Date |
Title |
02/12/1998 | Potential Revision To 10 CFR 50.65 (a) (3) Of The Maintenance Rule To Require Licensees To Perform Safety Assessments |
02/12/1998 | Proposed Generic Letter, "Guidance On The Storage, Preservation, and Safekeeping of Quality Assurance Records in Electronic Media" |
02/12/1998 | Final Rulemaking, "Physical Protection For Spent Nuclear Fuel and High Level Radioactive Waste" (10 CFR Parts 60, 72, 73, 74, And 75) |
02/19/1998 | Interim Letter On The Safety Aspects Of The Westinghouse Electric Company Application For Certification Of The AP600 Plant Design |
02/24/1998 | Letter To Congress - Nuclear Safety Research - A Report to The U.S. House of Representatives and the U.S. Senate |
03/11/1998 | ACRS Comments On Draft Paper On Risk-Informed Performance-Based Regulation |
03/12/1998 | Proposed Final Standard Review Plan Sections and Regulatory Guides for Risk-Informed, Performance-Based Regulation For Inservice Testing, Graded Quality Assurance, and Technical Specifications |
03/12/1998 | Risk-Ranking Approach For Motor-Operated Valves |
03/13/1998 | Proposed Improvements To The Senior Management Meeting Process |
03/16/1998 | SECY-98-001, Mechanism For Addressing Generic Safety Issues |
04/09/1998 | The Safety Aspects of the Westinghouse Electric Company Application for Certification of the AP600 Plant Design Interim Letter 2 |
04/09/1998 | Plans To Increase Performance-Based Approaches In Regulatory Activities |
04/09/1998 | Proposed Rulemaking: Changes To Paragraph (h) Of 10 CFR 50.55a, "Codes and Standards" |
04/09/1998 | Draft Commission Paper, "Status Of The Environmental Qualification Task Action Plan" |
04/09/1998 | Proposed Final Generic Letter, "Year 2000 Readiness Of Computer Systems At Nuclear Power Plants" |
05/08/1998 | Proposed Final Amendment to CFR Part 55, "Initial Licensed Operator Examination Requirements" |
05/08/1998 | Proposed Generic Letter, "Modification Of The NRC Staff's Recommendations For The Post-Accident Sampling System |
05/11/1998 | Elevation of CDF to a Fundamental Safety Goal and Possible Revision of the Commission's Safety Goal Policy Statement |
05/12/1998 | Proposed Human Performance Plan and Proposed Final Standard Review Plan Section and Regulatory Guide For Risk-Informed Inservice Inspection of Piping |
06/09/1998 | NRC Participation In The CABRI Reactor Fuels Research Program |
06/09/1998 | Safety Evaluation Report On Electric Power Research Institute Topical Report, TR-107330, Final Report, "Generic Requirements Specification For Qualifying A Commercially Available PLC For Safety-Related Applications In Nuclear Power Plants," |
06/09/1998 | Draft Advance Notice of Proposed Rulemaking Regarding Amending 10 CFR 50.72, "Immediate Notification Requirements For Operating Nuclear Power Reactors, " And 10 CFR 50.73, "Licensee Event Report System" |
06/12/1998 | Proposed Final Draft Of The NRC's Human Performance Plan |
06/12/1998 | Proposed Final Standard Review Plan Section 3.9.8. And Regulatory Guide 1.178 For Risk-Informed Inservice Inspection Of Piping |
06/15/1998 | NRC Reactor Fuels Research Program |
06/15/1998 | The Safety Aspects Of The Westinghouse Electric Company Application For Certification Of The AP600 Plant Design - Interim Letter 3 |
06/16/1998 | Review Of Secy-98-076, "Core Research Capabilities" |
07/16/1998 | Proposed Revisions To 10 CFR 50.59 (Changes, Tests And Experiments) |
07/20/1998 | Draft Supplement 1 To NUREG 1552, "Fire Barrier Penetration Seals In Nuclear Power Plants" |
07/21/1998 | Proposed Final Safety Evaluation Of The BWR Vessel And Internals Project, BWR Pressure Vessel Shell Weld Inspection Recommendations (BWRVIP-05) Report |
