Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Regulatory Issue Summaries - 2001

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
RIS-01-25 NEI 99-02, Revision 2, Voluntary Submission of Performance Indicator Data -- 12/07/2001 --
RIS-01-24 Status of Receipt of NRC Mail Following the Closing of the Brentwood Postal Facility -- 12/06/2001 --
RIS-01-23 Resetting Fault Exposure Hours for Safety System Unavailability Performance Indicators -- 12/03/2001 --
RIS-01-22 Attributes of a Proposed No Significant Hazards Consideration Determination -- 11/20/2001 --
RIS-01-21 Licensing Action Estimates for Operating Reactors W 81 FR 73448
10/25/2016
--
-- 11/16/2001 --
RIS-01-20 Revisions to Staff Guidance for Implementing NRC Policy on Notices of Enforcement Discretion -- 11/14/2001 --
RIS-01-19 Deficiencies in the Documentation of Design Basis Radiological Analyses Submitted in Conjunction with License Amendment Requests -- 10/18/2001 --
RIS-01-18 Requirements for Oath or Affirmation -- 08/22/2001 --
RIS-01-17 Preparation and Scheduling of Operator Licensing Examinations W 81 FR 31969
05/20/2016
--
-- 08/22/2001 --
RIS-01-16 Update of Evacuation Time Estimates -- 08/01/2001 --
RIS-01-15 Performance of DC-Powered Motor-Operated Valve Actuators -- 08/01/2001 --
RIS-01-14 Position on Reportability Requirements for Reactor Core Isolation Cooling System Failure -- 07/19/2001 --
RIS-01-13 10 CFR Part 40 Exemptions For Uranium Contained in Aircraft Counterweights -- 07/20/2001 --
RIS-01-12 Nonconservatism in Pressurized Water Reactor Spent Fuel Storage Pool Reactivity Equivalencing Calculations -- 05/18/2001 --
RIS-01-11 Voluntary Submission of Performance Indicator Data -- 05/11/2001 --
RIS-01-10 Revisions to Staff Guidance on Notices of Enforcement Discretion -- 04/02/2001 --
RIS-01-09 Control of Hazard Barriers -- 04/02/2001 --
RIS-01-08 Operating Reactor Licensing Action Estimates W 81 FR 73448
10/25/2016
--
-- 04/02/2001 --
RIS-01-07 10 CFR 50.75 Reporting and Recordkeeping for Decommissioning Planning 1 01/08/2009 --
-- 02/23/2001 --
RIS-01-06 Criteria for Triggering a Review under 10 CFR 50.80 for Non-owner Operator Service Companies -- 02/15/2001 --
RIS-01-05 Guidance on Submitting Documents to the NRC by Electronic Information Exchange or on CD-ROM -- 01/25/2001 --
RIS-01-04 Issuance of Updated Guidance on The Transfer of Ownership or Control of Licensed Activities (NUREG-1556, Volume 15) -- 01/24/2001 --
RIS-01-03 Changes, Tests, and Experiments -- 01/23/2001 --
RIS-01-02 Guidance on Risk-Informed Decisionmaking in License Amendment Reviews -- 01/18/2001 --
RIS-01-01 Eligibility of Operator License Applicants -- 01/18/2001 --

To top of page

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021