ACRS 1988 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
02/16/1988 ACRS Comments On SECY-87-314, Interim Policy Statement On Maintenance Of Nuclear Power Plants, Dated December 30, 1987
02/16/1988 ACRS Comments On Development Of A Method To Establish Priorities For Research Activities
02/17/1988 ACRS Comments On Selected FY 1988 NRC Radioactive Waste Management Research Programs
02/17/1988 Letter to Honorable George H. W. Bush, President of the Senate
02/19/1988 ACRS Report On The Tennessee Valley Authority's Management Reorganization
03/15/1988 ACRS Comments On the Need For Greater Coherence Among New Regulatory Policies
03/15/1988 ACRS Reports On The Restart Of The Sequoyah Nuclear Plant
03/15/1988 ACRS Comments On Embrittlement Of Structural Steel
03/15/1988 ACRS Comments On Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement Of Reactor Vessel Materials" Dated March 1988
04/12/1988 Program To Implement The Safety Goal Policy --ACRS Comments
04/12/1988 Effectiveness Of Programs Relating To Generic And Unresolved Safety Issues -- ACRS Comments
04/12/1988 Proposed Resolution Of USI A-47, "Safety Implications Of Control Systems"--ACRS Comments
04/12/1988 ACRS Review Of Shutdown Nuclear Power Plants
04/12/1988 Updated Policy Statement On Training And Qualification Of Nuclear Power Plant Personnel--ACRS Comments
04/12/1988 ACRS Waste Management Subcommittee Report On Q-List Technical Position
04/13/1988 Proposed Rule On Fitness For Duty Program --ACRS Comments
05/10/1988 Proposed Generic Letter On Individual Plant Examinations And The Proposed Integrated Safety Assessment Program II
05/10/1988 Proposed Commission Policy Statement On The Professional Conduct Of Nuclear Power Plant Operators (SECY-88-57)
05/10/1988 Proposed Revision Of The ECCs Rule Contained In 10 CFR 50.46 And Appendix K
05/10/1988 Fire Risk Scoping Study
05/10/1988 Revision 2 To Regulatory Guide 1.100, "Seismic Qualification Of Electric And Mechanical Equipment for Nuclear Power Plants"
06/07/1988 NRC Research Related To Heat Transfer And Fluid Transport In Nuclear Power Plants
06/07/1988 NRC Proposed Rule On Early Site Permits, Standard Design Certification, And Combined Licenses For Nuclear Power Reactors
06/07/1988 Proposed Revisions Of 10 CFR 20, "Standards For Protection Against Radiation"
06/07/1988 Inservice Inspection Of Boiling Water Reactor Pressure Vessels
06/07/1988 Rulemaking On Emergency Planning And Preparedness
06/07/1988 The Babcock & Wilcox Owners Group Safety And Performance Improvement Program
06/07/1988 Proposed Priority Rankings Of Generic Issues: Fifth Group
07/20/1988 Comments On The NRC Staff's Draft Safety Evaluation Of The Westinghouse Topical Report, WCAP-10924, "Westinghouse Large-Break LOCA Best-Estimate Methodology"
07/20/1988 Report On Key Licensing Issues Associated With DOE Sponsored Reactor Designs
07/20/1988 Report On Proposed Revised Policy Statement On Nuclear Power Plant Staff Working Hours
07/20/1988 Report On The Integration Plan For Closure Of Severe Accident Issues (SECY-88-147)
08/16/1988 Proposed Resolution Of USI A-17, "Systems Interactions In Nuclear Power Plants"
08/16/1988 Proposed Resolution Of USI A-47, "Safety Implications Of Control Systems"
08/16/1988 Report On NUREG-1150, "Reactor Risk Reference Document"
09/13/1988 NRC Staff's TVA Lessons Learned Effort
09/13/1988 Proposed Rulemaking Related To Maintenance Of Nuclear Power Plants
09/13/1988 Proposed Resolution Of Unresolved Issue 99, "Improved Reliability Of RHR Capability In PWRs"
09/14/1988 Proposed Restart Of The Pilgrim Nuclear Power Station
09/14/1988 Proposed Resolution Of Unresolved Safety Issue A-45, "Shutdown Decay Heat Removal Requirements"
10/11/1988 ACRS Action On The Proposed Amendment Of CFR 50, Appendix J, "Primary Containment Leakage Testing For Water-Cooled Power Reactors"
10/13/1988 Preapplication Safety Evaluation Report For The Modular High Temperature Gas Cooled Reactor
10/13/1988 Licensing Of All Chemical Isotope Enrichment, Inc. Facilities
11/22/1988 Safety Evaluation Report For The "Power Reactor Inherently Safe Module" (PRISM) Design
11/22/1988 ACRS Action On Proposed Regulatory Guide 1.9, Revision 3, "Selection, Design, Qualification, Testing, And Reliability Of Diesel Generator Units As Onsite Electric Power Systems At Nuclear Power Plants"
11/22/1988 ACRS Action On Proposed Regulatory Guide, Task No. EE-006-5, "Qualification Of Safety-Related Lead Storage Batteries For Nuclear Power Plants"
12/20/1988 Equipment Qualification-Risk Scoping Study

Page Last Reviewed/Updated Thursday, July 17, 2025