Release Date |
SECY
Number |
Description |
SECY Paper |
SRM |
CVR |
Trans-
cript |
12/31/2012 |
SECY-12-0166 |
Proposed Rule: Revision to Transportation Safety Requirements and Harmonization with International Atomic Energy Agency Transportation Requirements (RIN 3150-AI11) |
 |
|
|
|
12/28/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress regarding uranium contamination in and around the Navajo Nation |
 |
|
|
|
12/28/2012 |
SECY-12-0170 |
Weekly Information Report - Week Ending December 14, 2012 |
 |
|
|
|
12/27/2012 |
|
01/08/2013 Meeting Slides: Briefing on Fort Calhoun |
|
|
|
 |
12/27/2012 |
|
01/08/2013 Meeting Agenda: Briefing on Fort Calhoun |
|
|
|
 |
12/26/2012 |
SECY-12-0165 |
The U.S. Nuclear Regulatory Commission Implementation Plan for the Radiation Source Protection and Security Task Force |
 |
|
|
|
12/21/2012 |
SECY-12-0169 |
Weekly Information Report - Week Ending December 7, 2012 |
 |
|
|
|
12/17/2012 |
SECY-12-0093 |
Closure Options for Generic Safety Issue - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance |
|
 |
 |
|
12/17/2012 |
SECY-12-0064 |
Recommendations for Policy and Technical Direction to Revise Radiation Protection Regulations and Guidance |
|
 |
 |
|
12/14/2012 |
SECY-12-0160 |
Proposed Rule: Petition for Rulemaking Process (Rin 3150-Ai30); Expanded Authority of Executive Director for Operations to Deny Petitions for Rulemaking Under Management Directive 6.3 |
 |
|
|
|
12/14/2012 |
|
Staff Requirements Memorandum: Meeting with the Advisory Committee on Reactor Safeguards |
|
 |
|
|
12/13/2012 |
|
12/06/2012 Commission Meeting: Meeting with the Advisory Committee on Reactor Safeguards (ACRS) |
|
|
|
 |
12/11/2012 |
SECY-12-0164 |
Weekly Information Report - Week Ending November 30, 2012 |
 |
|
|
|
12/11/2012 |
SECY-12-0163 |
Weekly Information Report - Week Ending November 23, 2012 |
 |
|
|
|
12/07/2012 |
|
Staff Requirements Memorandum: Conduct of Mandatory Hearings on Combined License Applications Pending Approval of an Updated Waste Confidence Rule |
|
 |
|
|
12/07/2012 |
SECY-12-0092 |
State-of-the-Art Reactor Consequence Analyses - Recommendation for Limited Additional Analysis |
|
 |
 |
|
12/07/2012 |
SECY-12-0157 |
Consideration of Additional Requirements for Containment Venting Systems for Boiling Water Reactors with Mark I and Mark II Containments (REDACTED VERSION) |
 |
|
|
|
12/07/2012 |
SECY-12-0063 |
Final Rule: Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (10 CFR Part 51; RIN 3150–AI42) |
|
|
 |
 |
12/06/2012 |
SECY-12-0063 |
Final Rule: Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (10 CFR Part 51; RIN 3150–AI42) |
|
 |
|
|
12/06/2012 |
|
Staff Requirements Memorandum: Briefing on Operator Licensing Program |
|
 |
|
|
12/06/2012 |
CLI-12-21 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
 |
|
|
|
12/04/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress providing NRC’s semiannual report on the status of licensing and other regulatory activities (April 2012-September 2012) |
 |
|
|
|
12/04/2012 |
|
11/27/2012 Commission Meeting: Briefing on Operator Licensing Program |
|
|
|
 |
11/29/2012 |
SECY-12-0158 |
Weekly Information Report - Week Ending November 16, 2012 |
 |
|
|
|
11/29/2012 |
SECY-12-0047 |
Revisions to the Nuclear Regulatory Commission Enforcement Policy |
|
|
 |
|
11/28/2012 |
SECY-12-0047 |
Staff Requirements Memorandum: Revisions to the Nuclear Regulatory Commission Enforcement Policy |
|
 |
|
|
11/28/2012 |
SECY-12-0153 |
Status of the Decommissioning Program—2012 Annual Report |
 |
|
|
|
11/27/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress and the U.S. Government Accountability Office (GAO) providing NRC’s response to GAO Report: "Organizational Transformation: Enterprise Architecture Value Needs to be Measured and Reported" (GAO-12-791) |
 |
|
|
|
11/26/2012 |
|
Letter from Chairman Allison M. Macfarlane to The President, Congress, and Government Accountability Office (GAO) providing NRC’s FY 2012 Performance and Accountability Report |
 |
|
|
|
11/21/2012 |
SECY-12-0125 |
Interim Actions to Execute Commission Preemption Authority Under Section 161a of the Atomic Energy Act of 1954, as Amended |
|
 |
 |
|
11/20/2012 |
|
12/06/2012 Meeting Agenda: Meeting with the Advisory Committee on Reactor Safeguards |
|
|
|
 |
11/20/2012 |
|
12/06/2012 Meeting Slides: Meeting with the Advisory Committee on Reactor Safeguards |
|
|
|
 |
11/20/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress and U.S. Government Accountability Office (GAO) reporting on actions the NRC has taken in response to the recommendation in the GAO report entitled “Spent Nuclear Fuel: Accumulating Quantities at Commercial Reactors Present Storage and Other Challenges” (GAO-12-797) |
 |
|
|
|
11/19/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress and U.S. Government Accountability Office (GAO) providing NRC's response to GAO’s report entitled "Nuclear Nonproliferation: Additional Actions Needed to Improve Security of Radiological Sources at U.S. Medical Facilities" (GAO-12-925) |
 |
|
|
|
11/19/2012 |
SECY-12-0155 |
Weekly Information Report - Week Ending November 9, 2012 |
 |
|
|
|
11/19/2012 |
|
Staff Requirements Memorandum: Strategic Programmatic Overview of the Spent Fuel Storage and Transportation and the Fuel Facilities Business Lines |
|
 |
|
|
11/19/2012 |
|
11/27/2012 Meeting Agenda: Briefing on Operator Licensing Program |
|
|
|
 |
11/19/2012 |
|
11/27/2012 Meeting Slides: Briefing on Operator Licensing Program |
|
|
|
 |
11/16/2012 |
SECY-12-0149 |
Annual Update 0f the Risk-Informed and Performance-Based Plan |
 |
|
|
|
11/14/2012 |
|
11/28/2012 Discussion of Management and Personnel Issues (Closed – Ex. 1, 2 and 6) |
|
|
|
 |
11/14/2012 |
|
11/28/2012 Discussion of Management and Personnel Issues (Closed – Ex. 2 & 6) – Full Written Explanation |
|
|
|
 |
11/13/2012 |
SECY-12-0154 |
Weekly Information Report - Week Ending November 2, 2012 |
 |
|
|
|
11/13/2012 |
|
Staff Requirements Memorandum: 11/05/12 All Employees Meeting |
|
 |
|
|
11/09/2012 |
SECY-12-0152 |
Weekly Information Report - Week Ending October 26, 2012 |
 |
|
|
|
11/09/2012 |
SECY-12-0151 |
Status Report on the Nuclear Regulatory Commission’s Operator Licensing and Requalification Training Inspection Programs for Licensed Operators |
 |
|
|
|
11/08/2012 |
CLI-12-20 |
Southern California Edison Co. |
 |
|
|
|
11/08/2012 |
|
11/08/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
11/07/2012 |
|
11/05/2012 Commission Meeting: NRC All Employees Meeting |
|
|
|
 |
11/02/2012 |
SECY-12-0148 |
Weekly Information Report - Week Ending October 19, 2012 |
 |
|
|
|
11/01/2012 |
SECY-12-0118 |
