Eden Radioisotopes, LLC

atomic-alchemy.jpg
 
Project Overview
 
On August 7, 2023, Eden Radioisotopes, LLC, submitted to the U.S. Nuclear Regulatory Commission (NRC) an updated letter of intent to submit construction permit and operating license applications for a 2 MW light-water reactor with hot cells and target fabrication facility. The NRC staff is currently engaged in pre-application interactions with Eden related to Eden’s medical isotope production facility called the Eden Isotope Production Complex, which would be located near Eunice, New Mexico.
 
For more information, please see Eden Radioisotopes (NRC Docket 99902077).
 
To subscribe to Eden Radioisotopes, LLC  updates via GovDelivery, select Eden Radioscopes from the Non-Power Production and Utilization Facilities (NPUFs)  category, Medical Radioisotope Irradiation and Processing Facilities after entering your email into the GovDelivery system.
 
Pre-Application Activities
 

Product Type Reference Status
Regulatory Engagement Plan Regulatory Engagement Plan ML25181A768 No review requested
Preapplication Readiness Assessment of the Eden Draft Preliminary Safety Evaluation Report Assessment ML25017A058 Feedback Provided
ML25115A140
Preapplication Readiness Assessment of Eden Draft Environmental Report Assessment ML24065A500 Feedback Provided
ML24115A130
Safeguards Information Protection Plan Plan ML20318A026
ML20283A477
Feedback Provided
ML20300A541
 
 
NRC Contacts for Eden Radioisotope Pre-application Activities
Project Managers Linh Tran
(301) 415-4103
 
Andrew Miller
(301) 415-1080