No. |
Title |
Date Issued |
1. |
Inspection Approach/Phase Schedule Communication Letter |
12/18/2015 |
2. |
OEDO-15-00479: David Lochbaum and Others 2.206 Petition Regarding Pilgrim's Current License Basis for Flooding Acknowledgement Letter (CAC No. MF6460) |
02/11/2016 |
3. |
Pilgrim Nuclear Power Station -- Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 |
03/03/2016 |
4. |
NRC Notice of Violation (NRC Investigation Report No. 1-2015-005) (Fire watch NOV) |
04/11/2016 |
5. |
NRC Annual Assessment Meeting Summary |
04/13/2016 |
6. |
NRC Annual Assessment Meeting Presentation |
04/13/2016 |
7. |
Entergy Annual Assessment Meeting Presentation |
04/13/2016 |
8. |
2016 AARM Meeting Agenda |
06/02/2016 |
9. |
2016 AARM Slides |
06/02/2016 |
10. |
2016 AARM Transcript |
06/02/2016 |
11. |
2016 AARM Meeting SRM |
06/02/2016 |
12. |
LER 2016-001-00 |
06/09/2016 |
13. |
LTR-15-0319-1, LTR-15-0375-1 – Response Letter 2.206 Petition Re: Pilgrim Severe Weather Emergency Preparedness |
06/22/2016 |
14. |
LER 2016-002-00 |
06/30/2016 |
15. |
Pilgrim Extension Request for Order EA-13-109 Schedule Requirements |
07/13/2016 |
16. |
LER 2016-003-00 |
07/25/2016 |
17. |
LER 2016-004-00 |
07/25/2016 |
18. |
Interim Staff Response to Reevaluated Flood Hazards Submitted in Pilgrim Response to the 10CFR50.54(f) Information Request |
08/03/2016 |
19. |
PNPS Letter – Request for Deferral of Beyond-DBE Flooding Actions |
08/18/2016 |
20. |
PNPS Letter – Request for Deferral Beyond-DBE Seismic Actions |
08/18/2016 |
21. |
LER 2016-002-001 Supplement |
08/18/2016 |
22. |
Entergy Announces Pilgrim Readiness for Phase C Inspection |
08/31/2016 |
23. |
PNP Ltr 2.16.057 – LER 2016-004 Retraction |
09/09/2016 |
24. |
Formal Notification of Phase C IP 95003 Inspection dates |
10/13/2016 |
25. |
LER 2016-005-00 |
11/04/2016 |
26. |
LER 2016-006-00 |
11/04/2016 |
27. |
Pilgrim Response to NRC Generic Letter 2016-01 , "Monitoring of Neutron-Absorbing Material in Spent Fuel Pools" |
11/03/2016 |
28. |
Licensee Event Report 2016-007-00 – Pilgrim Nuclear Power Station Regarding Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction |
11/04/2016 |
29. |
NRC Response to Town of Plymouth regarding Pilgrim |
12/13/2016 |
30. |
JRWA Letter Expressing Concerns About Flooding Risks at Pilgrim Nuclear Power Station |
12/26/2016 |
31. |
Letter from Massachusetts Attorney General Requesting NRC meet with public to discuss inadvertently released email |
01/04/2017 |
32. |
Licensee Event Report 2016-009-00 – HPCI Declared Inoperable Due to Failure of IST Surveillance Test |
01/05/2017 |
33. |
Letter from Chairman responding to Massachusetts Attorney General Request for NRC to meet with public to discuss inadvertently released email |
01/11/2017 |
34. |
Letter to Mary Lampert, Director, Pilgrim Watch, from Stephen Koenick, LPL1, DORL/NRR Re: Pilgrim Nuclear Power Station - Liability and Holtec Guarantees |
01/17/2017 |
35. |
Notice of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim Nuclear Power Station |
01/19/2017 |
36. |
Pilgrim Watch response to Stephen Koenick January 7 reply to our October 27, 2016 email regarding liability and Holtec guarantees at Pilgrim Nuclear Power Station |
01/24/2017 |
37. |
Press Release-I-17-002: NRC Plans Plymouth Public Meeting to Discuss Reviews at Pilgrim Nuclear Power Plant |
01/30/2017 |
38. |
Pilgrim Nuclear Power Station – Petition Received at Pilgrim 95003 Public Meeting from Pilgrim Legislative Advisory Coalition |
01/31/1017 |
39. |
LTR-16-0609 NRC Response to Senator Viriato M. deMacedo, et al, Plymouth and Barnstable District, Massachusetts Senate, letter regarding concern about the current state of Pilgrim Nuclear Power Station |
02/01/2017 |
40. |
Pilgrim Nuclear Power Station – Request for Approval of Certified Fuel Handler Training and Retraining Program |
02/02/2017 |
41. |