Resource Estimates and Request for Final Rule Schedule Extension and Delegation of Signature Authority for the Enhanced Weapons Rulemaking |
|
 |
 |
|
10/31/2012 |
SECY-12-0139 |
Annual Update on the Status of Emergency Preparedness Activities |
 |
|
|
|
10/25/2012 |
SECY-12-0099 |
Final Rule: Distribution of Source Material to Exempt Persons and to General Licensees and Revision of General License and Exemptions (RIN 3150-AH15) |
|
|
 |
|
10/25/2012 |
|
10/23/2012 Commission Meeting: Strategic Programmatic Overview of the Spent Fuel Storage and Transportation and Fuel Facilities Business Lines |
|
|
|
 |
10/23/2012 |
SECY-12-0144 |
Weekly Information Report - Week Ending October 12, 2012 |
 |
|
|
|
10/23/2012 |
SECY-12-0137 |
Implementation of the Cumulative Effects of Regulation Process Changes |
 |
|
|
|
10/23/2012 |
SECY-12-0136 |
Next Steps for the Analysis of Cancer Risks in Populations Near Nuclear Facilities Study |
 |
|
|
|
10/23/2012 |
|
10/23/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
10/23/2012 |
CLI-12-19 |
Exelon Generation Company, LLC |
 |
|
|
|
10/22/2012 |
SECY-12-0133 |
Status of the Accident Sequence Precursor Program and the Standardized Plant Analysis Risk Models |
 |
|
|
|
10/22/2012 |
SECY-12-0081 |
Risk-Informed Regulatory Framework for New Reactors |
|
 |
 |
|
10/19/2012 |
SECY-12-0132 |
Implementation of Commission Memorandum and Order CLI-12-16 Regarding Waste Confidence Decision and Rule |
 |
|
|
|
10/19/2012 |
|
Letter from Chairman Allison M. Macfarlane to Senator Barbara Boxer, regarding steam generator safety at the San Onofre Nuclear Generating Station (SONGS) |
 |
|
|
|
10/18/2012 |
|
11/29/2012 Briefing on Security Issues (Closed-Ex. 1) – Full Written Explanation |
|
|
|
 |
10/17/2012 |
SECY-12-0079 |
Partial Closure of Petition for Rulemaking (PRM-72-6) C-10 Research and Education Foundation, Inc. |
 |
 |
 |
|
10/17/2012 |
SECY-12-0141 |
Weekly Information Report - Week Ending October 5, 2012 |
 |
|
|
|
10/16/2012 |
|
10/23/2012 Meeting Agenda: Strategic Programmatic Overview of the Spent Fuel Storage and Transportation and Fuel Facilities Business Lines |
|
|
|
 |
10/16/2012 |
|
10/23/2012 Meeting Slides: Strategic Programmatic Overview of the Spent Fuel Storage and Transportation and Fuel Facilities Business Lines |
|
|
|
 |
10/16/2012 |
|
Staff Requirements Memorandum: 10/02/12 Strategic Programmatic Overview of the Nuclear Materials Users and Decommissioning and Low-Level Waste Business Lines |
|
 |
|
|
10/15/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding the August 12, 2012, shutdown of the Palisades Nuclear Plant |
 |
|
|
|
10/12/2012 |
SECY-12-0129 |
Stakeholder Feedback Regarding Emergency Preparedness Rule Implementation |
 |
|
|
|
10/12/2012 |
|
10/12/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
10/12/2012 |
CLI-12-18 |
Entergy Nuclear Operations, Inc. |
 |
|
|
|
10/11/2012 |
SECY-12-0138 |
Weekly Information Report - Week Ending September 28, 2012 |
 |
|
|
|
10/10/2012 |
SECY-12-0091 |
Completeness and Quality of Integrated Safety Analyses |
|
 |
 |
|
10/10/2012 |
SECY-12-0128 |
Annual Review of the Lessons-Learned Program |
 |
|
|
|
10/05/2012 |
SECY-12-0125 |
Interim Actions to Execute Commission Preemption Authority under Section 161A of the Atomic Energy Act of 1954, as Amended |
 |
|
|
|
10/04/2012 |
|
Staff Requirements Memorandum: 09/11/12 Briefing on Economic Consequences |
|
 |
|
|
10/04/2012 |
|
10/02/12 Commission Meeting: Strategic Programmatic Overview of the Nuclear Materials Users and Decommissioning and Low-Level Waste Business Lines |
|
|
|
 |
10/03/2012 |
SECY-12-0131 |
Weekly Information Report - Week Ending September 21, 2012 |
 |
|
|
|
10/03/2012 |
|
09/25/2012 Commission Meeting – Strategic Programmatic Overview of the New Reactors Business Line |
|
 |
|
|
10/02/2012 |
|
11/08/2012 Discussion of Management Issues (Closed – Ex. 2) – Full Written Explanation |
|
|
|
 |
09/27/2012 |
|
09/25/12 Commission Meeting: Strategic Programmatic Overview of the New Reactors Business Line |
|
|
|
 |
09/25/2012 |
|
10/02/2012 Meeting Slides: Strategic Programmatic Overview of the Nuclear Materials Users and Decommissioning and Low-Level Waste Business Lines |
|
|
|
 |
09/25/2012 |
|
10/02/2012 Meeting Agenda: Strategic Programmatic Overview of the Nuclear Materials Users and Decommissioning and Low-Level Waste Business Lines |
|
|
|
 |
09/25/2012 |
CLI-12-17 |
Virginia Electric and Power Company d/b/a Dominion Virginia Power and Old Dominion Electric Cooperative |
 |
|
|
|
09/25/2012 |
|
09/25/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
09/24/2012 |
SECY-12-0126 |
Weekly Information Report - Week Ending September 14, 2012 |
 |
|
|
|
09/19/2012 |
|
09/25/2012 Meeting Slides: Strategic Programmatic Overview of the New Reactors Business Line |
|
|
|
 |
09/19/2012 |
|
09/25/2012 Meeting Agenda: Strategic Programmatic Overview of the New Reactors Business Line |
|
|
|
 |
08/18/2012 |
SECY-01-0076 |
Retrievability of Spent Fuel from Dry Storage Casks |
 |
|
|
|
09/14/2012 |
SECY-12-0122 |
Weekly Information Report - Week Ending September 7, 2012 |
 |
|
|
|
09/14/2012 |
SECY-12-0118 |
Resource Estimates and Request for Final Rule Schedule Extension and Delegation of Signature Authority for the Enhanced Weapons Rulemaking |
 |
|
|
|
09/13/2012 |
|
09/11/12 Commission Meeting: Briefing on Economic Consequences |
|
|
|
 |
09/12/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding the training and operating experience of both the striking workers and operators at the Pilgrim Nuclear Power Station |
 |
|
|
|
09/11/2012 |
SECY-12-0120 |
Weekly Information Report - Week Ending August 31, 2012 |
 |
|
|
|
09/06/2012 |
SECY-12-0114 |
Periodic Assessment of the Activities of the Committee to Review Generic Requirements from June 1, 2011, Through May 31, 2012 |
 |
|
|
|
09/06/2012 |
COMSECY-12-0016 |
Approach for Addressing Policy Issues Resulting from Court Decision to Vacate Waste Confidence Decision and Rule |
 |
 |
 |
|
09/05/2012 |
|
09/11/2012 Meeting Slides: Briefing on Economic Consequences |
|
|
|
 |
09/05/2012 |
|
09/11/2012 Meeting Agenda: Briefing on Economic Consequences |
|
|
|
 |
09/04/2012 |
COMSECY-12-0018 |
Request to Solicit for the Appointment of a New Member on the Advisory Committee on Reactor Safeguards (ACRS) |
 |
 |
|
|
09/04/2012 |
SECY-12-0119 |
Weekly Information Report - Week Ending August 24, 2012 |
 |
|
|
|
08/31/2012 |
|
Letter from Chairman Allison M. Macfarlane to Senator Robert Menendez, regarding the installation of filtered containment vents at U.S. commercial nuclear power plants |
 |
|
|
|
08/31/2012 |
|
Letter from Chairman Allison M. Macfarlane to Senator Robert Menendez, regarding the continued safety of operating nuclear plants and need for NRC to act more promptly in responding to identified areas of concern |
