Home > NRC Library > ADAMS Public Documents
SECY-12-0157 - Consideration of Additional Requirements for Containment Venting Systems for Boiling Water Reactors with Mark I and Mark II Containments (REDACTED VERSION)
Accession Number: ML12345A030
Date Released: Friday, December 7, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12325A704 - SECY-12-0157 - Consideration Of Additional Requirements For Containment Venting Systems For Boiling Water Reactors With Mark I And Mark II Containments (REDACTED VERSION) (12 page(s), 11/26/2012)
- ML12326A343 - SECY-12-0157 - Enclosure 1 - Evaluation Of Options (42 page(s), 11/26/2012)
- ML12326A344 - SECY-12-0157 - Enclosure 2 - Boiling Water Reactor Mark I And Mark II Containment Regulatory History (22 page(s), 11/26/2012)
- ML12325A047 - SECY-12-0157 - Enclosure 3 - Foreign Experience (23 page(s), 11/26/2012)
- ML12326A338 - SECY-12-0157 - Enclosure 5 - Technical Analysis (3 page(s), 11/26/2012)
- ML12325A048 - SECY-12-0157 - Enclosure 4 - Boiling Water Reactor Mark I And II Containment Performance During Severe Accidents (24 page(s), 11/26/2012)
- ML12325A693 - SECY-12-0157 - Enclosure 5A - MELCOR Accident Analysis (63 page(s), 11/26/2012)
- ML12326A328 - SECY-12-0157 -Enclosure 5B - MACCS Consequence Analysis (54 page(s), 11/26/2012)
- ML12326A329 - SECY-12-0157 - Enclosure 5c - Probabilistic Risk Evaluation (27 page(s), 11/26/2012)
- ML12325A049 - SECY-12-0157 - Enclosure 6 - Stakeholder Interactions (11 page(s), 11/26/2012)
- ML12326A675 - SECY-12-0157 - Enclosure 7 - Draft Proposed Order: Option 2 - Severe Accident Capable Vents or Option 4 - Pursue Development Of A Severe Accident Confinement Strategy For BWRS With Mark I And Mark II Containments (18 page(s), 11/26/2012)