07/22/1998 | Draft Regulatory Guide DG-4005, "Preparation Of Supplemental Environmental Reports For Applications To Renew Nuclear Power Plant Operating Licenses" |
07/22/1998 | Proposed Revision to 10 CFR 50.65 (a) (3) Of The Maintenance Rule To Require Licensees To Perform Safety Assessments |
07/23/1998 | Report On The Safety Aspects Of The Westinghouse Electric Company Application For Certification Of The AP600 Passive Plant Design |
07/24/1998 | General Electric Nuclear Energy Extended Power Uprate Program And Monticello Nuclear Generating Plant Power Level Increase Request |
09/09/1998 | Proposed Final Rulemaking: Changes To Paragragh (h) Of 10 CFR Part 50.55a, "Codes And Standards" |
09/14/1998 | Emergency Core Cooling System Strainer Blockage |
09/15/1998 | Application For Power Level Increase For Edwin I. Hatch Nuclear Power Plant Units 1 and 2 |
09/30/1998 | Impact Of Probabilistic Risk Assessment Results And Insights On The Regulatory System |
10/06/1998 | Proposed Final Amendment To CFR Part 55, "Initial Licensed Operator Examination Requirements" |
10/06/1998 | Proposed Rule - "Changes To Requirements For Environmental Review For Review For Renewal Of Nuclear Power Plant Operating Licenses (10 CFR Part 51)" |
10/07/1998 | Proposed Final Revisions To Regulatory Guide (RG) 1.84 (Design And Fabrication Code Case Acceptability), RG 1.85 (Materials Code Case Acceptability, And RG 1.147 (Inservice Inspection Code Case Acceptability) |
10/08/1998 | Proposed Final Regulatory Guide DG-1029, Revision 1.7, "Guidelines For Evaluating Electromagnetic And Radio-Frequency Interference in Safety-Related Instrumentation And Control Systems" |
10/14/1998 | Risk-Informed Pilot Application For Hydrogen Monitoring At Arkansas Nuclear One, Units 1 & 2 |
10/16/1998 | Proposed Priority Rankings Of Generic Safety Issues: Tenth Group |
10/20/1998 | The Nuclear Energy Institute's Petition For Rulemaking to Amend Paragraph (a) of 10 CFR 50.54, Conditions Of Licenses |
11/12/1998 | Proposed Amendments To 10 CFR 50.47; Granting Of Petitions For Rulemaking (PRM 50-63 And 50-63A) Relating To A Re-Evaluation Of Policy On the Use Of Potassium Iodide (ki) After A Severe Accident At A Nuclear Power Plant |
11/12/1998 | Proposed Final Generic Letter, "Laboratory Testing Of Nuclear-Grade Activated Charcoal" |
11/13/1998 | Secy-98-253, "Applicability Of Plant-Specific Backfit Requirements To Plants Undergoing Decommissioning" |
11/13/1998 | Draft Commission Paper Concerning Initiation Of Rulemaking - Revision Of 10 CFR 55.31(a)(5) And 55.45(b) Regarding The Use Of Simulators In Operator Licensing |
11/13/1998 | Proposed Inspection Procedure 35XXX, "Graded Quality Assurance" |
11/17/1998 | Proposed Revision To The Enforcement Policy |
11/19/1998 | Proposed Rule On Use Of Alternative Source Term At Operating Reactors |
11/20/1998 | Safety Evaluation Report Related To Westinghouse Owners Group Application Of Risk-Informed Methods To Inservice Inspection of Piping, Topical Report (WCAP-14572, Revision 1) |
11/23/1998 | Reprioritization And Proposed Resolution Of Generic Safety Issue-171, "Engineered Safety Features Failure From Loss-Of-Offsite-Power Subsequent To A Loss-Of-Coolant Accident" |
11/23/1998 | Options For Incorporating Risk Insights Into the 10 CFR 50.59 Process |
12/14/1998 | Proposed Commission Paper Concerning Options For Risk-Informed Revisions To 10 CFR Part 50 - "Domestic Licensing Of Productin And Utilization Facilities" |
12/14/1998 | Rulemaking Plan - Protection Against Discrete Radioactive Particle (DRP) Exposures (10 CFR Part 20) |
12/16/1998 | Proposed Improvements To The NRC Inspection And Assessment Programs - Interim Report |