment Application 02/09/2011
01/07/2011 Report of the Safety Aspects of the License Renewal Application for the Kewaunee Power Station 02/09/2011

Page Last Reviewed/Updated Friday, March 13, 2020