The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Preliminary Notification (PN) Reports for 2009

| January | February | March | Apil | May | June | July | August | September | October | November | December |

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

December
PNO-III-09-015 12/23/2009 Indiana Michigan Power Company: D.C. Cook Unit 1 - 100 Percent Power
PNO-I-09-007 12/21/2009 Dominion Nuclear Connecticut: Millstone Unit 3 Reactor Trip and Shutdown Greater Than 72 Hours
PNO-III-09-014 12/18/2009 Indiana Michigan Power Company: D.C. Cook Unit 1 Restart

To top of page

November
PNO-I-09-006 11/24/2009 Exelon Generation Company, LLC: Three Mile Island Unit 1 - Contamination Event (Update)
PNO-II-09-006 11/24/2009 South Carolina Electric & Gas Company: Fire Within the Protected Area of V. C. Summer Nuclear Station
PNO-III-09-013 11/23/2009 Donald C. Cook Nuclear Plant: D. C. Cook Unit 1 Mode Change Following 14 Months Forced Outage
PNO-III-09-009A 11/12/2009 Detroit Edison Company: Fermi 2 Unplanned Shutdown for Greater Than 72 Hours to Repair Hydrogen In-Leakage - Update
PNO-III-09-012A 11/03/2009 FirstEnergy Nuclear Operating Co.: Manual Reactor Scram During Planned Shutdown (Update)

To top of page

October
PNO-III-09-011A 10/26/2009 Exelon Generation Company: Clinton Power Station Unplanned Shutdown Greater than 72 Hours - Update
PNO-III-09-012 10/19/2009 FirstEnergy Nuclear Operating Co.: Manual Reactor Scram During Planned Shutdown
PNO-III-09-011 10/16/2009 Exelon Generation Company: Clinton Power Station Unplanned Shutdown Greater Than 72 Hours
PNO-IV-09-005 10/14/2009 Basin Electric Power Cooperative: Potential Overexposures to Members of the Public
PNO-III-09-010 10/15/2009 Exelon Generation Co.: Lasalle Unit 2 Unplanned Shutdown Greater than 72 hours
PNO-III-09-009 10/01/2009 Detroit Edison Company: Fermi 2 Unplanned Shutdown for Greater Than 72 Hours to Repair Hydrogen In-Leakage

To top of page

September
There were no Preliminary Notifications Reports for September in 2009.

To top of page

August
PNO-IV-09-004A 08/31/2009 Energy Northwest: Columbia Generating Station Startup Following an Automatic Reactor Scram Due to a Turbine Trip and Declaration of an Unusual Event Due to Possible Toxic Gas (Update)
PNO-III-09-008A 08/20/2009 Exelon Generation Co.: Lasalle Unit 2 Unplanned Shutdown Greater than 72 hours (Update)
PNO-III-09-008 08/18/2009 Exelon Generation Co.: Lasalle Unit 2 Unplanned Shutdown Greater than 72 hours
PNO-III-09-006A 08/10/2009 Donald C. Cook Nuclear Plant: D.C. Cook Unit 2 Forced Shutdown for Greater than 72 hours to Repair Reactor Coolant Pump Seal (Update)
PNO-IV-09-004 08/05/2009 Energy Northwest: Columbia Generating Station Unusual Event and Automatic Reactor Scram Due to Fire Resulting in Possible Toxic Gas
PNO-III-09-007A 08/05/2009 Braidwood Nuclear Station: Unusual Event at Braidwood Unit 2 Due to Loss of Offsite Power; Unit will Remain Shut Down for More Than 72 Hours (Update)
PNO-II-09-004 08/03/2009 Honeywell International, Inc.: Vehicle Accident Involving Uranium Hexafluoride Shipment

