Advisory Committee on Reactor Safeguards (ACRS) 2024 Letter Reports
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date |
Title |
Response |
07/17/2024 |
Safety Evaluation Of The Kairos Non-Power Reactor Hermes 2 Construction Permit Application |
|
06/28/2024 |
Principal Design Criteria For The Natrium Advanced Reactor |
|
06/27/2024 |
Draft Safety Evaluation Of Terrapower’s Natrium Topical Report On Fuel And Control Assembly Qualification |
|
05/24/2024 |
Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs |
|
05/24/2024 |
Review of Computer Code Development and Validation for Non-Light-Water Reactors |
|
05/16/2024 |
Report on the Safety Aspects of the Subsequent License Renewal Application Review of Monticello Nuclear Generating Plant, Unit 1 |
|
05/14/2024 |
Report on the Safety Aspects of the License Renewal Application Review of Comanche Peak Nuclear Power Plant Units 1 & 2 |
|
03/22/2024 |
Revision 9 of Standard Review Plan Branch Technical Position 7-19, "Guidance for Evaluation of Defense in Depth and Diversity to Address Common-Cause Failure Due to Latent Defects in Digital Safety Systems" |
|
02/26/2024 |
10 CFR Part 61 – Revisions to Low-Level Radioactive Waste Disposal Requirements |
|