Date |
Title |
01/15/1992 |
Proposed 10 CFR Part 50 And Part 100 (Nonseismic) Rule Changes And Proposed Update Of Source Term |
02/12/1992 |
Letter to The Honorable J. Danforth Quayle, President of the United States Senate |
02/14/1992 |
Proposed Revisions To 10 CFR Parts 50 And 100 And Proposed Regulatory Guides Relating To Seismic Siting And Earthquake Engineering Criteria |
02/14/1992 |
Use Of Design Acceptance Criteria During 10 CFR Part 52 Design Certification Reviews |
02/14/1992 |
Trends In Core-Melt Probability |
03/10/1992 |
Requirements For Full-Height, Full-Pressure Integral System Testing Of The Westinghouse AP600 Passive Plant Design |
03/11/1992 |
Proposed Priority Rankings Of Generic Issues: Seventh Group |
04/06/1992 |
Full-Height, Full Pressure Integral System Testing For The Westinghouse AP600 Passive Plant Design |
04/09/1992 |
Final Rule To Amend 10 CFR 50.55a - Codes And Standards |
04/09/1992 |
Evaluation Of The Risks During Shutdown And Low-Power Operations For U.S. Nuclear Power Plants |
04/09/1992 |
NRC Staff Probabilistic Risk Assessment Working Group Program Plan |
04/13/1992 |
Review Of The Draft Safety Evaluation Reports On The GE Advanced Boiling Water Reactor Design |
05/13/1992 |
Definition Of A Large Release For Use With The Safety Goal Policy |
05/13/1992 |
Issues Pertaining To Evolutionary And Passive Light Water Reactors And Their Relationship To Current Regulatory Requirements |
05/14/1992 |
Advance Notice Of Proposed Rulemaking On Severe Accident Plant Performance Criteria For Future LWRS |
05/19/1992 |
Reliability Of Emergency AC Power At Nuclear Power Plants |
06/10/1992 |
Proposed Amendments To Fitness-For-Duty Rule (0 CFR Part 26) |
06/10/1992 |
Testing And Analysis Programs In Support Of The Simplified Boiling Water Reactor Design Certification |
06/10/1992 |
Regulatory Guides 8.7, Revision 1, And 8N6 To Implement The Revised 10 CFR Part 20 |
06/11/1992 |
Individual Plant Examination And Accident Management Programs |
06/12/1992 |
Implementation Of The Safety Goal Policy |
06/16/1992 |
Interim Report On The Use Of Design Acceptance Criteria In The Certification Of The GE Nuclear Energy Advanced Boiling Water Reactor Design |
07/17/1992 |
Integral System And Separate Effects Testing In Support Of The Westinghouse AP600 Plant Design Certification |
08/11/1992 |
Elimination Of Requirements Marginal To Safety |
08/12/1992 |
Inspections, Tests, Analyses, And Acceptance Criteria Program For The GE ABWR Design |
08/12/1992 |
ACRS Plan For Reviewing The Application For Certification Of The GE Advanced Boiling Water Reactor Design |
08/12/1992 |
Proposed Policy Statement On Conversion To The Metric System |
08/14/1992 |
Supplement 1 To Generic Letter 83-28, " Required Actions Based On Generic Implications Of Salem ATWS Events" |
08/14/1992 |
Proposed Revision 3 To Regulatory Guide 1.101, "Emergency Planning And Preparedness For Nuclear Power Reactors" |
08/14/1992 |
Proposed Resolution Of Generic Safety Issue 106, "Piping And The Use Of Highly Combustible Gases In Vital Areas" |
08/14/1992 |
Proposed Resolution Of Generic Issue 151, "Reliability Of ATWS Recirculation Pump Trip In Boiling Water Reactors" |
08/17/1992 |
Issues Pertaining To Evolutionary And Passive Light Water Reactors And Their Relationship To Current Regulatory Requirements |
08/17/1992 |
Proposed Regulatory Guide And Interim Standard Review Plan For License Renewal And A Related Branch Technical Position On Fatigue Evaluation Procedures |
08/18/1992 |
Severe Accident Research Program Plan |
08/18/1992 |
Electric Power Research Institute Advanced Light Water Reactor Utility Requirements Document -- Volume II, Evolutionary Plants |
09/15/1992 |
NRC Staff's Proposed Resolution Of Issues Identified In Its Evaluation Of Shutdown And Low-Power Operations |
09/16/1992 |
Digital Instrumentation And Control System Reliability |
09/16/1992 |
Draft Commission Paper, "Design Certification And Licensing Policy Issues Pertaining To Passive And Evolutionary Advanced Light Water Reactor Designs" |
09/17/1992 |
General Electric Nuclear Energy Power Uprate Program/FERMI, Unit 2 Power Increase Request |
10/15/1992 |
Proposed Guidance For Implementation Of The Maintenance Rule, 10 CFR 50.65 |
10/16/1992 |
SECY-92-287, "Form And Content For A Design Certification Rule" |
10/16/1992 |
Second Interim Report On The Use Of The Design Acceptance Criteria Process In The Certification Of The General Electric Nuclear Energy Advanced Boiling Water Reactor Design |
10/19/1992 |
Proposed Amendments To 10 CFR Part 55 On Renewal Of Nuclear Power Plant Operator Licenses And Requalification |
10/22/1992 |
Proposed Branch Technical Position On Environmental Qualification Of Electrical Equipment For License Renewal |
11/12/1992 |
Environmental Qualification For Digital Instrumentation And Control Systems |
11/12/1992 |
Revised Guidelines For Prioritization Of Generic Safety Issues |
11/12/1992 |
Revised Regulatory Analysis Guidelines |
11/16/1992 |
Risk Based Regulation |
12/17/1992 |
NRC Staff Response To The Petition Submitted By Richard Grill For Rulemaking On Electrical Transients, PRM-50-56 |
12/18/1992 |
Resolution Of Generic Safety Issue B-56, "Diesel Generator Reliability" |