The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Advisory Committee on Reactor Safeguards (ACRS) 1989 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
01/19/1989 Mark I Containment Performance Improvement Program
01/19/1989 Resolution Of Generic Issue 43, "Air Systems Reliability"
01/19/1989 Draft Final Rule On Standardization And Licensing Reform, 10 CFR Part 52, "Early Site Permits; Standard Design Certifications; And Combined Licenses For Nuclear Power Plants"
01/19/1989 Code Scaling, Applicability, And Uncertainty (CSAU) Methodology For Determination Of Uncertainty Associated With the Use Of Realistic ECCS Evaluation Models
01/19/1989 Safety Evaluation Report For The Sodium Advanced Fast Reactor (SAFR) Design
01/23/1989 NUREG-1150: Resolution Of ACRS Comments
02/15/1989 Proposed Policy Statement On Additional Applications Of Leak-Before-Break Technology (SECY-88-325)
02/15/1989 Final Rule On Standardization And Licensing Reform, 10 CFR Part 52 , "Early Site Permits; Standard Design Certifications; And Combined Licenses For Nuclear Power Plants"
02/16/1989 Proposed Resolution Of Generic Issues 70, "Power Operated Relief Valve And Block Valve Reliability," And 94, "Additional Low-Temperature Overpressure Protection For LWRs"
02/16/1989 Further ACRS Comment On Proposed Resolution Of Generic Issue 99, "Improved Reliability Of RHR Capability In PWRs"
02/16/1989 Further ACRS Comments On Implementation Of The Safety Goal Policy
02/17/1989 Letter to Honorable J. Danforth Quayle, President of the United States Senate
03/14/1989 Review Of The Peach Bottom Atomic Power Station Restart
03/14/1989 Additional Applications Of Leak-Before-Break Technology
03/15/1989 Proposed Severe Accident Research Program Plan
03/15/1989 Containment Design Criteria
04/11/1989 Proposed Final Rulemaking Related To Maintenance Of Nuclear Power Plants
04/11/1989 Proposed Amendment To 10 CFR 50.60, "Fracture Toughness Requirements For Protection Against Pressurized Thermal Shock Events"
04/11/1989 Proposed Resolution Of Generic Issue 82, "Beyond Design Basis Accidents In Spent Fuel Pools"
04/11/1989 Proposed Resolution Of Generic Issue 101, "BWR Water Level Redundancy"
04/11/1989 Proposed Final Resolution Of Generic Safety Issue 103, "Design For Probable Maximum Precipitation"
04/11/1989 Proposed Resolution of Generic Issue 115, "Enhancement Of Reliability Of Westinghouse Solid State Protection Systems"
04/13/1989 Letter From James R. Sutton Dated March 23, 1989 Regarding Three Mile Island Warning Siren
04/17/1989 Integrated Approach On Regulatory Matters
05/09/1989 NUREG-1150, "Severe Accident Risks: An Assessment For Five U.S. Nuclear Power Plants"
05/09/1989 NRC's Human Factors Programs And Initiatives
05/09/1989 Generic Letter On Safety-Related Motor-Operated Valve Testing And Surveillance
05/09/1989 Generic Letter Related To Occupational Radiation Exposure Of Skin From Hot Particles
05/11/1989 Operating License Application For Limerick Generating Station, Unit 2
06/13/1989 USI A-17, "Systems Interactions In Nuclear Power Plants"
06/14/1989 Reliability And Diversity
06/14/1989 Boiling Water Reactor Core Power Stability
06/14/1989 Proposed Generic Letter Regarding Service Water System Problems Affecting Safety-Related Equipment
06/14/1989 Proposed Resolution Of Generic Issue 128, "Electrical Power Reliability"
06/15/1989 Proposed Commission Policy Statement On Education For Senior Operators And Shift Supervisors At Nuclear Power Plants
06/15/1989 NRC Thermal-Hydraulic Research Program
07/18/1989 Proposed Resolution Of Unresolved Safety Issue A-40 , "Seismic Design Criteria"
07/18/1989 Proposed Staff Actions Regarding The Fire Risk Scoping Study (NUREG/CR-5088)
08/15/1989 Proposed Resolution Of Generic Issue 79, Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown
09/12/1989 Proposed Resolution Of Generic Issue A-29, "Nuclear Power Plant Design For Reduction Of Vulnerability To Industrial Sabotage"
09/12/1989 Electric Power Research Institute Advanced Light Water Reactor Requirements Document
09/13/1989 Emergency Plan For Full-Power Operation Of The Seabrook Station, Unit 1
10/11/1989 ACRS Comments On The Safety Goal Policy And Its Relationship To The Concept Of Adequate Protection
10/11/1989 Proposed Resolution Of Generic Issue 135, Steam Generator And Steam Line Overfill Issues
10/12/1989 Proposed Revised Policy Statement On The Maintenance Of Nuclear Power Plants
11/20/1989 The Relationship Of The Quantitative Safety Goal To The Concept Of Adequate Protection
11/20/1989 Draft Supplement No. 2 To Generic Letter 88-20, "Accident Management Strategies For Consideration In The Individual Plant Examination Process
11/20/1989 Proposed Resolution Of Generic Issue-87 (GI-87), "HPCI Steam Line Break Without Isolation"
11/20/1989 Letter to Honorable Kenneth M. Carr, Chairman of U.S. Nuclear Regulatory Commission
11/24/1989 Module 1 Of The Draft Safety Evaluation Report For The Advanced Boiling Water Reactor Design
11/24/1989 Coherence In The Regulatory Process
12/19/1989 Proposed Rule On Access Authorization At Nuclear Power Plants
12/20/1989 Proposed Amendment To 10 CFR Part 55, Operators' Licenses, To Include "Fitness-For-Duty" Penalties
12/21/1989 Coherence In The Regulatory Process

Page Last Reviewed/Updated Thursday, June 12, 2025