Technical Letter Reports – 2023
Document Number | Title | Publish Date |
---|---|---|
RES-DE-SGSEB-2023-02 | Induced Seismicity and its Impact on Existing Seismic Hazard Analysis | 09/30/2023 |
RES-DE-SGSEB-2023-01 | Ground Motion and Seismic Hazard in Central and Eastern United States | 09/14/2023 |
TLR ANL-22/20 | Predicting Rupture Pressure and Leak Rate of Alloy 600 Tubes with ODSCC and Comparing with Test Results | 05/31/2023 |
TLR ANL-22/21 | Technical Letter Report Predicting Rupture Pressure and Leak Rate of Alloy 600 U-bend Tubes with PWSCC and Comparing with Test Results | 04/28//2023 |
RES-DE-REB-2023-1 | Use of High Entropy Alloys (HEA) for Future Nuclear Applications | 02/01/2023 |
RES-DE-2023-006 | Criteria for Determining the Safety of Wireless Technologies at Nuclear Power Plants | 03/31/2023 |
RES-DE-REB-2023-1 | Use of High Entropy Alloys (HEA) for Future Nuclear Applications | 02/01/2023 |
RES-DE-REB-2023-2 | State-of-Technology and Technical Challenges in Advanced Sensors, Instrumentation, and Communication to Support Digital Twin for Nuclear Energy Application | 02/28/2023 |
RES-DE-REB-2023-3 | Literature Review & Identification of System Performance Failure Modes Pertinent to CISCC Evolution and Risk Sequence | 02/22/2023 |
RES-DE-REB-2023-4 | Evaluating Static Isothermal Molten Salt Compatibility with Structural Alloys | 05/15/2023 |
RES-DE-REB-2023-5 | Assessment of the Current State of Knowledge on Storage and Transportation of Molten Salt Reactor Waste | 09/07/2023 |
RES-DE-REB-2023-6 | Assessment of the Performance of the Extremely Low Probability of Rupture Code in an International Benchmark with Insights from Advanced Finite Element Analysis | 08/22/2023 |
RES-DE-REB-2023-7 | Reliability and Integrity Management Scoping Study | 10/25/2023 |
RES-DE-REB-2023-8 | Digital Twin for Nuclear Safeguards and Security: Assessment of Challenges, Opportunities, and Current State-of-Practice | 09/30/2023 |
RES-DE-REB-2023-9 | Preliminary Assessment of Physical Protection Modeling and Simulation Tools | 12/27/2023 |
RES-DE-REB-2023-10 | Engineering Scale Pyroprocessing Activities in the United States | 01/03/2024 |
RES-DE-REB-2023-11 | FAVOR v20.1 Testing and Verification and Validation Report | 12/21/2023 |
RES-DE-ICEEB-2023-006 | Criteria for Determining the Safety of Wireless Technologies at Nuclear Power Plants | 03/21/2023 |
RES-DE-ICEEB-2023-007 | Determining the Safety of Wireless Technologies at Nuclear Power Plants | 09/30/2023 |
Page Last Reviewed/Updated Friday, November 01, 2024
Page Last Reviewed/Updated Friday, November 01, 2024