 |
|
|
|
08/30/2012 |
SECY-11-0163 |
Reprocessing Rulemaking: Draft Regulatory Basis and Path Forward |
|
 |
 |
|
08/29/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress transmitting the NRC’s report addressing advanced reactor licensing |
 |
|
|
|
08/29/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Howard L. Berman, regarding concerns about the safety of U.S. boiling water reactors with Mark I containments |
 |
|
|
|
08/28/2012 |
SECY-12-0115 |
Weekly Information Report - Week Ending August 17, 2012 |
 |
|
|
|
08/28/2012 |
|
09/14/2012 Discussion of Management and Personnel Issues (Closed – Ex. 2 and 6) – Full Written Explanation |
|
|
|
 |
08/27/2012 |
|
Staff Requirements Memorandum: 08/07/12 Briefing on the Status of Lessons Learned from the Fukushima Dai-ichi Accident |
|
 |
|
|
08/22/2012 |
|
Letter from Chairman Allison M. Macfarlane to Senator Debbie Stabenow, regarding the Palisades Nuclear Plant |
 |
|
|
|
08/22/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Jeff Fortenberry, regarding concerns about the need for an assessment of proliferation risks as part of the NRC’s process for evaluating license applications |
 |
|
|
|
08/22/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding the recent shutdown of the Palisades Nuclear Plant as a result of a leak in a water storage tank |
 |
|
|
|
08/21/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress providing the 2011 “Report to Congress on the Security Inspection Program for Commercial Power Reactor and Category 1 Fuel Cycle Facilities: Results and Status Update” |
 |
|
|
|
08/21/2012 |
|
Letter from Chairman Allison M. Macfarlane to Senator Dianne Feinstein, regarding how the NRC will decide whether the San Onofre Nuclear Generation Station (SONGS) is safe to restart |
 |
|
|
|
08/21/2012 |
SECY-12-0110 |
Consideration of Economic Consequences within the U.S. Nuclear Regulatory Commission’s Regulatory Framework |
 |
|
|
|
08/20/2012 |
SECY-12-0097 |
Entergy Operations, Inc.’s Request to Relocate the River Bend Station Backup Emergency Operations Facility |
|
 |
 |
|
08/17/2012 |
|
07/10/12 Commission Meeting: Strategic Programmatic Overview of the Operating Reactors Business Line |
|
 |
|
|
08/17/2012 |
SECY-12-0112 |
Policy Statements on Agreement State Programs |
 |
|
|
|
08/16/2012 |
SECY-12-0111 |
Weekly Information Report - Week Ending August 10, 2012 |
 |
|
|
|
08/16/2012 |
SECY-12-0109 |
Weekly Information Report - Week Ending August 3, 2012 |
 |
|
|
|
08/15/2012 |
SECY-12-0105 |
Summary of Activities Related to the Generic Issues Program |
 |
|
|
|
08/13/2012 |
SECY-12-0053 |
Recommendations on Regulatory Changes for Permanent Implant Brachytherapy Programs |
|
 |
 |
|
08/10/2012 |
|
Letter from Chairman Allison M. Macfarlane to Senator Scott P. Brown, regarding the application for a renewed operating license at Pilgrim Nuclear Power Station |
 |
|
|
|
08/09/2012 |
|
08/07/12 Commission Meeting: Briefing on the Status of Lessons Learned from the Fukushima Dai-ichi Accident |
|
|
|
 |
08/08/2012 |
SECY-12-0103 |
Sixth Report on the Status of Reactivation of Construction and Licensing for Watts Bar Nuclear Plant, Unit 2 |
 |
|
|
|
08/08/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding the pending application for a 20-year extension of the operating license for the Pilgrim Nuclear Power Station |
 |
|
|
|
08/07/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding an independent review of the agency’s safety culture in light of recent issues raised in recent letters about NRC employees and their efforts to ensure the agency is making proper safety decisions |
 |
|
|
|
08/07/2012 |
|
08/07/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
08/07/2012 |
SECY-12-0107 |
Weekly Information Report - Week Ending July 27, 2012 |
 |
|
|
|
08/07/2012 |
CLI-12-16 |
Calvert Cliffs Nuclear Project, LLC,
Detroit Edison Co.,
Duke Energy Carolinas, LLC,
Entergy Nuclear Operations, Inc.,
Entergy Operations, Inc.,
Exelon Generation Co., LLC,
Exelon Nuclear Texas Holdings, LLC,
Firstenergy Nuclear Operating Co.,
Florida Power & Light Co.,
Luminant Generation Co. LLC,
Nextera Energy Seabrook, LLC,
Nuclear Innovation North America LLC,
Pacific Gas & Electric Co.,
PPL Bell Bend, LLC,
Progress Energy Carolinas, Inc.,
Progress Energy Florida, Inc.,
South Texas Project Nuclear Operating Co.,
Tennessee Valley Authority,
Union Electric Co.,
Virginia Electric and Power Co. d/b/a Dominion Virginia Power and Old Dominion Electric Cooperative |
 |
|
|
|
08/06/2012 |
COMSECY-12-0014 |
Revised Schedule and Plans for Japan Lessons Learned |
 |
 |
 |
|
08/06/2012 |
COMSECY-12-0014 |
Commissioner Ostendorff's vote on COMSECY-12-0014 – Revised Schedule and Plans for Japan Lessons Learned |
|
|
 |
|
08/06/2012 |
SECY-12-0101 |
Issuance of Bulletin 2012-01, "Design Vulnerability in Electric Power System" |
 |
|
|
|
08/06/2012 |
|
Letter from Chairman Allison M. Macfarlane to Senator Dianne Feinstein, regarding the NRC’s response to a recent GAO study entitled “Natural Hazard Assessments Could Be More Risk-Informed” |
 |
|
|
|
08/06/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress describing NRC’s response to GAO’s recommendation in GAO-12-465, “Nuclear Regulatory Commission – Natural Hazard Assessments Could Be More Risk-Informed” |
 |
|
|
|
08/03/2012 |
SECY-12-0099 |
Final Rule: Distribution of Source Material to Exempt Persons and to General Licensees and Revision of General License and Exemptions (RIN 3150-AH15) |
 |
|
|
|
08/03/2012 |
SECY-12-0064 |
Commissioner Apostolakis’ vote on SECY-12-0064 – Recommendations for Policy and Technical Direction to Revise Radiation Protection Regulations and Guidance |
|
|
 |
|
08/03/2012 |
COMSECY-12-0014 |
Commissioner Apostolakis’ vote on COMSECY-12-0014 – Revised Schedule and Plans for Japan Lessons Learned |
|
|
 |
|
08/01/2012 |
SECY-12-0097 |
Entergy Operations, Inc.’s Request to Relocate the River Bend Station Backup Emergency Operations Facility |
 |
|
|
|
08/01/2012 |
|
08/07/2012 Meeting Slides: Briefing on the Status of Lessons Learned from the Fukushima Dai-ichi Accident |
|
|
|
 |
08/01/2012 |
|
08/07/2012 Meeting Agenda: Briefing on the Status of Lessons Learned from the Fukushima Dai-ichi Accident |
|
|
|
 |
07/30/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding request that the Commission deny staff’s request to relicense the Pilgrim Nuclear Power Station |
 |
|
|
|
07/30/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding concerns about the safe operation of the Pilgrim Nuclear Station during the strike which ended on July 8, 2012 |
 |
|
|
|