Pilgrim Nuclear Power Station – Request for Exemption from Specific Provisions in 10 CFR 73.55 |
02/07/2017 |
42. |
Pilgrim Nuclear Power Station – ISFSI Radioactive Effluent Release Report for 2016 |
02/10/2017 |
43. |
LER 16-010-00 for Pilgrim Nuclear Power Station Regarding MSIV Inoperability Led to a Condition Prohibited by the Plant's Technical Specifications |
02/13/2017 |
44. |
Status of Decision on Petitioners Request for Hearing Regarding Entergy's Request for Extension to Comply with NRC Order EA-13-109 |
02/17/2017 |
45. |
Region I/DRP Response to James R. Garb, Pilgrim Legislative Advisory Coalition re: Degraded Safety Status of the Pilgrim Nuclear Power Station |
02/21/2017 |
46. |
NRC Response to Jones River Watershed Association Letter Dated December 26, 2016 to the NRC on Pilgrim Nuclear Power Station |
02/27/2017 |
47. |
01/31/2017 – Summary of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim |
02/28/2017 |
48. |
NRC Response to Petition Received at Pilgrim 95003 Public Meeting from Pilgrim Legislative Advisory Coalition |
03/06/2017 |
49. |
Pilgrim Nuclear Power Station – Notice of Public Meeting (Annual Assessment and 95003 Inspection Exit Meeting) - 3/21/2017 |
03/10/2017 |
50. |
Press Release-I-17-005: NRC to Hold Pilgrim Nuclear Plant Public Exit Meeting for Inspection, Annual Assessment Discussion |
03/14/2017 |
51. |
LER 17-001-00 for Pilgrim Regarding Reactor Building Isolation Dampers Failed to Isolate |
03/15/2017 |
52. |
Pilgrim Nuclear Power Station - Supplement to Requests for Relief from ASME Section XI Volumetric Examination Requirements - Fourth 10-Year Interval |
03/16/2017 |
53. |
3/21/2017 – Annual Assessment/95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station - Speaker Sign-Up Sheets |
03/21/2017 |
54. |
Statement from the Office of U.S. Senator Elizabeth Warren – NRC Annual Meeting, Plymouth, MA |
03/21/2017 |
55. |
Statement of Congressman Keating – NRC Annual Assessment Meeting for PNPS - March 21, 2017. |
03/21/2017 |
56. |
Statement of Senator Edward J. Markey – NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - March 21, 2017 |
03/21/2017 |
57. |
3/21/2017 – Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station – Entergy Presentation Slides |
03/21/2017 |
58. |
3/21/2017 – Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station – NRC Presentation Slides |
03/21/2017 |
59. |
03/21/2017 Transcript of Annual Assessment/95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station |
03/21/2017 |
60. |
3/21/2017 – Annual Assessment/95003 Inspection Exit Summary Meeting for Pilgrim Nuclear Power Station |
03/21/2017 |
61. |
Pilgrim, License Amendment Request - Cyber Security Plan Implementation Schedule |
03/30/2017 |
62. |
Nuclear Property Damage Insurance [10 CFR 50.54(w)(3)] |
03/30/2017 |
63. |
Entergy Nuclear Operations, Inc. – Decommissioning Funding Status Report per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v). |
03/31/2017 |
64. |
Pilgrim Nuclear Power Station - Issuance of Relief Request Nos. PNPS-ISI-004 and PNPS-ISI-005 for Relief from American Society of Mechanical Engineers Code, Section XI, Volumetric Examination Requirements. |
04/03/2017 |
65. |
Commission Memorandum and Order regarding PW request for Hearing related to Fukushima Orders (CLI-17-06). |
04/06/2017 |
66. |
Notification for Information Only – Pilgrim Deviation from EPRI Report 3002000091, Rev. 1 |
04/10/2017 |
67. |
OEDO-15-00479 – 2.206 Petition regarding Pilgrim current licensing basis for flooding – 60 DAY STATUS (CAC NO. MF6460) |
04/10/2017 |
68. |
Pilgrim Nuclear Power Station – Approval of Certified Fuel Handler Training and Retraining Program (CAC No. MF9275) |
04/12/2017 |
69. |
Pilgrim Nuclear Power Station – NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding External Events. |
04/17/2017 |
70. |
