United States Nuclear Regulatory Commission - Protecting People and the Environment

Communications Regarding Increased Oversight at Pilgrim Nuclear Power Plant

On this page:

Assessment

No. Title Date Issued
1. 2014 Annual Assessment Letter (Degraded Cornerstone) 03/04/2015
2. Mid-Cycle Assessment Letter For Pilgrim Nuclear Power Station (Report 05000293/2015005) 09/01/2015
3. Pilgrim Nuclear Power Station - NRC Integrated Inspection Report 3rd Quarter 05000293/2015003 (see Sect 4OA5 for quarterly assessment) 11/12/2015
4. 2015 Annual Assessment Letter (Repetitive Degraded Cornerstone) 03/02/2016
5. Pilgrim Nuclear Power Station - NRC Integrated Inspection Report 1st Quarter 05000293/2016001 (see Sect 4OA5 for quarterly assessment) 05/12/2016
6. Mid-Cycle Assessment Letter For Pilgrim Nuclear Power Station (Report 05000293/2016005) 08/31/2016
7. Pilgrim Nuclear Power Station – NRC Integrated Inspection Report 3rd Quarter 05000293/2016003 (see Sect 4OA5 for quarterly assessment) 11/14/2016
8. Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016006) 03/01/2017
9. Pilgrim Nuclear Power Station – Integrated Inspection Report 05000293/2017001 (see Sect 4OA5 for quarterly assessment) 05/15/2017
10. Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005) 08/28/2017

To top of page

Inspection

No. Title Date Issued
1. Pilgrim Nuclear Power Station – NRC 95002 Supplemental Inspection Report 05000293/2014008 And Assignment Of Two Parallel White Performance Indicator Inspection Findings 01/26/2015
2. Pilgrim Nuclear Power Station – NRC Integrated Inspection Report 1st Quarter 05000293/2015001 (1 NCV) 05/11/2015
3. Pilgrim Nuclear Power Station – NRC Special Inspection Report 05000293/2015007; And Preliminary White Finding 05/27/2015
4. Pilgrim Nuclear Power Station – NRC 95002 Supplemental Follow-Up Inspection Report 05000293/2015009 06/18/2015
5. Pilgrim Nuclear Power Station – NRC Integrated Inspection Report 2nd Quarter 05000293/2015002 (4 NCV, 1 FIN) 08/11/2015
6. Final Significance Determination For A White Finding And Notice Of Violation - Inspection Report No. 05000293/2015011 – Pilgrim Nuclear Power Station 09/01/2015
7. Biennial PI&R Inspection w/ CAP Marginally Effective (2 NOV, 2 NCV) 10/01/2015
8. Pilgrim Nuclear Power Station – NRC Integrated Inspection Report 3rd Quarter 05000293/2015003 (4 NCV, 1 SLIV) 11/12/2015
9. Security Baseline – Access, Equipment and Training (5 NCV) 12/01/2015
10. Triennial Fire Protection Inspection (1 NCV) 12/21/2015
11. Pilgrim Nuclear Power Station, NRC Inspection Report No. 05000293/2016010 And NRC Office Of Investigations Report NO. 1-2015-005 02/10/2016
12. Pilgrim Nuclear Power Station – NRC Integrated Inspection Report 4th Quarter 05000293/2015004 (4 NCV) 02/11/2016
13. Pilgrim Nuclear Power Station – IP 95003 Supplemental Inspection Report (Phase A) 05000293/2016008 (1 NCV) 02/29/2016
14. Pilgrim Nuclear Power Station – NRC Integrated Inspection Report 1st Quarter 05000293/2016001 05/12/2016
15. Pilgrim Nuclear Power Station – IP 95003 Supplemental Inspection Report (Phase B) 05000293/2016008 (1 NCV) 05/23/2016
16. Pilgrim Nuclear Power Station – NRC Permanent Plant Modifications Inspection Report 05000293/2016007 07/06/2016
17. Pilgrim Nuclear Power Station – Temporary Instruction 2515/191 Inspection Report 05000293/2016013 07/07/2016
18. Pilgrim Nuclear Power Station – NRC Integrated Inspection Report 2nd Quarter 05000293/2016002 (1 NCV) 08/10/2016
19. Pilgrim Nuclear Power Station – NRC Integrated Inspection Report 3rd Quarter 05000293/2016003 (4 NCV) 11/14/2016
20. Pilgrim Nuclear Power Station – Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2016502 12/20/2016
21. Pilgrim Nuclear Power Station – Integrated Inspection Report 05000293/2016004 and Independent Spent Fuel Storage Installation Report 07201044/2016001 02/14/2017
22. Pilgrim Nuclear Power Station – Problem Identification and Resolution Sample Inspection Report 05000293/2016404 (3 NCV) 04/07/2016
23. Pilgrim Nuclear Power Station – Supplemental Inspection Report (Inspection Procedure 95003 Phase 'C') 05000293/2016011 and Preliminary Greater-than-Green Finding (7 NCV, 2 FIN, 1 SLIV) 05/10/2017
24. Pilgrim Nuclear Power Station – Integrated Inspection Report 05000293/2017001 (2 NCV, 1 SLIV) 05/15/2017
25. Pilgrim Nuclear Power Station – Initial Operator Licensing Examination Report 05000293/2017301 05/15/2017
26. Pilgrim Nuclear Power Station – Integrated Inspection Report 05000293/2017002 08/14/2017
27. Pilgrim Nuclear Power Station – Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only) 09/05/2017