07/30/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress and GAO, responding to one recommendation that applies to the NRC in GAO Report, “Uranium Mining: Opportunities Exist to Improve Oversight of Financial Assurances,” (GAO-12-544) |
 |
|
|
|
07/27/2012 |
SECY-12-0102 |
Weekly Information Report - Week Ending July 20, 2012 |
 |
|
|
|
07/26/2012 |
SECY-12-0095 |
Tier 3 Program Plans and 6-Month Status Update in Response to Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami
|
 |
|
|
|
07/24/2012 |
SECY-12-0091 |
Completeness and Quality of Integrated Safety Analyses |
 |
|
|
|
07/24/2012 |
SECY-12-0093 |
Closure Options for Generic Safety Issue - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance |
 |
|
|
|
07/24/2012 |
SECY-12-0092 |
State-of-the-Art Reactor Consequence Analyses - Recommendation for Limited Additional Analysis |
 |
|
|
|
07/23/2012 |
SECY-12-0098 |
Weekly Information Report - Week Ending July 13, 2012 |
 |
|
|
|
07/19/2012 |
SECY-12-0074 |
Scheduling a Follow-Up Integrated Regulatory Review Service (IRRS) Mission in the United States |
 |
|
|
|
07/19/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding commitments to undertake safety and other improvements by NRC licensees |
 |
|
|
|
07/18/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding the recent GAO Report, "Nuclear Regulation: NRC’s Oversight of Nuclear Power Reactors’ Decommissioning Funds Could be Further Strengthened" |
 |
|
|
|
07/18/2012 |
|
Letter from Chairman Allison M. Macfarlane to Congress and GAO, providing responses to the recommendations made by the GAO in their report “Nuclear Regulation: NRC’s Oversight of Nuclear Power Reactors’ Decommissioning Funds Could Be Further Strengthened” (GAO-12-258) |
 |
|
|
|
07/16/2012 |
|
07/10/12 Commission Meeting: Strategic Programmatic Overview of the Operating Reactors Business Line |
|
|
|
 |
07/16/2012 |
|
Staff Requirements Memorandum: 06/07/12 Meeting with the Advisory Committee on Reactor Safeguards (ACRS) |
|
 |
|
|
07/16/2012 |
SECY-12-0088 |
The Nuclear Regulatory Commission Cyber Security Roadmap |
 |
|
|
|
07/13/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Edward J. Markey, regarding a request that a public meeting be held near the Seabrook Station on the issue of concrete degradation |
 |
|
|
|
07/13/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator John F. Kerry, regarding concrete degradation at Seabrook Station |
 |
|
|
|
07/12/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator Dianne Feinstein, regarding the availability of radiological monitoring data from commercial nuclear power plants |
 |
|
|
|
07/12/2012 |
SECY-12-0094 |
Weekly Information Report - Week Ending July 6, 2012 |
 |
|
|
|
07/06/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator Dianne Feinstein, regarding the sufficiency of NRC actions following the accident at the Fukushima Dai-ichi nuclear facility in Japan |
 |
|
|
|
07/06/2012 |
SECY-12-0089 |
Weekly Information Report - Week Ending June 29, 2012 |
 |
|
|
|
07/03/2012 |
SECY-12-0084 |
Status Report on Power Uprates |
 |
|
|
|
07/02/2012 |
SECY-12-0004 |
Final Rule – 10 CFR Parts 2, 12, 51, 54, and 61 “Amendments to Adjudicatory Process Rules and Related Requirements" (RIN 3150-AI43) |
|
|
 |
|
07/02/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator Ron Wyden regarding the long-term safety of the Fukushima Dai-ichi Nuclear Power Station |
 |
|
|
|
07/02/2012 |
|
07/10/2012 Meeting Slides: Briefing on Strategic Programmatic Overview of the Operating Reactors Business Line |
|
|
|
 |
07/02/2012 |
|
07/10/2012 Meeting Agenda: Briefing on Strategic Programmatic Overview of the Operating Reactors Business Line |
|
|
|
 |
06/29/2012 |
|
06/29/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
06/29/2012 |
SECY-12-0087 |
Weekly Information Report - Week Ending June 22, 2012 |
 |
|
|
|
06/28/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator Robert P. Casey, Jr., regarding the adequacy of evacuation plans for communities surrounding U.S. nuclear power plants in light of the events at Japan's Fukushima Dai-ichi facility |
 |
|
|
|
06/27/2012 |
|
06/15/12 Commission Meeting: Joint Meeting of the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) on Grid Reliability |
|
|
|
 |
06/26/2012 |
SECY-12-0069 |
Process for Addressing Late-Breaking Issues During a Combined License Application Review |
|
 |
 |
|
06/25/2012 |
|
Letter from Chaiman Gregory B. Jaczko to Senator Dianne Feinstein regarding NRC’s assessment of current conditions at the Fukushima Dai-ichi site |
 |
|
|
|
06/25/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congresswoman Nita M. Lowey regarding the adequacy of evacuation plans for communities surrounding U.S. nuclear power plants in light of events at Japan’s Fukushima Dai-ichi facility last year |
 |
|
|
|
06/21/2012 |
SECY-12-0085 |
Weekly Information Report - Week Ending June 15, 2012 |
 |
|
|
|
06/21/2012 |
|
Staff Requirements Memorandum: 06/15/12 Joint Meeting of the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) on Grid Reliability |
|
 |
|
|
06/21/2012 |
SECY-12-0081 |
Risk-Informed Regulatory Framework for New Reactors |
 |
|
|
|
06/18/2012 |
SECY-12-0066 |
Criminal Penalties for the Unauthorized Introduction of Weapons into Facilities Designated by the U.S. Nuclear Regulatory Commission and for Sabotage of Nuclear Facilities or Fuel |
|
 |
 |
|
06/18/2012 |
SECY-12-0082 |
Weekly Information Report - Week Ending June 8, 2012 |
 |
|
|
|
06/18/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator Barbara Boxer regarding recent problems with steam generators at the San Onofre Nuclear Generating Station (SONGS) |
 |
|
|
|
06/15/2012 |
SECY-12-0078 |
Annual Status Report: Activities Related to Extended Storage and Transportation and the Long-Term Waste Confidence Update |
 |
|
|
|
06/15/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congress providing NRC’s Semiannual Report on the Status of Licensing and Other Regulatory Activities |
 |
|
|
|
06/13/2012 |
SECY-12-0076 |
Plan for Retrospective Analysis of Existing Rules |
 |
|
|
|
06/13/2012 |
SECY-12-0060 |
Proposed Changes to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Associated with Buried Piping |
|
 |
 |
|
06/12/2012 |
|
06/15/2012 Meeting Agenda: Joint Meeting of the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) on Grid Reliability |
|
|
|
 |
06/12/2012 |
|
06/15/2012 Meeting Slides: Joint Meeting of the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) on Grid Reliability |
|
|
|
 |
06/12/2012 |
|
06/07/12 Commission Meeting: Meeting with the Advisory Committee on Reactor Safeguards (ACRS) |
|
|
|
 |
06/11/2012 |
|
Staff Requirements Memorandum: 06/01/12 Briefing on the Results of the Agency Action Review Meeting (AARM) |