Pilgrim Nuclear Power Station – Relaxation of the Schedule Requirements for Order EA-13-109: Order Modifying Licenses With Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions. |
04/17/2017 |
71. |
3/21/2017 – Annual Assessment/95003 Inspection Exit Summary Meeting for Pilgrim Nuclear Power Station. |
04/18/2017 |
72. |
Pilgrim Nuclear Power Station – Relief Requests PNPS-ISI-001 and PNPS-ISI-002, Relief from ASME Code Volumetric Examination Requirements for the Fourth 10-Year Inservice Inspection Interval (CAC Nos. MF8092 and MF8093) |
05/12/2017 |
73. |
Pilgrim Nuclear Power Station – Letter, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler (CAC No. MF9274) |
05/16/2017 |
74. |
Pilgrim – Fuel Cycle 22, Core Operating Limits Report, Revision 37 |
05/12/2017 |
75. |
Pilgrim – Annual Radiological Environmental Operating Report for January 1 through December 31, 2016 |
05/12/2017 |
76. |
Pilgrim – Annual Radioactive Effluent Release Report for January 1 through December 31, 2016 |
05/12/2017 |
77. |
OEDO-15-00479: Federal Register Notice re: 2.206 Petition Regarding Pilgrim's Current License Basis for Flooding (CAC No. MF6460) |
02/11/2016 |
78. |
Supplemental to Technical Specifications Proposed Change – Administrative Controls for Permanently Defueled Condition |
05/25/2017 |
79. |
LER 17-002-00 for Pilgrim Regarding Isolation of HPCI |
05/25/2017 |
80. |
LER 17-003-00 for Pilgrim Nuclear Power Station Regarding Pressure Suppression Pool Declared Inoperable Due to High Water Level |
05/25/2017 |
81. |
LER 17-004-00 for Pilgrim Nuclear Power Station Regarding Secondary Containment Testing Led to Loss of Safety Function to Both Trains of Standby Gas Treatment System |
06/02/2017 |
82. |
LER 17-005-00 for Pilgrim Regarding 10 CFR 50, Appendix J, Option B, Leak Rate Criteria Exceeded |
06/07/2017 |
83. |
LER 17-006-00 for Pilgrim Nuclear Power Station Regarding Source Range Monitor Inoperable During Fuel Movement |
06/13/2017 |
84. |
LER 16-010-01 for Pilgrim Nuclear Power Station re MSIV Inoperability |
06/14/2017 |
85. |
LER 17-007-00 for Pilgrim Regarding Potential Inoperability of Safety Relief Valve 3A |
06/22/2017 |
86. |
Pilgrim – NRC Investigation Report 1-2016-011 |
06/28/2017 |
87. |
Pilgrim Nuclear Power Station's Sixth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109) |
06/30/2017 |
88. |
Pilgrim Nuclear Power Station – Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304) |
07/10/2017 |
89. |
Pilgrim Nuclear Power Station: Regulatory Conference Presentation 07-13-17 |
07/13/2017 |
90. |
Press Release-I-17-026: NRC to Hold Regulatory Conference with Entergy Regarding Apparent Violation at Pilgrim Nuclear Power Plant |
07/12/2017 |
91. |
Pilgrim Nuclear Power Station Recovery Plan |
07/28/2017 |
92. |
Confirmatory Action Letter – Pilgrim Nuclear Power Station |
08/02/2017 |
93. |
Press Release-I-17-028: NRC Issues Confirmatory Action Letter to Pilgrim Nuclear Power Plant on Safety Performance Improvement Commitments |
08/02/2017 |
94. |
LER 17-008-00 for Pilgrim re 480V Bus B6 Auto Transfer Function Degraded Due to Time Delay Relay Failure |
06/30/2017 |
95. |
Pilgrim Nuclear Power Station – Final Significance Determination For A Green Finding And Results Of Regulatory Conference – Inspection Report 05000293/2017008 |
08/09/2017 |
96. |
LER 17-010-00 for Pilgrim re Air Accumulation Creates Small Void in Core Spray Discharge Piping |
08/07/2017 |
97. |
LER 17-009-00 for Pilgrim Nuclear Power Station Regarding Potential Primary Containment System lnoperability Due to Relay Concerns |
07/17/2017 |
98. |
LER 17-001-01 for Pilgrim Nuclear Power Station Regarding Reactor Building Isolation Dampers Failed to Isolate |
07/17/2017 |
99. |
Requalification Program Inspection – Pilgrim Nuclear Power Station |
08/22/2017 |
100. |
Pilgrim Nuclear Power Station, Transmittal of Reply to a Notice of Violation, EA-17-030 |
08/11/2017 |
101. |