To top of page

Other

No. Title Date Issued
1. Inspection Approach/Phase Schedule Communication Letter 12/18/2015
2. OEDO-15-00479: David Lochbaum and Others 2.206 Petition Regarding Pilgrim's Current License Basis for Flooding Acknowledgement Letter (CAC No. MF6460) 02/11/2016
3. Pilgrim Nuclear Power Station -- Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 03/03/2016
4. NRC Notice of Violation (NRC Investigation Report No. 1-2015-005) (Fire watch NOV) 04/11/2016
5. NRC Annual Assessment Meeting Summary 04/13/2016
6. NRC Annual Assessment Meeting Presentation 04/13/2016
7. Entergy Annual Assessment Meeting Presentation 04/13/2016
8. 2016 AARM Meeting Agenda 06/02/2016
9. 2016 AARM Slides 06/02/2016
10. 2016 AARM Transcript 06/02/2016
11. 2016 AARM Meeting SRM 06/02/2016
12. LER 2016-001-00 06/09/2016
13. LTR-15-0319-1, LTR-15-0375-1 – Response Letter 2.206 Petition Re: Pilgrim Severe Weather Emergency Preparedness 06/22/2016
14. LER 2016-002-00 06/30/2016
15. Pilgrim Extension Request for Order EA-13-109 Schedule Requirements 07/13/2016
16. LER 2016-003-00 07/25/2016
17. LER 2016-004-00 07/25/2016
18. Interim Staff Response to Reevaluated Flood Hazards Submitted in Pilgrim Response to the 10CFR50.54(f) Information Request 08/03/2016
19. PNPS Letter – Request for Deferral of Beyond-DBE Flooding Actions 08/18/2016
20. PNPS Letter – Request for Deferral Beyond-DBE Seismic Actions 08/18/2016
21. LER 2016-002-001 Supplement 08/18/2016
22. Entergy Announces Pilgrim Readiness for Phase C Inspection 08/31/2016
23. PNP Ltr 2.16.057 – LER 2016-004 Retraction 09/09/2016
24. Formal Notification of Phase C IP 95003 Inspection dates 10/13/2016
25. LER 2016-005-00 11/04/2016
26. LER 2016-006-00 11/04/2016
27. Pilgrim Response to NRC Generic Letter 2016-01 , "Monitoring of Neutron-Absorbing Material in Spent Fuel Pools" 11/03/2016
28. Licensee Event Report 2016-007-00 – Pilgrim Nuclear Power Station Regarding Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction 11/04/2016
29. NRC Response to Town of Plymouth regarding Pilgrim 12/13/2016
30. JRWA Letter Expressing Concerns About Flooding Risks at Pilgrim Nuclear Power Station 12/26/2016
31. Letter from Massachusetts Attorney General Requesting NRC meet with public to discuss inadvertently released email 01/04/2017
32. Licensee Event Report 2016-009-00 – HPCI Declared Inoperable Due to Failure of IST Surveillance Test 01/05/2017
33. Letter from Chairman responding to Massachusetts Attorney General Request for NRC to meet with public to discuss inadvertently released email 01/11/2017
34. Letter to Mary Lampert, Director, Pilgrim Watch, from Stephen Koenick, LPL1, DORL/NRR Re: Pilgrim Nuclear Power Station - Liability and Holtec Guarantees 01/17/2017
35. Notice of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim Nuclear Power Station 01/19/2017
36. Pilgrim Watch response to Stephen Koenick January 7 reply to our October 27, 2016 email regarding liability and Holtec guarantees at Pilgrim Nuclear Power Station 01/24/2017
37. Press Release-I-17-002: NRC Plans Plymouth Public Meeting to Discuss Reviews at Pilgrim Nuclear Power Plant 01/30/2017
38. Pilgrim Nuclear Power Station – Petition Received at Pilgrim 95003 Public Meeting from Pilgrim Legislative Advisory Coalition 01/31/1017
39. LTR-16-0609 NRC Response to Senator Viriato M. deMacedo, et al, Plymouth and Barnstable District, Massachusetts Senate, letter regarding concern about the current state of Pilgrim Nuclear Power Station 02/01/2017
40. Pilgrim Nuclear Power Station – Request for Approval of Certified Fuel Handler Training and Retraining Program 02/02/2017
41. Pilgrim Nuclear Power Station – Request for Exemption from Specific Provisions in 10 CFR 73.55 02/07/2017
