ACRS 1992 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
01/15/1992 Proposed 10 CFR Part 50 And Part 100 (Nonseismic) Rule Changes And Proposed Update Of Source Term
02/12/1992 Letter to The Honorable J. Danforth Quayle, President of the United States Senate
02/14/1992 Proposed Revisions To 10 CFR Parts 50 And 100 And Proposed Regulatory Guides Relating To Seismic Siting And Earthquake Engineering Criteria
02/14/1992 Use Of Design Acceptance Criteria During 10 CFR Part 52 Design Certification Reviews
02/14/1992 Trends In Core-Melt Probability
03/10/1992 Requirements For Full-Height, Full-Pressure Integral System Testing Of The Westinghouse AP600 Passive Plant Design
03/11/1992 Proposed Priority Rankings Of Generic Issues: Seventh Group
04/06/1992 Full-Height, Full Pressure Integral System Testing For The Westinghouse AP600 Passive Plant Design
04/09/1992 Final Rule To Amend 10 CFR 50.55a - Codes And Standards
04/09/1992 Evaluation Of The Risks During Shutdown And Low-Power Operations For U.S. Nuclear Power Plants
04/09/1992 NRC Staff Probabilistic Risk Assessment Working Group Program Plan
04/13/1992 Review Of The Draft Safety Evaluation Reports On The GE Advanced Boiling Water Reactor Design
05/13/1992 Definition Of A Large Release For Use With The Safety Goal Policy
05/13/1992 Issues Pertaining To Evolutionary And Passive Light Water Reactors And Their Relationship To Current Regulatory Requirements
05/14/1992 Advance Notice Of Proposed Rulemaking On Severe Accident Plant Performance Criteria For Future LWRS
05/19/1992 Reliability Of Emergency AC Power At Nuclear Power Plants
06/10/1992 Proposed Amendments To Fitness-For-Duty Rule (0 CFR Part 26)
06/10/1992 Testing And Analysis Programs In Support Of The Simplified Boiling Water Reactor Design Certification
06/10/1992 Regulatory Guides 8.7, Revision 1, And 8N6 To Implement The Revised 10 CFR Part 20
06/11/1992 Individual Plant Examination And Accident Management Programs
06/12/1992 Implementation Of The Safety Goal Policy
06/16/1992 Interim Report On The Use Of Design Acceptance Criteria In The Certification Of The GE Nuclear Energy Advanced Boiling Water Reactor Design
07/17/1992 Integral System And Separate Effects Testing In Support Of The Westinghouse AP600 Plant Design Certification
08/11/1992 Elimination Of Requirements Marginal To Safety
08/12/1992 Inspections, Tests, Analyses, And Acceptance Criteria Program For The GE ABWR Design
08/12/1992 ACRS Plan For Reviewing The Application For Certification Of The GE Advanced Boiling Water Reactor Design
08/12/1992 Proposed Policy Statement On Conversion To The Metric System
08/14/1992 Supplement 1 To Generic Letter 83-28, " Required Actions Based On Generic Implications Of Salem ATWS Events"
08/14/1992 Proposed Revision 3 To Regulatory Guide 1.101, "Emergency Planning And Preparedness For Nuclear Power Reactors"
08/14/1992 Proposed Resolution Of Generic Safety Issue 106, "Piping And The Use Of Highly Combustible Gases In Vital Areas"
08/14/1992 Proposed Resolution Of Generic Issue 151, "Reliability Of ATWS Recirculation Pump Trip In Boiling Water Reactors"
08/17/1992 Issues Pertaining To Evolutionary And Passive Light Water Reactors And Their Relationship To Current Regulatory Requirements
08/17/1992 Proposed Regulatory Guide And Interim Standard Review Plan For License Renewal And A Related Branch Technical Position On Fatigue Evaluation Procedures
08/18/1992 Severe Accident Research Program Plan
08/18/1992 Electric Power Research Institute Advanced Light Water Reactor Utility Requirements Document -- Volume II, Evolutionary Plants
09/15/1992 NRC Staff's Proposed Resolution Of Issues Identified In Its Evaluation Of Shutdown And Low-Power Operations
09/16/1992 Digital Instrumentation And Control System Reliability
09/16/1992 Draft Commission Paper, "Design Certification And Licensing Policy Issues Pertaining To Passive And Evolutionary Advanced Light Water Reactor Designs"
09/17/1992 General Electric Nuclear Energy Power Uprate Program/FERMI, Unit 2 Power Increase Request
10/15/1992 Proposed Guidance For Implementation Of The Maintenance Rule, 10 CFR 50.65
10/16/1992 SECY-92-287, "Form And Content For A Design Certification Rule"
10/16/1992 Second Interim Report On The Use Of The Design Acceptance Criteria Process In The Certification Of The General Electric Nuclear Energy Advanced Boiling Water Reactor Design
10/19/1992 Proposed Amendments To 10 CFR Part 55 On Renewal Of Nuclear Power Plant Operator Licenses And Requalification
10/22/1992 Proposed Branch Technical Position On Environmental Qualification Of Electrical Equipment For License Renewal
11/12/1992 Environmental Qualification For Digital Instrumentation And Control Systems
11/12/1992 Revised Guidelines For Prioritization Of Generic Safety Issues
11/12/1992 Revised Regulatory Analysis Guidelines
11/16/1992 Risk Based Regulation
12/17/1992 NRC Staff Response To The Petition Submitted By Richard Grill For Rulemaking On Electrical Transients, PRM-50-56
12/18/1992 Resolution Of Generic Safety Issue B-56, "Diesel Generator Reliability"

Page Last Reviewed/Updated Thursday, July 17, 2025