The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

ACRS 1995 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
01/19/1995 General Electric Nuclear Energy Test And Analysis Program For The Simplified Boiling Water Reactor Design
01/24/1995 Letter to Honorable Newt Gingrich - Speaker of the United States, House of Representatives
02/15/1995 Reactor Water Cleanup System Line Break For Operating BWRS
02/16/1995 Proposed Final Revision 3 To Regulatory Guide 1.118, "Periodic Testing Of Electric Power And Protection Systems"
02/17/1995 Proposed Final Amendment To 10 CFR 50.55a To Incorporate By Reference Subsection IWE and IWL, Section XI, Division 1, Of The ASME Boiler And Pressure Vessel Code
03/14/1995 Proposed Amendment To The Nuclear Power Plant License Renewal Rule (10 CFR Part 54)
03/17/1995 Proposed Rulemaking- Revision To 10 CFR Parts 2, 50, And 51 Related To Decommissioning Of Nuclear Power Reactors
04/12/1995 NRC Test And Analysis Program In Support Of AP600 Advanced Light Water Passive Plant Design Review
04/12/1995 Proposed Rulemaking On Reporting Reliability And Availability Information For Risk-Significant Systems And Equipment
04/13/1995 Proposed Final Rule Change To 10 CFR 50.36, Technical Specifications
04/13/1995 Proposed Amendments To 10 CFR Part 73 Concerning Security Requirements Associated With Containment Access Control
04/14/1995 Proposed Revision 1 To Regulatory Guide 1.152, "Criteria For Digital Computers In Safety Systems In Nuclear Power Plants"
05/10/1995 Regulatory Reform Initiatives And National Performance Review Phase II
05/10/1995 Proposed NRC Generic Letter Regarding Inadequate Testing Of Safety-Related Logic Circuits
05/10/1995 Proposed Rule Changes To 10 CFR Section 50.55a, "Codes and Standards"
05/11/1995 Proposed Supplement 2 To NUREG-0654 Concerning Criteria for Emergency Planning In An Early Site Permit Application
05/15/1995 Proposed Final Generic Letter 95-XX, "Voltage-Based Repair Criteria For Westinghouse Steam Generator Tubes"
05/17/1995 Review Of Best-Estimate Models For Evaluation Of Emergency Core Cooling System Performance
06/15/1995 Proposed Commission Paper On Staff Positions On Technical Issues Pertaining To The Westinghouse AP600 Standardized Passive Reactor Design
06/16/1995 Proposed Final Policy Statement On The Use Of Probabilistic Risk Assessment Methods In Nuclear Regulatory Activities
06/16/1995 Proposed Final Revisions To Appendix J Of 10 CFR Part 50, "Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors"
06/16/1995 Proposed Final Rule And Regulatory Guide For Fracture Toughness Requirements For Light Water Reactor Pressure Vessels
06/20/1995 Draft Regulatory Guide 1040, "Time Response Design Criteria For Safety-Related Operator Actions"
07/18/1995 Comments By Individual Members And An ACRS Consultant
07/20/1995 Proposed NRC Generic Letter 95-XX Titled "Pressure Locking And Thermal Binding Of Safety-Related Power-Operated Gate Valves"
07/20/1995 Health Effects Valuation
07/20/1995 Resolution Of Generic Safety Issue 83, "Control Room Habitability"
07/20/1995 Proposed Priority Rankings Of Generic Issues: Ninth Group
07/20/1995 Proposed NRC Bulletin Titled "Potential Plugging Of Emergency Core Cooling Suction Strainers By Debris In Boiling Water Reactors" And Proposed Revision 2 Of Regulatory Guide 1.82 "Water Sources For Long-Term Recirculation Cooling Following A Loss-Of-Coolant Accident"
07/20/1995 Proposed NRC Generic Letter Titled "Relocation Of Selected Technical Specifications Requirements Related To Instrumentation"
09/12/1995 Proposed Resolution Of Generic Issue 24, "Automatic ECCS Switchover To Recirculation"
09/13/1995 Health Effects Valuation
09/13/1995 Proposed Revision 1 To Regulatory Guide 1.153, "Criteria For Safety Systems" (Draft Regulatory Guide DG-1042)
09/15/1995 Development Of Improved Nondestructive Examination (NDE) Techniques
09/15/1995 The Nuclear Energy Institute Petition For Rulemaking to Amend 10 CFR 50.48, "Fire Protection"
10/13/1995 National Academy Of Sciences/National Research Council Study On "Digital Instrumentation And Control Systems In Nuclear Power Plants, Safety And Reliability Issues" -Phase 1
10/13/1995 Proposed Final Revision 1 To Regulatory Guide 1.152, "Criteria For Digital Computers In Safety Systems Of Nuclear Power Plants"
10/16/1995 Fatigue Action Plan
11/08/1995 Application For Operating License For Watts Bar Nuclear Plant Unit 1
11/08/1995 Allegations Concerning The Application For Operating License For Watts Bar Nuclear Plant Unit 1
11/13/1995 NUREG-0700, Revision 1, "Human-System Interface Design Review Guideline"
11/14/1995 Proposed Modifications To The Boiling Water Reactor Owners Group Emergency Procedure Guidelines To Address Reactor Core Instabilities
11/14/1995 Proposed Final Regulatory Guide 1.164, "Time Response Design Criteria For Safety-Related Operator Actions," To Resolve Generic Safety Issue B-17
12/13/1995 Proposed Final Generic Letter, "Testing Of Safety-Related Logic Circuits"

Page Last Reviewed/Updated Thursday, July 17, 2025