Preliminary Notification (PN) Reports for 2018

| April | May | October | November |

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

November
PNO-III-19-002 11/14/2018 Palisades Nuclear Plant, Through-Wall Leak Identified on A Reactor Vessel Head Nozzle

October
PNO-III-19-001 10/18/2018 Palisades Nuclear Plant, Maintenance Outage to Repair Control Rod Drive and Failed Transformer

May
PNO-III-18-003A 05/08/2018 UPDATE: Fermi Power Plant, Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer #64 and Subsequent Reactor Scram

April
PNO-III-18-003 04/17/2018 Fermi Power Plant, Unplanned Shutdown Greater Than 72 Hours Following A Loss Of Station System Transformer #64 And Subsequent Reactor Scram
PNO-III-18-002 04/04/2018 Beaver Valley, Davis-Besse, Perry Notification of Bankruptcy Filing By FirstEnergy Solutions