Date |
Title |
01/18/1990 |
Resolution Of The Interfacing Systems LOCA Issue |
02/15/1990 |
Proposed Power Level Increase For Indian Point Nuclear Generating Station Unit 2 |
02/15/1990 |
ACRS Review And Evaluation Of Nuclear Power Plant Operating Experience |
02/15/1990 |
Coherence In the Regulatory Process |
02/15/1990 |
Letter to Honorable J. Danforth Quayle, President of the United States Senate |
03/13/1990 |
Containment Performance Improvement Program - Proposed Recommendations For Mark II, Mark III, Ice Condenser, And Dry Containments |
04/11/1990 |
Proposed Rule On Nuclear Power Plant License Renewal |
04/11/1990 |
NRC Safety Research Program Budget |
04/24/1990 |
Severe Accident Research Program |
04/26/1990 |
Evolutionary Light Water Reactor Certification Issues And Their Relationship To Current Regulatory Requirements |
06/12/1990 |
Proposed Rule To Implement An Emergency Response Data System |
06/12/1990 |
Generic Issue-84, Combustion Engineering Plants Without Power Operated Relief Valves |
06/12/1990 |
Modified Enforcement Policy For Hot Particle Exposures Incorporating The Recommendations Of NCRP Report No.106 |
06/13/1990 |
Draft Study On Source Term Update And Decoupling Siting From Design |
08/14/1990 |
Proposed Resolution Of Generic Safety Issue B-56, "Diesel Generator Reliability" |
08/14/1990 |
Level of Detail Required For Design Certification Under Part 52 |
08/16/1990 |
NRC Research On Organizational Factors |
09/11/1990 |
Implementation Of The Safety Goal Policy |
09/11/1990 |
Proposed Priority Rankings Of Generic Issues: Sixth Group |
09/12/1990 |
Reevaluation Of The SALP Program |
09/12/1990 |
Yankee Rowe Reactor Pressure Vessel Integrity |
10/11/1990 |
Draft Implementation Documents For The Proposed License Renewal Rule |
10/11/1990 |
NRC Computer Codes And Their Documentation |
10/12/1990 |
Letter to Honorable Kenneth M. Carr, Chairman of U.S. Nuclear Regulatory Commission |
11/14/1990 |
SECY-90-353, Licensing Review Basis Document For the Combustion Engineering, INC. System 80+ Evolutionary Light Water Reactor |
11/15/1990 |
Review Of NUREG-1150, "Severe Accident Risks: An Assessment For Five U.S. Nuclear Power Plants" |
12/10/1990 |
SECY-90-377, "Requirements For Design Certification Under 10 CFR Part 52" |
12/11/1990 |
Full-Term Operating License For The Dresden Nuclear Power Station, Unit 2 |
12/11/1990 |
Full-Term Operating License For The Palisades Nuclear Plant |
12/12/1990 |
Westinghouse's Application For Preliminary Design Approval For The RESAR SP/90 Design |