LER 17-011-00 for Pilgrim Nuclear Power Station Regarding Simultaneously Opened Reactor Building Airlock Doors Caused Loss of Secondary Containment |
08/15/2017 |
102. |
OEDO-15-00479 – E-mail to David Lochbaum Re. 2.206 Petition Regarding Pilgrim Nuclear Power Station's Current Licensing Basis for Flooding; 60-Day Status Report (CAC NO. MF6460; EPID L-2015-CRS-0002) |
10/10/2017 |
103. |
Presentations on Reactor Decommissioning at MA NDCAP at Plymouth MA Public Meeting Oct 18, 2017 |
10/23/2017 |
104. |
LER 17-008-01 for Pilgrim Nuclear Power Station Regarding Supplement to 480V Bus B6 Auto Transfer Function Degraded Due to Time Delay Relay Failure |
11/17/2017 |
105. |
LER 17-003-01 for Pilgrim Nuclear Power Station Regarding Supplement to Suppression Pool Declared Inoperable Due to High Water Level |
11/30/2017 |
106. |
LER 17-012-00 for Pilgrim Nuclear Power Station Regarding Start-Up Transformer Degraded Voltage Relay Found Outside Technical Specification Limit |
11/30/2017 |
107. |
Pilgrim Nuclear Power Station's Seventh Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions. |
12/8/2017 |
108. |
OEDO-15-00479 – 2.206 Petition Regarding Pilgrim Nuclear Power Station's Current Licensing Basis for Flooding – 60-Day Status Report (CAC NO. MF6460; EPID L-2015-CRS-0002) |
12/11/2017 |
109. |
LER 17-007-01 for Pilgrim Nuclear Power Station Regarding Supplement to Potential Inoperability of Safety Relief Valve 3A |
01/12/2018 |
110. |
LER 17-009-01 for Pilgrim Nuclear Power Station Regarding Supplement to Potential Primary Containment System Inoperability Due to Relay Concerns |
01/18/2018 |
111. |
LER 17-013-00 for Pilgrim Nuclear Power Station Regarding Reportable Conditions Involving Standby Gas Treatment System and Secondary Containment lnoperability Not Reported During the Previous Three Years |
02/12/2018 |
112. |
OEDO-15-00479 – 2.206 Petition Regarding Pilgrim Nuclear Power Station's Current Licensing Basis for Flooding – 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) |
02/12/2018 |
113. |
02-14-18 Acknowledgement Letter to Senators Warren, Markey and Keating Regarding the Pilgrim Plant |
02/21/2018 |
114. |
03/27/2018 – Notice of Category 1 Public Meeting – Annual Assessment Meeting for Pilgrim Nuclear Power Station |
03/14/2018 |
115. |
Press Release-I-18-003: NRC Staff to Conduct Public Meeting to Discuss 2017 Performance of Pilgrim Nuclear Power Plant |
03/26/2018 |
116. |
Response to Request for Information Senator Elizabeth Warren, Senator Edward Markey, and Representative William Keating Letter dated February 12, 2017 (Enclosure) |
03/26/2018 |
117. |
LER 2018-001-00 for Pilgrim Nuclear Power Station Regarding Manual Reactor Scram Due To Loss of One Offsite Transmission Line |
03/28/2018 |
118. |
LER 2018-002-00 for Pilgrim re: Diesel Generator A Inoperable, a Condition Prohibited by the Plant Technical Specifications |
03/28/2018 |
119. |
LER 2018-003-00 for Pilgrim, Target Rock Relief Valve Pilot Assembly Failed As-Found Lift Test, a Condition Prohibited by Plant Technical Specifications |
04/11/2018 |
120. |
Pilgrim, License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition |
01/12/2018 |
121. |
Response to Request for Supplemental Information Regarding Generic Letter 2016-01, "Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools" for Grand Gulf Nuclear Station Unit 1 and Pilgrim Nuclear Power Station. |
02/08/2018 |
122. |
Revise the Pilgrim Emergency Plan to Address the Permanently Defueled Condition |
02/20/2018 |
123. |
Pilgrim Nuclear Power Station – NRC Investigation Report No. 1 -2017-011 and Notice of Violation |
02/27/2018 |
124. |
Pilgrim, and Independent Spent Fuel Storage Installation – Radioactive Effluent Release Report |
02/28/2018 |
125. |
FEMA Review Requested Of Revision To The Pilgrim Nuclear Power Station Emergency Plan To Address The Permanently Defueled Condition. |
03/08/2018 |
126. |
Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 |
03/13/2018 |
127. |
Press Release-IV-18-002: NRC Issues Confirmatory Order to Entergy. |
03/14/2018 |
128. |
Pilgrim Nuclear Power Station Notification of Changes to Comprehensive Recovery Plan and Area Action Plan Action Completion Dates. |
03/14/2018 |
129. |
03/27/2018 – Notice of Category 1 Public Meeting – Annual Assessment Meeting for Pilgrim Nuclear Power Station |
03/14/2018 |
130. |
Response to Request for Information Senator Elizabeth Warren, Senator Edward Markey, and Representative William Keating Letter dated February 12, 2017 (Enclosure) |
03/19/2018 |
131. |
Pilgrim, Anchor Darling Double Disc Gate Valve Information and Status. |
04/16/2018 |
132. |
04-25-18 FEMA Letter to NRC, entitled "FEMA Review of Revision to Pilgrim Nuclear Power Station Emergency Plan to Address the Permanently Shutdown Condition |
04/25/2018 |
133. |
Statement of Congressman William R. Keating – NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station – 03/27/2018 |
05/07/2018 |
134. |
03/27/2018 – Transcript of Annual Assessment Meeting for Pilgrim Nuclear Power Station. |
05/07/2018 |
135. |
03/27/2018 – Annual Assessment Meeting for Pilgrim Nuclear Power Station – Entergy Presentation Slides. |
05/07/2018 |
136. |
Statement of Senator Edward J. Markey – NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station – 03/27/2018. |
05/07/2018 |
137. |
03/27/2018 – Annual Assessment Meeting for Pilgrim Nuclear Power Station – NRC Presentation Slides. |
05/07/2018 |
138. |
Letter to Power Reactor Licensees – U.S. Nuclear Regulatory Commission Analysis of Licensees' 2017 Decommissioning Funding Status Reports. |
05/08/2018 |
139. |
03/27/2018 – Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station |
05/09/2018 |
140. |
LER 2018-004-00 for Pilgrim Nuclear Power Station, Automatic Emergency Diesel Generator System Actuation Caused By Loss of Offsite Power. |
05/14/2018 |
141. |
LER 2017-013-01 for Pilgrim Nuclear Power Station re Supplement to Reportable Conditions Involving Standby Gas Treatment System and Secondary Containment Inoperability Not Reported During the Previous Three Years. |
05/14/2018 |
142. |
Pilgrim, Submittal of Annual Radiological Environmental Operating Report for January 1 through December 31, 2017 |
05/15/2018 |
143. |
Pilgrim Nuclear Power Station – Annual Radioactive Effluent Release Report for January 1 through December 31, 2017. |
05/15/2018 |
144. |
Responses to Request for Information – Senator Edward Markey Letter dated April 23, 2018 (Enclosure) |
05/29/2018 |
145. |
Pilgrim Nuclear Power Station – Reply to Notice of Violation (NRC Investigation Report No. 1-2017-011) |
05/30/2018 |
146. |
Entergy Letter dated June 1, 2018 to David Lew regarding Pilgrim Notification of Changes to Comprehensive Recovery Plan |
06/01/2018 |
147. |
Pilgrim Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station. |
06/06/2018 |
148. |
Revision to Confirmatory Action Letter – Pilgrim Nuclear Power Station. |
06/07/2018 |
149. |
Pilgrim 95003 Evaluation and Corrective Actions Memorandum dated June 7, 2018 |
06/07/2018 |
150. |
Pilgrim 95003 Evaluation – Memorandum regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station |
06/07/2018 |
151. |
Inspection Procedure 95003: Evaluation Of NRC Assessment And Inspection Processes At Pilgrim Nuclear Power Station. |
06/11/2018 |
152. |
2018 AARM Meeting Agenda |
06/19/2018 |
153. |
2018 AARM Slides |
06/19/2018 |
154. |
2018 AARM Transcript |
06/19/2018 |
155. |
2018 AARM Meeting SRM |
06/19/2018 |
156. |
Pilgrim Nuclear Power Station – Baseline Security Inspection Report 05000293/2018410 (Letter Only). |
06/20/2018 |
157. |
Pilgrim Nuclear Power Station – Retraction of Licensee Event Report 2018-002-00, Diesel Generator A Inoperability, a Condition Prohibited by the Plant Technical Specifications. |
06/21/2018 |
158. |