42. Pilgrim Nuclear Power Station – ISFSI Radioactive Effluent Release Report for 2016 02/10/2017
43. LER 16-010-00 for Pilgrim Nuclear Power Station Regarding MSIV Inoperability Led to a Condition Prohibited by the Plant's Technical Specifications 02/13/2017
44. Status of Decision on Petitioners Request for Hearing Regarding Entergy's Request for Extension to Comply with NRC Order EA-13-109 02/17/2017
45. Region I/DRP Response to James R. Garb, Pilgrim Legislative Advisory Coalition re: Degraded Safety Status of the Pilgrim Nuclear Power Station 02/21/2017
46. NRC Response to Jones River Watershed Association Letter Dated December 26, 2016 to the NRC on Pilgrim Nuclear Power Station 02/27/2017
47. 01/31/2017 – Summary of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim 02/28/2017
48. NRC Response to Petition Received at Pilgrim 95003 Public Meeting from Pilgrim Legislative Advisory Coalition 03/06/2017
49. Pilgrim Nuclear Power Station – Notice of Public Meeting (Annual Assessment and 95003 Inspection Exit Meeting) - 3/21/2017 03/10/2017
50. Press Release-I-17-005: NRC to Hold Pilgrim Nuclear Plant Public Exit Meeting for Inspection, Annual Assessment Discussion 03/14/2017
51. LER 17-001-00 for Pilgrim Regarding Reactor Building Isolation Dampers Failed to Isolate 03/15/2017
52. Pilgrim Nuclear Power Station - Supplement to Requests for Relief from ASME Section XI Volumetric Examination Requirements - Fourth 10-Year Interval 03/16/2017
53. 3/21/2017 – Annual Assessment/95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station - Speaker Sign-Up Sheets 03/21/2017
54. Statement from the Office of U.S. Senator Elizabeth Warren – NRC Annual Meeting, Plymouth, MA 03/21/2017
55. Statement of Congressman Keating – NRC Annual Assessment Meeting for PNPS - March 21, 2017. 03/21/2017
56. Statement of Senator Edward J. Markey – NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - March 21, 2017 03/21/2017
57. 3/21/2017 – Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station – Entergy Presentation Slides 03/21/2017
58. 3/21/2017 – Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station – NRC Presentation Slides 03/21/2017
59. 03/21/2017 Transcript of Annual Assessment/95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station 03/21/2017
60. 3/21/2017 – Annual Assessment/95003 Inspection Exit Summary Meeting for Pilgrim Nuclear Power Station 03/21/2017
61. Pilgrim, License Amendment Request - Cyber Security Plan Implementation Schedule 03/30/2017
62. Nuclear Property Damage Insurance [10 CFR 50.54(w)(3)] 03/30/2017
63. Entergy Nuclear Operations, Inc. – Decommissioning Funding Status Report per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v). 03/31/2017
64. Pilgrim Nuclear Power Station - Issuance of Relief Request Nos. PNPS-ISI-004 and PNPS-ISI-005 for Relief from American Society of Mechanical Engineers Code, Section XI, Volumetric Examination Requirements. 04/03/2017
65. Commission Memorandum and Order regarding PW request for Hearing related to Fukushima Orders (CLI-17-06). 04/06/2017
66. Notification for Information Only – Pilgrim Deviation from EPRI Report 3002000091, Rev. 1 04/10/2017
67. OEDO-15-00479 – 2.206 Petition regarding Pilgrim current licensing basis for flooding – 60 DAY STATUS (CAC NO. MF6460) 04/10/2017
68. Pilgrim Nuclear Power Station – Approval of Certified Fuel Handler Training and Retraining Program (CAC No. MF9275) 04/12/2017
69. Pilgrim Nuclear Power Station – NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding External Events. 04/17/2017
70. Pilgrim Nuclear Power Station – Relaxation of the Schedule Requirements for Order EA-13-109: Order Modifying Licenses With Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions. 04/17/2017