|
 |
|
|
06/08/2012 |
COMSECY-12-0012 |
Request Closure of Several New Reactor Taskings |
 |
 |
 |
|
06/08/2012 |
SECY-12-0009 |
Final Rule: 10 CFR 73.37, "Physical Protection of Irradiated Fuel in Transit" (RIN 3150-AI64) |
|
|
 |
|
06/08/2012 |
SECY-12-0080 |
Weekly Information Report - Week Ending June 1, 2012 |
 |
|
|
|
06/07/2012 |
SECY-12-0026 |
Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Referred Ruling in LBP-11-32 (Nov. 18, 2011); San Luis Obispo Mothers for Peace’s Petition for Partial Interlocutory Review of LBP-11-32 (Dec. 5, 2011) |
|
 |
|
|
06/07/2012 |
SECY-12-0009 |
06/07/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
06/07/2012 |
CLI-12-15 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
 |
|
|
|
06/07/2012 |
CLI-12-14 |
Virginia Electric and Power Company |
 |
|
|
|
06/07/2012 |
CLI-12-13 |
Pacific Gas and Electric Company |
 |
|
|
|
06/07/2012 |
|
Letter from Chairman Gregory B. Jaczko to Office of Management and Budget (OMB) enclosing the NRC’s Fiscal Year 2012 Regulatory Plan |
 |
|
|
|
06/06/2012 |
|
06/07/2012 Discussion of Management and Personnel Issues (Closed – Ex. 2 and 6) – Full Written Explanation |
|
|
|
 |
06/05/2012 |
SECY-12-0032 |
Report to Congress on Abnormal Occurrences: Fiscal Year 2011 |
 |
 |
 |
|
06/05/2012 |
SECY-12-0060 |
Chairman Jaczko's vote on SECY-12-0060 – Proposed Changes to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Associated with Buried Piping |
|
|
 |
|
06/05/2012 |
|
06/01/2012 Commission Meeting: Briefing on Results of the Agency Action Review Meeting (AARM) |
|
|
|
 |
06/05/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congress providing "Report to Congress on Abnormal Occurrences: Fiscal Year (FY) 2011." |
 |
|
|
|
06/04/2012 |
|
06/07/2012 Meeting Slides: Meeting with the Advisory Committee on Reactor Safeguards (ACRS) |
|
|
|
 |
06/04/2012 |
|
06/07/2012 Meeting Agenda: Meeting with the Advisory Committee on Reactor Safeguards (ACRS) |
|
|
|
 |
06/04/2012 |
SECY-12-0069 |
Chairman Jaczko's vote on SECY-12-0069 – Process for Addressing Late-Breaking Issues During a Combined License Application Review |
|
|
 |
|
06/04/2012 |
SECY-12-0066 |
Chairman Jaczko's vote on SECY-12-0066 – Criminal Penalties for the Unauthorized Introduction of Weapons into Facilities Designated by the U.S. Nuclear Regulatory Commission and for Sabotage of Nuclear Facilities or Fuel |
|
|
 |
|
06/04/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Fred Upton regarding the status of the staff’s submittal on SECY-12-0062 requesting authorization to issue Pilgrim’s renewed license |
 |
|
|
|
06/01/2012 |
SECY-12-0077 |
Weekly Information Report - Week Ending May 25, 2012 |
 |
|
|
|
05/31/2012 |
SECY-12-0075 |
Weekly Information Report - Week Ending May 18, 2012 |
 |
|
|
|
05/25/2012 |
SECY-12-0062 |
Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station |
|
 |
 |
|
05/24/2012 |
SECY-12-0046 |
Options for Revising the Regulatory Approach to Ground Water Protection |
|
 |
 |
|
05/24/2012 |
|
06/01/2012 Meeting Slides: Briefing on Results of the Agency Action Review Meeting (AARM) |
|
|
|
 |
05/24/2012 |
|
06/01/2012 Meeting Agenda: Briefing on Results of the Agency Action Review Meeting (AARM) |
|
|
|
 |
05/24/2012 |
SECY-12-0062 |
Chairman Jaczko's vote on SECY-12-0062 – Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station |
|
|
 |
|
05/22/2012 |
COMWDM-12-0001 |
Tribal Consultation Policy Statement and Protocol |
 |
 |
 |
|
05/22/2012 |
SECY-12-0071 |
Final Rule: Domestic Licensing of Source Material - Amendments/Integrated Safety Analysis (RIN 3150-AI50) |
 |
|
|
|
05/21/2012 |
|
Staff Requirements Memorandum: 04/10/12 Briefing on the Final Report of the Blue Ribbon Commission on America’s Nuclear Future |
|
 |
|
|
05/21/2012 |
|
Staff Requirements Memorandum: 05/11/12 Briefing on Potential Medical Isotope Production Licensing Actions |
|
 |
|
|
05/21/2012 |
SECY-12-0069 |
Process for Addressing Late-Breaking Issues During a Combined License Application Review |
 |
|
|
|
05/18/2012 |
SECY-12-0042 |
Colorado Alternative Standards; Implementation of the Alternative Standards Provision in Section 274o of the Atomic Energy Act of 1954, As Amended |
|
 |
 |
|
05/17/2012 |
SECY-12-0073 |
Weekly Information Report - Week Ending May 11, 2012 |
 |
|
|
|
05/16/2012 |
|
05/11/2012 Commission Meeting: Briefing on Potential Medical Isotope Production Licensing Actions |
|
|
|
 |
05/11/2012 |
SECY-12-0030 |
Final Rule: Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (RIN 3150-AI77) |
|
|
 |
|
05/11/2012 |
SECY-12-0072 |
Weekly Information Report - Week Ending May 4, 2012 |
 |
|
|
|
05/11/2012 |
SECY-12-0066 |
Criminal Penalties for the Unauthorized Introduction of Weapons into Facilities Designated by the U.S. Nuclear Regulatory Commission and for Sabotage of Nuclear Facilities or Fuel |
 |
|
|
|
05/11/2012 |
SECY-12-0019 |
Denial of Petition for Rulemaking Requesting Amendments to 10 CFR Part 54 Regarding License Renewal Applications Submitted 20 Years Before Expiration of the Operating License (PRM-54-6) |
 |
 |
 |
|
05/11/2012 |
SECY-12-0030 |
05/11/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
05/11/2012 |
CLI-12-12 |
Strata Energy, Inc. |
 |
|
|
|
05/10/2012 |
SECY-12-0064 |
Recommendations for Policy and Technical Direction to Revise Radiation Protection Regulations and Guidance |
 |
|
|
|
05/08/2012 |
SECY-12-0063 |
Final Rule: Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (10 CFR Part 51; RIN 3150–AI42) |
 |
|
|
|
05/07/2012 |
SECY-12-0046 |
Chairman Jaczko's vote on SECY-12-0046 – Options for Revising the Regulatory Approach to Ground Water Protection |
|
|
 |
|
05/07/2012 |
SECY-12-0042 |
Chairman Jaczko's vote on SECY-12-0042 – Colorado Alternative Standards; Implementation of the Alternative Standards Provision in Section 274o of the Atomic Energy Act of 1954, As Amended |
|
|
 |
|
05/07/2012 |
SECY-12-0009 |
Chairman Jaczko's vote on SECY-12-0009 – Final Rule: 10 CFR 73.37, “Physical Protection of Irradiated Fuel in Transit” (RIN 3150-AI64) |
|
|
 |
|
05/07/2012 |
SECY-12-0004 |
Chairman Jaczko's vote on SECY-12-0004 – Final Rule – 10 CFR Parts 2, 12, 51, 54, and 61 “Amendments to Adjudicatory Process Rules and Related Requirements" (RIN 3150-AI43) |
|
|
 |
|
05/07/2012 |
SECY-12-0068 |
Weekly Information Report - Week Ending April 27, 2012 |
 |
|
|
|
05/07/2012 |
|
05/11/2012 Meeting Slides: Briefing on Potential Medical Isotope Production Licensing Actions |
|
|
|
 |
05/07/2012 |
|
05/11/2012 Meeting Agenda: Briefing on Potential Medical Isotope Production Licensing Actions |
|
|
|
 |
05/04/2012 |
|
Staff Requirements Memorandum: 04/30/12 Briefing on Human Capital and Equal Employment Opportunity |