Pilgrim Nuclear Power Station – Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E. |
07/03/2018 |
159. |
08/28/18 – Letter to Representative William Keating from Chairman Svinicki responds to his letter regarding the Proposed Sale of Pilgrim Nuclear Power Station by Entergy Nuclear Operations Inc. to a Subsidiary of Holtec International |
09/05/2018 |
160. |
Pilgrim Nuclear Power Station - NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides |
09/19/2018 |
161. |
Pilgrim Nuclear Power Station - Letter to Pilgrim Watch and Town of Duxbury Nuclear Advisory Committee Related to Questions Regarding Planned License Transfer Application |
09/24/2018 |
162. |
LER 2018-005-00 for Pilgrim Nuclear Power Station, Condition Prohibited by Technical Specifications Involving Standby Gas Treatment System Pneumatic Leakage Rate |
09/25/2018 |
163. |
Pilgrim, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications |
09/25/2018 |
164. |
Pilgrim Nuclear Power Station - Closeout of Generic Letter 2016-01, "Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools" (CAC No. MF9424; EPID L-2016-LRC-0001) |
09/27/2018 |
165. |
Pilgrim Nuclear Power Station - Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan |
10/03/2018 |
166. |
2.206 Petition Regarding Pilgrim Nuclear Power Station's Current Licensing Basis for Flooding - 60 Day Status Report (OEDO-15-00479) (CAC NO. MF6460; EPID L-2015-CRS-0002) |
10/10/2018 |
167. |
Attachments 1 & 2: Response to Request for Additional Information - License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition. Letters of Agreement Enclosed |
10/20/2018 |
168. |
Pilgrim, Submittal of Response to Request for Additional Information - License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition |
10/10/2018 |
169. |
Press Release-I-18-022: NRC Names New Senior Resident Inspector at Pilgrim Nuclear Plant |
10/10/2018 |
170. |
Revision to Confirmatory Action Letter - Pilgrim Nuclear Power Station |
10/11/2018 |
171. |
9/25/2018 Summary of Pre-submittal Meeting with Entergy Nuclear and Holtec International to Discuss Potential License Transfer Application for Pilgrim Nuclear Power Plant |
10/16/2018 |
172. |
LER 2017-012-01 for Pilgrim, Supplement to Start-Up Transformer Degraded Voltage Relay Found Outside Technical Specification Limit |
10/25/2018 |
173. |
Pilgrim, Request for Rescission of Security Orders. |
10/31/2018 |
174. |
Pilgrim Nuclear Power Station - Notification of Revised Post-Shutdown Decommissioning Activities Report and Revised Site-Specific Decommissioning Cost Estimate. |
11/16/2018 |
175. |
Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 50.82(a)(8)(I)(A). |
11/16/2018 |
176. |
Pilgrim Nuclear Power Station - Update to Spent Fuel Management Plan Pursuant to 10 CFR 50.54 (bb). |
11/16/2018 |
177. |
Post Shutdown Decommissioning Activities Report
Pilgrim Nuclear Power Station |
11/16/2018 |
178. |
Pilgrim Nuclear Power Station - Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A). |
11/16/2018 |
179. |
Pilgrim Nuclear Power Station - Triennial Fire Protection Inspection Report 05000293/2018015. |
11/21/2018 |
180. |
Pilgrim Nuclear Power Station - Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled Condition (EPID L-2018-LLA-0046). |
11/30/2018 |
181. |
Pilgrim, Response to Request for Additional Information - Exemption from the Requirements of 10 CFR 50.47 and Appendix E to 10 CFR Part 50. |
11/30/2018 |
182. |
Pilgrim, Response to Request for Additional Information - Exemption from the Requirements of 10 CFR 50.47 and Appendix E to 10 CFR Part 50. |
12/04/2018 |
183. |
Pilgrim, Submittal of Emergency Plan Revision. |
12/04/2018 |
184. |
Response to Request for Additional Information - License Amendment Request to Revise the Pilgrim Nuclear Power Station Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition
|
12/08/2018 |
185. |