71. 3/21/2017 – Annual Assessment/95003 Inspection Exit Summary Meeting for Pilgrim Nuclear Power Station. 04/18/2017
72. Pilgrim Nuclear Power Station – Relief Requests PNPS-ISI-001 and PNPS-ISI-002, Relief from ASME Code Volumetric Examination Requirements for the Fourth 10-Year Inservice Inspection Interval (CAC Nos. MF8092 and MF8093) 05/12/2017
73. Pilgrim Nuclear Power Station – Letter, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler (CAC No. MF9274) 05/16/2017
74. Pilgrim – Fuel Cycle 22, Core Operating Limits Report, Revision 37 05/12/2017
75. Pilgrim – Annual Radiological Environmental Operating Report for January 1 through December 31, 2016 05/12/2017
76. Pilgrim – Annual Radioactive Effluent Release Report for January 1 through December 31, 2016 05/12/2017
77. OEDO-15-00479: Federal Register Notice re: 2.206 Petition Regarding Pilgrim's Current License Basis for Flooding (CAC No. MF6460) 02/11/2016
78. Supplemental to Technical Specifications Proposed Change – Administrative Controls for Permanently Defueled Condition 05/25/2017
79. LER 17-002-00 for Pilgrim Regarding Isolation of HPCI 05/25/2017
80. LER 17-003-00 for Pilgrim Nuclear Power Station Regarding Pressure Suppression Pool Declared Inoperable Due to High Water Level 05/25/2017
81. LER 17-004-00 for Pilgrim Nuclear Power Station Regarding Secondary Containment Testing Led to Loss of Safety Function to Both Trains of Standby Gas Treatment System 06/02/2017
82. LER 17-005-00 for Pilgrim Regarding 10 CFR 50, Appendix J, Option B, Leak Rate Criteria Exceeded 06/07/2017
83. LER 17-006-00 for Pilgrim Nuclear Power Station Regarding Source Range Monitor Inoperable During Fuel Movement 06/13/2017
84. LER 16-010-01 for Pilgrim Nuclear Power Station re MSIV Inoperability 06/14/2017
85. LER 17-007-00 for Pilgrim Regarding Potential Inoperability of Safety Relief Valve 3A 06/22/2017
86. Pilgrim – NRC Investigation Report 1-2016-011 06/28/2017
87. Pilgrim Nuclear Power Station's Sixth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109) 06/30/2017
88. Pilgrim Nuclear Power Station – Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304) 07/10/2017
89. Pilgrim Nuclear Power Station: Regulatory Conference Presentation 07-13-17 07/13/2017
90. Press Release-I-17-026: NRC to Hold Regulatory Conference with Entergy Regarding Apparent Violation at Pilgrim Nuclear Power Plant 07/12/2017
91. Pilgrim Nuclear Power Station Recovery Plan 07/28/2017
92. Confirmatory Action Letter – Pilgrim Nuclear Power Station 08/02/2017
93. Press Release-I-17-028: NRC Issues Confirmatory Action Letter to Pilgrim Nuclear Power Plant on Safety Performance Improvement Commitments 08/02/2017
94. LER 17-008-00 for Pilgrim re 480V Bus B6 Auto Transfer Function Degraded Due to Time Delay Relay Failure 06/30/2017
95. Pilgrim Nuclear Power Station – Final Significance Determination For A Green Finding And Results Of Regulatory Conference – Inspection Report 05000293/2017008 08/09/2017
96. LER 17-010-00 for Pilgrim re Air Accumulation Creates Small Void in Core Spray Discharge Piping 08/07/2017
97. LER 17-009-00 for Pilgrim Nuclear Power Station Regarding Potential Primary Containment System lnoperability Due to Relay Concerns 07/17/2017
98. LER 17-001-01 for Pilgrim Nuclear Power Station Regarding Reactor Building Isolation Dampers Failed to Isolate 07/17/2017
99. Requalification Program Inspection – Pilgrim Nuclear Power Station 08/22/2017
100. Pilgrim Nuclear Power Station, Transmittal of Reply to a Notice of Violation, EA-17-030 08/11/2017
101. LER 17-011-00 for Pilgrim Nuclear Power Station Regarding Simultaneously Opened Reactor Building Airlock Doors Caused Loss of Secondary Containment 08/15/2017

To top of page

Page Last Reviewed/Updated Wednesday, April 11, 2018