|
 |
|
|
05/04/2012 |
SECY-12-0027 |
Preemption Authority Pursuant to Section 161A, "Use of Firearms by Security Personnel," of the Atomic Energy Act of 1954, as Amended |
|
 |
 |
|
05/04/2012 |
|
05/11/2012 Discussion of Management and Personnel Issues (Closed – Ex. 2 and 6) – Full Written Explanation |
|
|
|
 |
05/02/2012 |
|
Staff Requirements Memorandum: 04/24/12 Briefing on Part 35 Medical Events Definitions – Permanent Implant Brachytherapy |
|
 |
|
|
05/01/2012 |
|
04/30/2012 Commission Meeting: Briefing on Human Capital and Equal Employment Opportunity (EEO) |
|
|
|
 |
05/01/2012 |
SECY-12-0060 |
Proposed Changes to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Associated with Buried Piping |
 |
|
|
|
05/01/2012 |
SECY-12-0059 |
Construction Reactor Oversight Process Self-Assessment for Calendar Year 2011 |
 |
|
|
|
04/30/2012 |
SECY-12-0065 |
Weekly Information Report - Week Ending April 20, 2012 |
 |
|
|
|
04/30/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Ros-Lehtinen regarding concerns of Turkey Point Nuclear Plant ability to withstand and respond to any possible disaster |
 |
|
|
|
04/30/2012 |
SECY-12-0030 |
Chairman Jaczko's vote on SECY-12-0030 – Final Rule: Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (RIN 3150-AI77) |
|
|
 |
|
04/26/2012 |
|
04/24/2012 Commission Meeting: Briefing on Part 35 Medical Events Definitions Permanent Implant Brachytherapy |
|
|
|
 |
04/26/2012 |
SECY-10-0161 |
Final Rule: Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements (10 CFR 50.46a) (RIN 3150-AH29) |
|
 |
|
|
04/25/2012 |
SECY-12-0062 |
Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station |
 |
|
|
|
04/24/2012 |
SECY-12-0061 |
Weekly Information Report - Week Ending April 13, 2012 |
 |
|
|
|
04/23/2012 |
SECY-12-0056 |
Fiscal Year 2011 Results of the Industry Trends Program for Operating Power Reactors |
 |
|
|
|
04/23/2012 |
SECY-12-0055 |
Reactor Oversight Process Self-Assessment for Calendar Year 2011 |
 |
|
|
|
04/23/2012 |
|
04/30/2012 Meeting Slides: Briefing on Human Capital and Equal Employment Opportunity (EEO) |
|
|
|
 |
04/23/2012 |
|
04/30/2012 Meeting Agenda: Briefing on Human Capital and Equal Employment Opportunity (EEO) |
|
|
|
 |
04/20/2012 |
SECY-12-0052 |
Annual Report to the Commission on Licensee Performance in the Materials and Waste Programs Fiscal Year 2011 |
 |
|
|
|
04/18/2012 |
SECY-11-0155 |
Proposed Changes to the Enforcement Policy Associated with Construction Activities |
|
 |
 |
|
04/18/2012 |
SECY-12-0050 |
Status of the U.S. Nuclear Regulatory Commission’s Response to the Open Government Directive |
 |
|
|
|
04/17/2012 |
|
04/24/2012 Meeting Slides: Briefing on Part 35 Medical Events Definitions – Permanent Implant Brachytherapy |
|
|
|
 |
04/17/2012 |
|
04/24/2012 Briefing on Part 35 Medical Events Definitions – Permanent Implant Brachytherapy – Meeting Agenda |
|
|
|
 |
04/16/2012 |
|
04/16/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
04/16/2012 |
SECY-12-0049 |
Status of Regulatory Guide Update Program |
 |
|
|
|
04/16/2012 |
CLI-12-11 |
Southern Nuclear Operating Co. |
 |
|
|
|
04/13/2012 |
SECY-12-0047 |
Revisions to the Nuclear Regulatory Commission Enforcement Policy |
 |
|
|
|
04/13/2012 |
SECY-12-0046 |
Options for Revising the Regulatory Approach to Ground Water Protection |
 |
|
|
|
04/13/2012 |
SECY-11-0175 |
Proposed Rule: Amendments to Material Control and Accounting Regulations (RIN 3150-AI61) |
|
 |
 |
|
04/12/2012 |
|
04/10/2012 Commission Meeting: Briefing on the Final Report of the Blue Ribbon Commission on America’s Nuclear Future |
|
|
|
 |
04/12/2012 |
SECY-12-0057 |
Weekly Information Report - Week Ending April 6, 2012 |
 |
|
|
|
04/10/2012 |
SECY-12-0011 |
Data Collection Regarding Patient Release |
|
 |
 |
|
04/10/2012 |
SECY-12-0054 |
Weekly Information Report - Week Ending March 30, 2012 |
 |
|
|
|
04/10/2012 |
SECY-12-0053 |
Recommendations on Regulatory Changes for Permanent Implant Brachytherapy Programs |
 |
|
|
|
04/10/2012 |
|
Staff Requirements Memorandum: 04/03/12 Meeting with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) |
|
 |
|
|
04/06/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Brad Sherman regarding safety and security at U.S. nuclear power plants following the accident at Fukushima Dai-ichi |
 |
|
|
|
04/06/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congress providing NRC’s Fiscal Year 2011 Annual Report on the No FEAR Act of 2002 |
 |
|
|
|
04/04/2012 |
|
04/03/2012 Commission Meeting: with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) |
|
|
|
 |
04/04/2012 |
|
04/10/2012 Meeting Slides: Briefing on the Final Report of the Blue Ribbon Commission on America’s Nuclear Future |
|
|
|
 |
04/04/2012 |
|
04/10/2012 Meeting Agenda: Briefing on the Final Report of the Blue Ribbon Commission on America’s Nuclear Future |
|
|
|
 |
04/03/2012 |
SECY-12-0040 |
Activities Addressing Implementation and Assessment of the Alternative Dispute Resolution Program in the Office of Enforcement |
 |
|
|
|
04/03/2012 |
|
Staff Requirements Memorandum: 03/27/12 Briefing on License Renewal for Research and Test Reactors |
|
 |
|
|
04/03/2012 |
SECY-12-0042 |
Colorado Alternative Standards; Implementation of the Alternative Standards Provision in Section 274o of the Atomic Energy Act of 1954, As Amended |
 |
|
|
|
04/02/2012 |
|
03/30/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
03/30/2012 |
CLI-12-10 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
 |
|
|
|
03/30/2012 |
CLI-12-09 |
South Carolina Electric & Gas Co. and South Carolina Public Service Authority |
 |
|
|
|
03/29/2012 |
|
03/27/12 Commission Meeting: Briefing on License Renewal for Research and Test Reactors |
|
|
|
 |
03/29/2012 |
SECY-12-0045 |
Weekly Information Report - Week Ending March 23, 2012 |
 |
|
|
|
03/28/2012 |
|
04/03/2012 Meeting Agenda: Meeting with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) |
|
|
|
 |
03/28/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congress submitting NRC’s FY-2011 Buy American Act Report |
 |
|
|
|
03/27/2012 |
SECY-11-0130 |
03/27/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
03/27/2012 |
CLI-12-08 |
FirstEnergy Nuclear Operating Company |
 |
|
|
|
03/23/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congress providing a draft bill with provisions intended to streamline the NRC licensing process and improve administrative efficiency |
 |
|
|
|
03/22/2012 |
SECY-12-0010 |
Engagement of Stakeholders Regarding the Events in Japan |
|
 |
 |
|
03/22/2012 |
|
Letter from Chairman Gregory B. Jaczko to The President and Congress transmitting the NRC’s updated Strategic Plan for Fiscal Years 2008-2013 |
 |
|
|
|
03/22/2012 |
