Atomic Alchemy, Inc.
On this page:
- Project Overview
- Pre-Application Activities
- NRC Contacts for Atomic Alchemy Pre-application Activities
Project Overview
On August 20, 2019, Atomic Alchemy, Inc., submitted to the U.S. Nuclear Regulatory Commission (NRC) a letter of intent to submit construction permit and operating license applications for four non-power, pool-type reactors to produce radioisotopes. The NRC staff is currently engaged in pre-application interactions with Atomic Alchemy related to the Versatile Isotope Production Reactors (VIPRs) Atomic Alchemy plans to construct.
For more information, please see Atomic Alchemy (NRC Docket 99902080).
To subscribe to Atomic Alchemy, Inc updates via GovDelivery, select Atomic Alchemy from the Non-Power Production and Utilization Facilities (NPUFs) category, Medical Radioisotope Irradiation and Processing Facilities after entering your email into the GovDelivery system.
Pre-Application Activities
Product | Type | Reference | Status |
Regulatory Engagement Plan for Non-Power Production or Utilization Facility – Q3 2025 Update | Regulatory Engagement Plan | ML25175A002 | No review requested |
Preapplication Engagement – Readiness Assessment of Chapter 3 and Chapter 7 of the Draft Preliminary Safety Analysis Report | Assessment | ML23290A030 | Feedback Provided ML24127A070 |
Preapplication Engagement – Readiness of the Preliminary Safety Analysis Report | Assessment | ML22286A167 | Feedback Provided ML23086C032 |
Quality Assurance Program Description (QAPD) | Topical Report | ML20290A977 | Safety Evaluation Issued ML22217A125 |
Standard Review Plan Conformance for Atomic Alchemy’s Non-Power Production and Utilization Facility | Topical Report | ML21176A211 | Withdrawn ML22339A122 |
Submittal of Non-Power Modular Reactor Multi-Unit Site Regulatory Structure Plan | White Paper | ML22073A252 | Withdrawn ML23338A173 |
Principal Design Criteria for Atomic Alchemy’s Non-Power Production and Utilization Facility | Topical Report | ML21169A042 | Withdrawn ML22339A122 |
Submittal Of Atomic Alchemy’s Non-Power Modular Reactors: Multi-Unit Site Phased Construction Plan -Position Paper | White Paper | ML21363A059 | Withdrawn ML23338A173 |
NRC Contacts for Atomic Alchemy Pre-Application Activities
Project Managers | Linh Tran (301) 415-4103 Brooke Gallegher (301) 415-5280 Bradley Stamler (301) 415-1147 |
Contact a Public Affairs Officer |