Final Safety Evaluations for Turkey Point, Units 6 and 7 Application

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of its review of the COL application that FPL submitted for Turkey Point, Units 6 & 7.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and Interfaces 11/10/16
2 Site Characteristics 11/10/16
3 Design of Structures, Components, Equipment, and Systems 11/10/16
4 Reactor 11/10/16
5 Reactor Coolant System and Connected Systems 11/10/16
6 Engineered Safety Features 11/10/16
7 Instrumentation and Controls 11/10/16
8 Electric Power 11/10/16
9 Auxiliary Systems 11/10/16
10 Steam and Power Conversion 11/10/16
11 Radioactive Waste Management 11/10/16
12 Radiation Protection 11/10/16
13 Conduct of Operations 11/10/16
14 Initial Test Program 11/10/16
15 Accident Analysis 11/10/16
16 Technical Specifications 11/10/16
17 Quality Assurance 11/10/16
18 Human Factors Engineering 11/10/16
19 Response to Severe Accident Policy Statement 11/10/16
19A Loss of Large Areas of the Plant Due to Explosions or Fires 11/10/16
20 Requirements Resulting from Fukushima Near-Term Task Force Recommendations 11/10/16
21 Design Changes Proposed in Accordance with ISG-11 11/10/16
22 Conclusions 11/10/16
Appx A Post-COL Activities: License Conditions, ITAAC, and FSAR Commitments 11/10/16
Appx B Chronology 11/10/16
Appx C Electronic Request for Additional Information Database 11/10/16
Appx D References 11/10/16
Appx E Principal Contributors 11/10/16
Appx F Reports by the ACRS 11/10/16
  Transmittal Letter 11/10/16

Page Last Reviewed/Updated Sunday, September 18, 2022