The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Publications Available in the Agencywide Documents Access and Management System (ADAMS) – 2024
| Documents added in 2024 | |||
|---|---|---|---|
| V = Volume | N = Number | R = Revision | P = Part | S = Supplement | Ch = Chapter | Add = Addendum | Sec = Section | DFC = Draft For Comment | |||
| PUBLICATION NUMBER |
TITLE | DATE OF PUBLICATION |
ADAMS ACCESSION NUMBER |
| NUREG/CR-6393 | Integrated System Validation: Methodology and Review Criteria | January 1997 | ML20134E396 |
| NUREG-1437, S15, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Virgil C. Summer Nuclear Station - Draft Report for Comment | November 2024 | ML24330A271 |
| NUREG-2255 | Guidance for Conducting Expert Elicitation in Risk-Informed Decisionmaking Activities | November 2024 | ML24325A566 |
| NUREG-1437, S26, Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Monticello Nuclear Generating Plant, Unit 1 – Final Report | November 2024 | ML24309A221 |
| NUREG-2220, V8 | Fiscal Year 2024 – Agency Financial Report | November 2024 | ML24319A274 |
| NUREG/IA-0550 | Modelling Guidelines for CCFL Representation During IBLOCA Scenarios of PWR Reactors | October 2024 | ML24297A297 |
| NUREG-0713, V44 | Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2022: Fifty-Fifth Annual Report | October 2024 | ML24303A136 |
| NUREG-1437 S62 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Diablo Canyon Nuclear Power Plant, Units 1 and 2, Draft Report for Comment | October 2024 | ML24299A167 |
| NUREG/BR-0254, R13 | Payment Methods | October 2024 | ML24297A632 |
| NUREG-2249, DFC | Generic Environmental Impact Statement for Licensing of New Nuclear Reactors – Draft Report for Comment | September 2024 | ML24176A220 |
| NUREG-1885, R17 | Report to Congress on the Security Inspection Program for Operating Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update - Annual Report for Calendar Year 2023 | September 2024 | ML24254A418 |
| NUREG-1022, R3, S2 | Event Report Guidelines 10 CFR 50.72(b)(3)(ii) and 10 CFR 50.73(a)(2)(ii) – Final Report | September 2024 | ML24191A376 |
| NUREG-1437, S61, DFC | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Perry Nuclear Power Plant, Draft Report for Comment | August 2024 | ML24241A256 |
| NUREG/BR-0096, R2 | Instructions and Guidance for Completing Physical Inventory Summary Reports (NRC Form 327) - Final Report | October 2023 | ML23303A221 |
| NUREG-1601 | Chemical Process Safety at Fuel Cycle Facilities | August 1997 | ML20210J626 |
| NUREG/IA-0546 | Assessment of a PWR Control Rod Drop Transient with 3D Neutronic-Thermalhydraulic Coupled Codes RELAP5/ PARCSv2.7 and TRACEv5.0P3/PARCSv3.0 | August 2024 | ML24219A108 |
| NUREG/BR-0175, R3 | A Short History of Nuclear Regulation, 1946–2024 | July 2024 | ML24211A051 |
| NUREG-1555, S1, R2 | Standard Review Plans for Environmental Reviews for Nuclear Power Plants - Supplement 1: Operating License Renewal — Final Report | August 2024 | ML23201A227 |
| NUREG-1437, V3, R2 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Appendices B – J — Final Report | August 2024 | ML24086A528 |
| NUREG-1437, V2, R2 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Appendix A — Final Report | August 2024 | ML24086A527 |
| NUREG-1437, V1, R2 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Main Report — Final Report | August 2024 | ML24086A526 |
| NUREG-2266 | Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels – Final Report | July 2024 | ML24207A210 |
| NUREG-2267 | NRCDose3 Code, Version 1.1.4: User Guide and Technical Manual | July 2024 | ML24207A225 |
| NUREG-1437, S7a, Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plant: Regarding Subsequent License Renewal for North Anna Power Station Units 1 and 2 – Final Report | July 2024 | ML24204A104 |
| NUREG/IA-0549 | Maanshan PWR FLEX Program Enhance with RELAP5/MOD 3.3 | July 2024 | ML24198A227 |
| NUREG/BR-0531 | U.S. Nuclear Regulatory Commission Safeguards Information Program: Helpful Resources for Applicants and Preapplicants | June 2024 | ML24176A197 |
| NUREG/KM-0019 | Technical and Regulatory Bases for Regulatory Guide 1.236, PWR Control Rod Ejection and BWR Control Rod Drop Accidents | June 2024 | ML24176A124 |
| NUREG/CR-7267 | Default Parameter Values and Distribution in RESRAD-ONSITE V7.2, RESRAD-BUILD V3.5, and RESRAD-OFFSITE V4.0 Computer Codes | June 2024 | ML24173A152 |
| NUREG/BR-0254, R12 | Payment Methods | June 2024 |
ML24166A288 |
| NUREG/CR-7307 | Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized- and Boiling-Water Reactors | May 2024 | ML24155A058 |
