ACRS 1989 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
01/19/1989 Mark I Containment Performance Improvement Program
01/19/1989 Resolution Of Generic Issue 43, "Air Systems Reliability"
01/19/1989 Draft Final Rule On Standardization And Licensing Reform, 10 CFR Part 52, "Early Site Permits; Standard Design Certifications; And Combined Licenses For Nuclear Power Plants"
01/19/1989 Code Scaling, Applicability, And Uncertainty (CSAU) Methodology For Determination Of Uncertainty Associated With the Use Of Realistic ECCS Evaluation Models
01/19/1989 Safety Evaluation Report For The Sodium Advanced Fast Reactor (SAFR) Design
01/23/1989 NUREG-1150: Resolution Of ACRS Comments
02/15/1989 Proposed Policy Statement On Additional Applications Of Leak-Before-Break Technology (SECY-88-325)
02/15/1989 Final Rule On Standardization And Licensing Reform, 10 CFR Part 52 , "Early Site Permits; Standard Design Certifications; And Combined Licenses For Nuclear Power Plants"
02/16/1989 Proposed Resolution Of Generic Issues 70, "Power Operated Relief Valve And Block Valve Reliability," And 94, "Additional Low-Temperature Overpressure Protection For LWRs"
02/16/1989 Further ACRS Comment On Proposed Resolution Of Generic Issue 99, "Improved Reliability Of RHR Capability In PWRs"
02/16/1989 Further ACRS Comments On Implementation Of The Safety Goal Policy
02/17/1989 Letter to Honorable J. Danforth Quayle, President of the United States Senate
03/14/1989 Review Of The Peach Bottom Atomic Power Station Restart
03/14/1989 Additional Applications Of Leak-Before-Break Technology
03/15/1989 Proposed Severe Accident Research Program Plan
03/15/1989 Containment Design Criteria
04/11/1989 Proposed Final Rulemaking Related To Maintenance Of Nuclear Power Plants
04/11/1989 Proposed Amendment To 10 CFR 50.60, "Fracture Toughness Requirements For Protection Against Pressurized Thermal Shock Events"
04/11/1989 Proposed Resolution Of Generic Issue 82, "Beyond Design Basis Accidents In Spent Fuel Pools"
04/11/1989 Proposed Resolution Of Generic Issue 101, "BWR Water Level Redundancy"
04/11/1989 Proposed Final Resolution Of Generic Safety Issue 103, "Design For Probable Maximum Precipitation"
04/11/1989 Proposed Resolution of Generic Issue 115, "Enhancement Of Reliability Of Westinghouse Solid State Protection Systems"
04/13/1989 Letter From James R. Sutton Dated March 23, 1989 Regarding Three Mile Island Warning Siren
04/17/1989 Integrated Approach On Regulatory Matters
05/09/1989 NUREG-1150, "Severe Accident Risks: An Assessment For Five U.S. Nuclear Power Plants"
05/09/1989 NRC's Human Factors Programs And Initiatives
05/09/1989 Generic Letter On Safety-Related Motor-Operated Valve Testing And Surveillance
05/09/1989 Generic Letter Related To Occupational Radiation Exposure Of Skin From Hot Particles
05/11/1989 Operating License Application For Limerick Generating Station, Unit 2
06/13/1989 USI A-17, "Systems Interactions In Nuclear Power Plants"
06/14/1989 Reliability And Diversity
06/14/1989 Boiling Water Reactor Core Power Stability
06/14/1989 Proposed Generic Letter Regarding Service Water System Problems Affecting Safety-Related Equipment
06/14/1989 Proposed Resolution Of Generic Issue 128, "Electrical Power Reliability"
06/15/1989 Proposed Commission Policy Statement On Education For Senior Operators And Shift Supervisors At Nuclear Power Plants
06/15/1989 NRC Thermal-Hydraulic Research Program
07/18/1989 Proposed Resolution Of Unresolved Safety Issue A-40 , "Seismic Design Criteria"
07/18/1989 Proposed Staff Actions Regarding The Fire Risk Scoping Study (NUREG/CR-5088)
08/15/1989 Proposed Resolution Of Generic Issue 79, Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown
09/12/1989 Proposed Resolution Of Generic Issue A-29, "Nuclear Power Plant Design For Reduction Of Vulnerability To Industrial Sabotage"
09/12/1989 Electric Power Research Institute Advanced Light Water Reactor Requirements Document
09/13/1989 Emergency Plan For Full-Power Operation Of The Seabrook Station, Unit 1
10/11/1989 ACRS Comments On The Safety Goal Policy And Its Relationship To The Concept Of Adequate Protection
10/11/1989 Proposed Resolution Of Generic Issue 135, Steam Generator And Steam Line Overfill Issues
10/12/1989 Proposed Revised Policy Statement On The Maintenance Of Nuclear Power Plants
11/20/1989 The Relationship Of The Quantitative Safety Goal To The Concept Of Adequate Protection
11/20/1989 Draft Supplement No. 2 To Generic Letter 88-20, "Accident Management Strategies For Consideration In The Individual Plant Examination Process
11/20/1989 Proposed Resolution Of Generic Issue-87 (GI-87), "HPCI Steam Line Break Without Isolation"
11/20/1989 Letter to Honorable Kenneth M. Carr, Chairman of U.S. Nuclear Regulatory Commission
11/24/1989 Module 1 Of The Draft Safety Evaluation Report For The Advanced Boiling Water Reactor Design
11/24/1989 Coherence In The Regulatory Process
12/19/1989 Proposed Rule On Access Authorization At Nuclear Power Plants
12/20/1989 Proposed Amendment To 10 CFR Part 55, Operators' Licenses, To Include "Fitness-For-Duty" Penalties
12/21/1989 Coherence In The Regulatory Process

Page Last Reviewed/Updated Thursday, July 17, 2025