ACRS 1982 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/14/1982 ACRS Comments On Rulemaking Concerning Staffing At Nuclear Power Plants and Draft Policy Statement
12/13/1982 ACRS Report on the Systematic Evaluation Program Review of the Millstone Nuclear Power Station, Unit 1
12/13/1982 ACRS Report on the Systematic Evaluation Program Review of the Dresden Nuclear Power Station, Unit 2
12/13/1982 ACRS Report on Sequoyah Nuclear Plant Units 1 and 2 Hydrogen Control System
11/09/1982 ACRS Report on the NRC Systematic Evaluation Program Review of the Oyster Creek Nuclear Generating Station
11/09/1982 ACRS Comments On The NRC Intergrated Human Factors Program Plan
10/14/1982 ACRS Report On Draft NRC Staff Evaluation Of Pressurized Thermal Shock Dated September 13, 1982
10/13/1982 ACRS Report on Washington Public Power Supply System Nuclear Project No. 2
10/13/1982 ACRS Comments On NRC Program To Address Concerns With Thermal Hydraulic Behavior Of B - W Plants
09/14/1982 Review Of The Transportation Certification Branch Of the Office Of Nuclear Material Safety And Safeguards
09/14/1982 ACRS Report On SECY-82-326 Backfitting Proposed Rule and Policy Statement
09/14/1982 ACRS Report On SECY-82-1A
09/14/1982 ACRS Action On The Proposed Revisions To 10 CFR Part 71, Packaging Of Radioactive Material For Transport
09/14/1982 ACRS Action On The Proposed Rev. 1 To Reg. Guide 1.145
08/24/1982 Report By The ACRS Subcommittee On Transportation Of Radioactive Materials
08/18/1982 Control Room Habitability
08/18/1982 ACRS Report on the Systematic Evaluation Program Review of the R.E. Ginna Nuclear Power Plant
08/18/1982 ACRS Report on Grand Gulf Nuclear Station Unit 1
08/18/1982 ACRS Comments On - Nuclear Plant Severe Accident Research Plan
08/16/1982 ACRS Report on Watts Bar Nuclear Plant, Units 1 and 2
07/13/1982 ACRS Report on the Suitability of the Clinch River Breeder Reactor Plant Site
07/13/1982 ACRS Report on the Perry Nuclear Power Plant, Unit 1
06/08/1982 Letter To Honorable Victor Gilinsky
06/08/1982 ACRS Interim Report on Midland Plant, Units 1 and 2
06/07/1982 Procedures For ACRS Review Of the NRC Long-Range Research Plan
06/07/1982 ACRS Report On Pressurized Thermal Shock
05/14/1982 Foundation Problems and Related Remedial Actions at the Midland Plant Site
05/12/1982 Rulemaking On Environmental Qualification Of Electric Equipment
05/12/1982 Proposed Modifications to the North Anna Station Unit 2 Low Pressure Injection and Residual Heat Removal Systems
05/11/1982 ACRS Report on the Wolf Creek Generating Station, Unit No. 1
05/11/1982 ACRS Report on the Systematic Evaluation Program, Phase II, and its Application to the Palisades Plant
05/11/1982 ACRS Report On Emergency Response Capabilities At Nuclear Power Plants
04/06/1982 Instrumentation For Monitoring Water Level Or Inventory
04/05/1982 Reliability Of The Shutdown Heat Removal System On The System 80 Design
04/05/1982 Comments On NRC Long-Range Research Plan, FY 1984-1988 (Draft NUREG-0784)
03/09/1982 Report on the Waterford Steam Electric Station Unit 3
03/09/1982 Report on the Byron Station Units 1 and 2
03/09/1982 Report on Systems Interactions Study for Indian Point Nuclear Generating Unit 3
03/09/1982 Report on Clinton Power Station Unit 1
03/09/1982 Licensee Event Report Rulemaking
02/09/1982 Licensees Safety Review Committees
02/08/1982 NRC Policy On The Severe Accident Rulemaking And Related Matters
01/08/1982 Systems Interactions

Page Last Reviewed/Updated Thursday, July 17, 2025