| NUREG-2180, S1 | Determining the Effectiveness, Limitations, and Operator Response for Very Early Warning Fire Detection Systems in Nuclear Facilities – Update to Event Tree Parameters (Alpha and Pi) and Integration of NUREG-2230 Methods – Final Report | May 2024 | ML24143A010 |
| NUREG-1556, V2, R1, S1 | Program-Specific Guidance About Industrial Radiography Licenses | May 2024 | ML24134A269 |
| NUREG/CR-2907, V27 | Radioactive Effluents from Nuclear Power Plants: Annual Report 2021 | May 2024 | ML24134A119 |
| NUREG/IA-0539 | New Functionality of TRACE: The 3D Post-Processing for the VESSEL Component in SALOME Platform | May 2024 | ML24122A809 |
| NUREG/CR-7306 | Fuel Assembly and Irradiation Parametric Study for Extended-Enrichment and High-Burnup Light-Water Reactor Spent Nuclear Fuel in Dry Storage Casks and Transportation Packages | April 2024 | ML24114A120 |
| NUREG-0090, V46 | Report to Congress on Abnormal Occurrences, Fiscal Year 2023 | April 2024 | ML24121A231 |
| NUREG-1437 S26 Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Monticello Nuclear Generating Plant, Unit 1 – Draft Report for Comment | April 2024 | ML24102A276 |
| NUREG-1437, S60 | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Comanche Peak Nuclear Power Plant, Final Report | April 2024 | ML24078A261 |
| NUREG-1022, R3, S2, DFC | Event Report Guidelines 10 CFR 50.72(b)(3)(ii) and 10 CFR 50.73(a)(2)(ii) – Draft Report for Comment | April 2024 | ML24102A280 |
| NUREG/IA-0547 | Uncertainty and Sensitivity Analysis of Hot Leg LOCA in Two-Loop PWR Using RELAP5 Version 3.3lj | April 2024 | ML24103A191 |
| NUREG/IA-0548 | Assessment of TRACE V5.0 Patch 7 Using OECD-ATLAS2 B3.2 Test | April 2024 | ML24101A103 |
| NUREG-1437, S6, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Surry Power Station Units 1 and 2 – Final Report | April 2020 | ML20071D538 |
| NUREG-1437, S5a, Second Renewal | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report | March 2024 | ML24087A061 |
| NUREG/IA-0544 | RELAP5, TRACE and APROS Model Benchmark for the IAEA SPE-2 Experiment | March 2024 | ML24082A018 |
| NUREG-1437, S60, DFC | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Comanche Peak Nuclear Power Plant, Draft Report for Comment | October 2023 | ML23299A252 |
| NUREG/IA-0545 | Post-Test Analysis of PKL III Test H2.2 Run 2 (SBO) with TRACE | March 2024 | ML24075A100 |
| NUREG-1437, S10, Second Renewal | Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3, Final Report | January 2020 | ML20023A937 |
| NUREG/CR-3331 | A Methodology for Allocating Nuclear Power Plant Control Nuclear to Human or Automatic Control | August 1983 | ML20024E954 |
| NUREG-1100, V40 | U.S. NRC Congressional Budget Justification Fiscal Year 2025 | March 2024 | ML24061A093 |
| NUREG-0713, V43 | Occupation Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2021: Fifty-Fourth Annual Report | February 2024 | ML24060A017 |
| NUREG-1650, R8, S1 | Answers to Questions From the Peer Review By Contracting Parties on the United States of America Ninth National Report For the Convention on Nuclear Safety | February 2024 | ML24058A267 |
| NUREG-1650, R7, S1 | Updated Recommendations Related to Spent Fuel Transport and Dry Storage Shielding Analyses |
February 2024 | ML24058A128 |
| NUREG/BR-0297, R1 | NRC Public Meetings | February 2024 | ML24059A221 |
| NUREG-2250, V3 | Annual Evaluation Plan: Fiscal Year 2025 | February 2024 | ML24059A451 |
| NUREG-1830, V20 | Office of Investigations Annual Report Fiscal Year 2023 | February 2024 | ML24052A308 |
| NUREG-0410 | NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants | January 1978 | ML20062G769 |
| NUREG-1437, S2, Second Renewal, DFC | Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Oconee Nuclear Station Units 1, 2, and 3 - Draft Report for Comment | February 2024 | ML24033A298 |
| NUREG/CR-7302, R1 | Updated Recommendations Related to Spent Fuel Transport and Dry Storage Shielding Analyses | February 2024 | ML24031A600 |
| NUREG/BR-0280, R2 | Regulating Nuclear Fuel | January 2024 | ML24031A358 |
| NUREG-2191, V2, R1 | Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | January 2024 | ML24026A234 |
| NUREG-2194, V1, R1 | Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 1: Specifications | January 2024 | ML24026A214 |
| NUREG-1456 | An Alternative Format for Category I Fuel Cycle Facility Physical Protection Plans | June 1992 | ML20101K045 |
| NUREG-1322 | Acceptance Criteria for the Evaluation of Category I Fuel Cycle Facility Physical Security Plans | October 1991 | ML20085G840 |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026