SECY-12-0041 |
Weekly Information Report - Week Ending March 16, 2012 |
 |
|
|
|
03/21/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congress, GAO and OMB providing a summary of actions taken by the NRC in response to recommendations contained in GAO reports that address NRC activities |
 |
|
|
|
03/20/2012 |
|
03/27/2012 Meeting Slides: Briefing on License Renewal for Research and Test Reactors |
|
|
|
 |
03/20/2012 |
|
03/27/2012 Meeting Agenda: Briefing on License Renewal for Research and Test Reactors |
|
|
|
 |
03/20/2012 |
SECY-12-0003 |
Draft Final Policy Statement on Volume Reduction and Low-Level Radioactive Waste Management |
|
 |
 |
|
03/20/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator Barbara Boxer regarding recent events at the San Onofre Nuclear Generating Station (SONGS) |
 |
|
|
|
03/19/2012 |
SECY-11-0170 |
Final Rule: Physical Protection of Byproduct Material (RIN 3150-AI12) |
|
|
 |
|
03/19/2012 |
SECY-12-0034 |
Proposed Rulemaking – 10 CFR 50.46c: Emergency Core Cooling System Performance During Loss-Of-Coolant Accidents (RIN 3150- AH42) |
 |
|
|
|
03/19/2012 |
SECY-12-0037 |
Blue Ribbon Commission Final Report: Status of Relevant Nuclear Regulatory Commission Activities |
 |
|
|
|
03/19/2012 |
SECY-11-0170 |
03/16/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
03/19/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congress submitting NRC’s report on the status of its implementation of the Near-Term Task Force recommendations related to insights gained from the Fukushima Dai-ichi accident |
 |
|
|
|
03/16/2012 |
CLI-12-07 |
Luminant Generation Company LLC, Energy Northwest, Southern Nuclear Operating Co., and Duke Energy Carolinas, LLC |
 |
|
|
|
03/15/2012 |
SECY-12-0038 |
Weekly Information Report - Week Ending March 9, 2012 |
 |
|
|
|
03/13/2012 |
SECY-12-0031 |
Enforcement Alternatives for Sites That Indicate Additional Time Required to Submit Their License Amendment Requests to Transition to 10 CFR 50.48(C) National Fire Protection Association Standard 805 |
 |
|
|
|
03/09/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator Mark Kirk regarding the retention and availability of records associated with NRC’s Yucca Mountain license review activities |
 |
|
|
|
03/09/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Edward J. Markey regarding the issuance of a combined license or limited work authorization for Vogtle, Units 3 and 4 |
 |
|
|
|
03/09/2012 |
SECY-12-0035 |
Weekly Information Report - Week Ending March 2, 2012 |
 |
|
|
|
03/09/2012 |
SECY-12-0030 |
Final Rule: Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (RIN 3150-AI77) |
 |
|
|
|
03/09/2012 |
SECY-12-0025 |
Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami |
|
 |
 |
|
03/08/2012 |
CLI-12-06 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
 |
|
|
|
03/08/2012 |
CLI-12-05 |
Nextera Energy Seabrook, LLC |
 |
|
|
|
03/08/2012 |
|
03/08/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
03/07/2012 |
SECY-12-0027 |
Preemption Authority Pursuant to Section 161A., "Use Of Firearms By Security Personnel," of The Atomic Energy Act Of 1954, as Amended |
 |
|
|
|
03/07/2012 |
SECY-12-0010 |
Chairman Jaczko's vote on SECY-12-0010 – Engagement of Stakeholders Regarding the Events in Japan |
|
|
 |
|
03/05/2012 |
|
02/22/12 Commission Meeting: Briefing on Fort Calhoun |
|
 |
|
|
03/02/2012 |
SECY-12-0008 |
Implementation Plan for the Safety Culture Policy Statement |
|
 |
 |
|
03/02/2012 |
COMSECY-12-0005 |
Renewal of Advisory Committee on Medical Isotopes (ACMUI) Charter |
 |
 |
 |
|
03/02/2012 |
SECY-12-0025 |
Commissioner Svinicki's Vote on SECY-12-0025 – Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami |
|
|
 |
|
03/01/2012 |
SECY-12-0025 |
Commissioner Apostolakis’ Vote on SECY-12-0025 – Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami |
|
|
 |
|
03/01/2012 |
SECY-12-0025 |
Commissioner Ostendorff's Vote on SECY-12-0025 – Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami |
|
|
 |
|
03/01/2012 |
SECY-12-0025 |
Commissioner Magwood's Vote on SECY-12-0025 – Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami |
|
|
 |
|
03/01/2012 |
SECY-12-0025 |
Chairman Jaczko's Vote on SECY-12-0025 – Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami |
|
|
 |
|
03/01/2012 |
SECY-12-0033 |
Weekly Information Report - Week Ending February 24, 2012 |
 |
|
|
|
03/01/2012 |
SECY-12-0008 |
Chairman Jaczko's Vote on SECY-12-0008 – Implementation Plan for the Safety Culture Policy Statement |
|
|
 |
|
03/01/2012 |
SECY-12-0003 |
Chairman Jaczko's Vote on SECY-12-0003 – Draft Final Policy Statement on Volume Reduction and Low-Level Radioactive Waste Management |
|
|
 |
|
03/01/2012 |
SECY-11-0170 |
Chairman Jaczko's Vote on SECY-11-0170 – Final Rule: Physical Protection of Byproduct Material (RIN 3150-AI12) |
|
|
 |
|
02/28/2012 |
SECY-12-0028 |
Weekly Information Report - Week Ending February 17, 2012 |
 |
|
|
|
02/27/2012 |
SECY-11-0133 |
Options to Evaluate Requests to Use Discounted Parent Company Guarantees to Assure Funding of Decommissioning Cost for Power Reactors |
|
 |
 |
|
02/23/2012 |
|
02/22/12 Commission Meeting: Briefing on Fort Calhoun |
|
|
|
 |
02/22/2012 |
|
02/22/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
02/22/2012 |
SECY-12-0025 |
Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami |
 |
|
|
|
02/22/2012 |
CLI-12-04 |
Crow Butte Resources, Inc. |
 |
|
|
|
02/22/2012 |
CLI-12-03 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
 |
|
|
|
02/21/2012 |
SECY-12-0024 |
Weekly Information Report - Week Ending February 10, 2012 |
 |
|
|
|
02/21/2012 |
|
Letter from Chairman Gregory B. Jaczko to Senator Thomas R. Carper transmitting NRC's Fiscal Year 2013 Congressional Budget Justification. |
 |
|
|
|
02/17/2012 |
|
Letter from Chairman Gregory B. Jaczko to Japanese Ambassador Ichiro Fujisaki, Mr. Richard Reed, Special Assistant to the President for National Security Affairs and Senior Director for Resilience, and Mr. Jim Zumwalt, Deputy Assistant Secretary for Japan and Korean Affairs, U.S. Dept. of State, inviting them to speak at the NRC program entitled “One Year Commemoration of Events at Fukushima Dai-ichi” |
 |
|
|
|
02/17/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Edward J. Markey regarding the use of types 410 and 416 martensitic stainless steel at nuclear power plants |
 |
|
|
|
02/16/2012 |
SECY-11-0108 |
Regulation of Chemical Security |
|
 |
 |
|
02/16/2012 |
SECY-12-0020 |
Fifth Report on the Status of Reactivation of Construction and Licensing for Watts Bar Nuclear Plant, Unit 2 |
 |
|
|
|
02/15/2012 |
|
02/22/2012 Meeting Slides: Briefing on Fort Calhoun |
|
|
|
 |
02/15/2012 |
|
02/22/2012 Meeting Agenda: Briefing on Fort Calhoun |