Pilgrim Nuclear Power Station - Request for Relief and Rescission of Commission Order Modifying Licenses With Regard To Requirements for Beyond-Design-Basis External Events (Order EA-12-049). |
12/14/2018 |
186. |
Pilgrim Nuclear Power Station - Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Hardened Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109). |
12/14/2018 |
187. |
Pilgrim Nuclear Power Station - Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051). |
12/14/2018 |
188. |
Pilgrim - Application for Order Approving Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC (owner) and Holtec Decommissioning International, LLC (operator) (EPID L-2018-LLO-0003). |
12/17/2018 |
189. |
Pilgrim - Request for Withholding Info from Public Disclosure - 11/12/18 Affidavit Executed by A. Rosenlieb, Entergy and 11/14/18 Affidavit Executed by A. Ryan, Holtec International Re: Enclosure 1P, Equity Purchase and Sale Agreement (L-2018-LLO-0003). |
12/17/2018 |
190. |
Pilgrim Nuclear Power Station - Acceptance Review Letter, Review of Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate (EPID L-2018-LLL-0031). |
12/17/2018 |
191. |
Pilgrim Nuclear Power Station - Federal Register Notice, Notice of Receipt, Public Meeting, and Request for Comment on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate (EPID L-2018-LLL-0031). |
12/18/2018 |
192. |
Pilgrim - Acceptance Review Letter, Application for Order for Direct and Indirect Transfers of Control of Licenses, Conforming License Amendment, and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) (EPID L-2018-LLO-0003 and L-2018-LLE-0020). |
12/19/2018 |
193. |
Pilgrim - Acceptance Review Letter, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities (EPID L-2018-LLE-0019). |
12/20/2018 |
194. |
12/20/2018, Letter to the Honorable William Keating Responds to His Letter Commenting on Recent NRC Inspection Reports Issued for the Pilgrim Nuclear Power Station. |
12/20/2018 |
195. |
Arkansas Nuclear One, Indian Point Energy Center, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K. |
12/28/2018 |
196. |
Pilgrim - Letter, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC (EPID L-2018-LLO-0003). |
01/02/2019 |
197. |
Pilgrim - FRN, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC (EPID L-2018-LLO-0003). |
01/02/2019 |
198. |
Pilgrim Nuclear Power Station - Clarification of Post-Shutdown Decommissioning Activities Report. |
01/09/2019 |
199. |
Pilgrim - Response to Request for Additional Information - License Amendment Request to Revise the Technical Specifications - Permanently Defueled Technical Specifications. |
01/10/2019 |
200. |
Pilgrim Nuclear Power Station - Holtec Slides PSDAR Meeting 1-15-19. |
01/15/2019 |
201. |
Pilgrim Nuclear Power Station - Post-Shutdown Decommissioning Activities Report, NRC Public Meeting January 15, 2019. |
01/15/2019 |
202. |
Pilgrim Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019. |
01/15/2019 |
203. |
Pilgrim Nuclear Power Station - Public Meeting on Post-Shutdown Decommissioning Activities Report. |
01/15/2019 |
204. |
Revision to Confirmatory Action Letter - Pilgrim Nuclear Power Station. |
01/17/2019 |
205. |
Pilgrim Nuclear Power Station - NRC Investigation Report No. 1-2018-001 and Exercise of Enforcement Discretion. |
01/23/2019 |
206. |
Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate (EPID L-2018-LLL-0031). |
01/30/2019 |
207. |
Transcript for Public Meeting Held on Jan. 15, 2019, in Plymouth, Mass., Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report and License Transfer Application (EPID L-2018-LLL-0031). |
02/07/2019 |
208. |
2.206 Petition Regarding Pilgrim Nuclear Power Station's Current Licensing Basis for Flooding - 60-Day Status Report (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002). |
02/08/2019 |
209. |
Pilgrim, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications. |
02/08/2019 |