To top of page

July
PNO-III-09-007 07/31/2009 Braidwood Nuclear Station: Unusual Event at Braidwood Unit 2 Due to Loss of Offsite Power; Unit will Remain Shut Down for More Than 72 Hours
PNO-III-09-006 07/28/2009 Donald C. Cook Nuclear Plant: D.C. Cook Unit 2 Forced Shutdown for Greater Than 72 Hours to Repair Reactor Coolant Pump Seal
PNO-I-09-004A 07/27/2009 Dominion Nuclear Connecticut: Updated - Millstone Unit 2 Reactor Trip and Shutdown Greater Than 72 Hours
PNO-I-09-005A 07/17/2009 Exelon Generation Company, LLC: Updated - Oyster Creek Reactor Trip and Unusual Event Due to a Loss of Offsite Power and Shutdown Greater than 72 Hours
PNO-II-09-003 07/17/2009 USEC - Portsmouth Gaseous Diffusion Plant: Alert Declared Based on Fire Lasting Longer than 15 Minutes
PNO-II-09-002 07/16/2009 B&W Nuclear Operations Group: Alert Declared Based on Loss of Controlled Parameters for Criticality Safety
PNO-I-09-005 07/15/2009 Exelon Generation Company, LLC: Oyster Creek Reactor Trip and Unusual Event Due to a Loss of Offsite Power and Shutdown Greater than 72 Hours
PNO-I-09-004 07/03/2009 Dominion Nuclear Connecticut: Millstone Unit 2 Reactor Trip and Shutdown Greater Than 72 Hours

To top of page

June
PNO-III-09-005A 06/29/2009 FirstEnergy Nuclear Operating Company, Davis-Besse: Transitory Alert Due to Electric Device Failure (Update)
PNO-III-09-005 06/26/2009 FirstEnergy Nuclear Operating Company, Davis-Besse: Transitory Alert Due to Electric Device Failure
PNO-III-09-004 06/10/2009 Exelon Generation Company, Dresden 2 and 3: Tritium Leak
PNO-I-09-003A 06/08/2009 Entergy Nuclear Operations, Inc.: Indian Point Unit 3 Shutdown Due to Feedpump Issues (Update)
PNO-I-09-003 06/01/2009 Entergy Nuclear Operations, Inc.: Indian Point Unit 3 Shutdown Due to Feedpump Issues

To top of page

May
PNO-III-09-003A 05/22/2009 Prairie Island Unit 1: Unplanned Unit 1 Shutdown (Update)
PNO-III-09-003 05/20/2009 Prairie Island Unit 1: Prairie Island Unplanned Unit 1 Shutdown
PNO-I-09-002A 05/04/2009 Exelon Generating Company, LLC, Oyster Creek Nuclear Generating Station: Shutdown Greater Than 72 Hours:  Manual Reactor Scram Following Loss of Cooling Tower to Main Transformer - Update

To top of page

April
PNO-I-09-002 04/27/2009 Exelon Generating Company, LLC, Oyster Creek Nuclear Generating Station: Shutdown Greater than 72 Hours: Manual Reactor Scram Following Loss of Cooling to Main Transformer
PNO-III-09-002 04/20/2009 Kewaunee Power Station, Dominion Energy Kewaunee, Inc.: Unplanned Shutdown Due to Main Steam Pressure Instruments Not Calibrated as Required

To top of page

March
PNO-IV-09-003 03/12/2009 Southern California Edison Company, San Onfore Nuclear Generating Station: Contract Fire Watch Employee Terminated for use of a Prohibited Substance in the Site Protected Area
PNO-IV-09-002A 03/02/2009 AmerenUE, Inc., Callaway Plant: Plant Shutdown and Subsequent Declaration of Unusual Event Associated with Main Generator Hydrogen Leakage (Update)

To top of page

February
PNO-III-09-001A 02/23/2009 Palisades Nuclear Plant, Entergy Nuclear Operations, Inc.: Palisades Forced Shutdown for Greater than 72 Hours to Replace Leaking Control Rod Drive Seals (Update)
PNO-IV-09-002 02/19/2009 AmerenUE, Inc., Callaway Plant: Plant Shutdown and Subsequent Declaration of Unusual Event Associated with Main Generator Hydrogen Leakage
PNO-III-09-001 02/18/2009 Palisades Nuclear Plant, Entergy Nuclear Operations, Inc.: Palisades Forced Shutdown for Greater than 72 Hours to Replace Leaking Control Rod Drive Seals
PNO-IV-09-001A 02/10/2009 Entergy Operating, Inc., Arkansas Nuclear One - Unit 1: Unit 1 trip and Fire Associated With Main Generator (Update)
PNO-IV-09-001 02/09/2009 Entergy Operating, Inc., Arkansas Nuclear One - Unit 1: Unit 1 trip and Fire Associated With Main Generator
PNO-I-09-001A 02/05/2009 Unusual Event and Automatic Reactor Scram due to a Fire in the M1A Main Transformer (Update)
PNO-I-09-001 02/01/2009 Unusual Event and Automatic Reactor Scram due to a Fire in the M1A Main Transformer

To top of page

January
There were no Preliminary Notifications Reports for January in 2009.