|
|
|
 |
02/14/2012 |
|
02/09/12 Commission Meeting: Briefing on Status of Outreach and Educational Efforts with External Stakeholders Related to the Safety Culture Policy Statement |
|
|
|
 |
02/14/2012 |
SECY-12-0011 |
Chairman Jaczko's Vote on SECY-12-0011 – Data Collection Regarding Patient Release |
|
|
 |
|
02/14/2012 |
SECY-12-0023 |
Weekly Information Report - Week Ending February 3, 2012 |
 |
|
|
|
02/13/2012 |
|
02/13/2012 Discussion of Management and Personnel Issues (Closed – Ex. 2 and 6) – Full Written Explanation |
|
|
|
 |
02/13/2012 |
SECY-12-0016 |
2011 Annual Report on Commission Adjudication |
 |
|
|
|
02/13/2012 |
|
Staff Requirements Memorandum: 02/09/12 Briefing on Status of Outreach and Educational Efforts with External Stakeholders Related to the Safety Culture Policy Statement |
|
 |
|
|
02/10/2012 |
SECY-12-0015 |
Annual Report on Court Litigation (Calendar Year 2011) |
 |
|
|
|
02/09/2012 |
|
02/09/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
02/09/2012 |
CLI-12-01 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. |
 |
|
|
|
02/09/2012 |
SECY-12-0011 |
Data Collection Regarding Patient Release |
 |
|
|
|
02/09/2012 |
CLI-12-02 |
Southern Nuclear Operating Co. |
 |
|
|
|
02/09/2012 |
|
Staff Requirements Memorandum: 01/11/12 Briefing on Proposed Rule to Revise the Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (Part 51) |
|
 |
|
|
02/07/2012 |
SECY-11-0172 |
Response To Staff Requirements Memorandum COMGEA-11-0001, "Utilization of Expert Judgment in Regulatory Decision Making" |
|
 |
 |
|
02/07/2012 |
SECY-12-0010 |
Engagement of Stakeholders Regarding the Events in Japan |
 |
|
|
|
02/07/2012 |
SECY-12-0009 |
Final Rule: 10 CFR 73.37, "Physical Protection of Irradiated Fuel in Transit" (RIN 3150-AI64) |
 |
|
|
|
02/07/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Dennis J. Kucinich regarding cracks in the Davis-Besse Nuclear Power Station shield building |
 |
|
|
|
02/03/2012 |
SECY-12-0018 |
Weekly Information Report - Week Ending January 27, 2012 |
 |
|
|
|
02/03/2012 |
SECY-11-0175 |
Chairman Jaczko's Vote on SECY-11-0175 – Proposed Rule: Amendments to Material Control and Accounting Regulations (RIN 3150-AI61) |
|
|
 |
|
02/03/2012 |
|
02/08/2012 Briefing on International Issues (Closed – Ex. 1) – Full Written Explanation |
|
|
|
 |
02/02/2012 |
|
02/09/2012 Meeting Agenda: Briefing on Status of Outreach and Educational Efforts with External Stakeholders Related to the Safety Culture Policy Statement |
|
|
|
 |
02/02/2012 |
|
02/09/2012 Meeting Slides: Briefing on Status of Outreach and Educational Efforts with External Stakeholders Related to the Safety Culture Policy Statement |
|
|
|
 |
02/01/2012 |
SECY-11-0172 |
Chairman Jaczko's Vote on SECY-11-0172 – Response To Staff Requirements Memorandum COMGEA-11-0001, "Utilization of Expert Judgment in Regulatory Decision Making" |
|
|
 |
|
01/31/2012 |
|
Letter from Chairman Gregory B. Jaczko to Lawrence A. Melton, General Services Administration (GSA), regarding the renewed operations and maintenance agreement for the One White Flint North building |
 |
|
|
|
01/31/2012 |
SECY-11-0142 |
Final Rule: Advance Notification to Native American Tribes of Transport of Certain Types of Nuclear Waste (RIN 3150-AG41) |
|
|
 |
|
01/31/2012 |
SECY-11-0129 |
Final Rule: Requirements For Distribution Of Byproduct Material, 10 CFR Parts 30, 31, 32, 40, and 70 (RIN 3150-AH91) |
|
|
 |
|
01/30/2012 |
SECY-12-0008 |
Implementation Plan for the Safety Culture Policy Statement |
 |
|
|
|
01/30/2012 |
|
01/30/2012 Commission Meeting – Affirmation Session |
|
 |
|
 |
01/27/2012 |
|
01/30/2012 Discussion of Management and Personnel Issues (Closed – Ex. 2 and 6) – Full Written Explanation |
|
|
|
 |
01/26/2012 |
SECY-12-0012 |
Weekly Information Report - Week Ending January 20, 2012 |
 |
|
|
|
01/26/2012 |
|
02/28/2012 Briefing on the Threat Environment Assessment (Closed – Ex. 1) – Full Written Explanation |
|
|
|
 |
01/25/2012 |
SECY-12-0004 |
Final Rule—10 CFR Parts 2, 12, 51, 54, and 61 "Amendments to Adjudicatory Process Rules and Related Requirements" (RIN 3150-AI43) |
 |
|
|
|
01/25/2012 |
SECY-12-0003 |
Draft Final Policy Statement on Volume Reduction and Low-Level Radioactive Waste Management |
 |
|
|
|
01/23/2012 |
|
Letter from Chairman Gregory B. Jaczko to Co-Chairmen Lee H. Hamilton and Brent Scowcroft, Blue Ribbon Commission (BRC) on America’s Nuclear Future, inviting them to meet with the Commission at a public meeting on the final report of the BRC on America’s Nuclear Future. |
 |
|
|
|
01/20/2012 |
SECY-12-0007 |
Weekly Information Report - Week Ending January 13, 2012 |
 |
|
|
|
01/19/2012 |
COMWDM-11-0002/
COMGEA-11-0002 |
Revision to 10 CFR Part 61 |
 |
 |
 |
|
01/18/2012 |
|
01/11/12 Commission Meeting: Briefing on Proposed Rule to Revise the Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (Part 51) |
|
|
|
 |
01/17/2012 |
SECY-11-0184 |
Security Regulatory Framework for Certifying, Approving, and Licensing Small Modular Nuclear Reactors (M110329) |
 |
|
|
|
01/13/2012 |
SECY-12-0005 |
Weekly Information Report - Week Ending January 6, 2012 |
 |
|
|
|
01/13/2012 |
SECY-11-0182 |
Annual Review of the Need for Rulemaking or Regulatory Guidance on Extended Storage of Low-Level Radioactive Waste |
 |
|
|
|
01/12/2012 |
SECY-11-0181 |
Decommissioning Funding Assurance for Small Modular Nuclear Reactors |
 |
|
|
|
01/12/2012 |
|
Letter from Chairman Gregory B. Jaczko to Congressman Edward J. Markey regarding NRC requirements for addressing potential concrete degradation at nuclear power plants |
 |
|
|
|
01/09/2012 |
SECY-11-0178 |
Insurance and Liability Regulatory Requirements for Small Modular Reactor Facilities |
 |
|
|
|
01/06/2012 |
SECY-11-0140 |
Enhancements to the Fuel Cycle Oversight Process |
|
 |
 |
|
01/06/2012 |
SECY-12-0002 |
Weekly Information Report - Week Ending December 30, 2011 |
 |
|
|
|
01/06/2012 |
SECY-12-0001 |
Weekly Information Report - Week Ending December 23, 2011 |
 |
|
|
|
01/06/2012 |
|
Staff Requirements Memorandum: 12/13/11 Briefing on NFPA 805 Fire Protection |
|
 |
|
|
01/05/2012 |
|
01/11/2012 Meeting Agenda: Briefing on Proposed Rule to Revise the Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (Part 51) |
|
|
|
 |
01/05/2012 |
|
01/11/2012 Meeting Slides: Briefing on Proposed Rule to Revise the Environmental Review for Renewal of Nuclear Power Plant Operating Licenses (Part 51) |
|
|
|
 |
01/05/2012 |
|
01/11/2012 Discussion of Management and Personnel Issues (Closed – Ex. 2 and 6) – Full Written Explanation |
|
|
|
 |
01/03/2012 |
SECY-11-0175 |
Proposed Rule: Amendments to Material Control and Accounting Regulations (RIN 3150-AI61) |
 |
|
|
|