ACRS 1983 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/20/1983 ACRS Report On The Decentralization Of NRC Regulatory Activities
12/19/1983 ACRS Comments On The NRC Staff Requirements For Reinspection Of BWR
12/19/1983 ACRS Action On Revision 1 To Proposed Regulatory Guide 1.89 On Environmental Qualification Of Electric Equipment
12/19/1983 ACRS Report On Training and Qualification Of Nuclear Power Plant Personnel
12/19/1983 ACRS Action On Rev. 1 To Proposed Reg. Guide 1.89
12/19/1983 ACRS Report On The Proposed Addition Of A Human Factors Criterion To 10 CFR 50, Appendix A
11/22/1983 Report on the Expanded Systematic Evaluation Program Integrated Plant Safety Assessment of the Big Rock Point Plant.
11/22/1983 ACRS Action On Reg. Guide 1.105, Rev. 2, Instrument Setpoints For Safety-Related Systems.
11/22/1983 Generic Issue B-10, Hydrodynamic Loads On Mark III Containment Structures.
10/18/1983 Need For Rapid Depressurization Capability In Newer Combustion Engineering, Inc. Plants.
10/18/1983 ACRS Interim Report Related to the Operating License Application for the Limerick Generating Station, Units 1 and 2
10/18/1983 Severe Accident Decisions for Existing Nuclear Power Plants.
10/18/1983 ACRS Comments On The NRC Integrated Program For The Resolution Of Unresolved Safety Issues
10/17/1983 ACRS Comments On Use Of The TAU Effect At The Diablo Canyon Nuclear Power Plant.
09/07/1983 ACRS Review Of NRC Staff Resolution For Unresolved Safety Issues.
09/06/1983 Letter To Honorable Victor Gilinsky.
09/06/1983 ACRS Report On The Proposed Insider Safeguards Rules
09/02/1983 ACRS Report On Training and Qualification Of Nuclear Power Plant Personnel
09/02/1983 ACRS Report On The Severe Accident Policy.
08/16/1983 ACRS Comments OnThe Prioritization Of Generic Safety Issues.
08/09/1983 ACRS Report On The Rule Concerning Fitness For Duty Of Nuclear Power Plant Personnel.
08/09/1983 ACRS Report On a Proposed Rule Requiring On-Shift Engineering Expertise
08/09/1983 ACRS Report On Flaw Evaluation Procedures For BWR Pipe Cracks
08/09/1983 Revisions To Operational Controls For The Shipment Of Small Quantities Of Plutonium Using the PAT-2 Package
07/15/1983 Additional ACRS Comments On The Prioritization Of Generic Issues
07/15/1983 ACRS Report On The Proposed Final Rule On Anticipated Transients Without Scram
07/14/1983 ACRS Comments On USI A-17, Systems Interaction
07/13/1983 ACRS Comments On The NRC Staff Proposal For Resolution Of USI A-44 Station Blackout
07/12/1983 Proposed Integrated Safety Assessment Program (ISAP)
07/11/1983 ACRS Comments On The NRR Pilot Program For Decentralization Of Operating Reactor Licensing Activities.
06/20/1983 ACRS Comments On The Prioritization Of Generic Issues.
06/16/1983 Comments On the NRC Safety Research Program Budget For Fiscal Years 1985 And 1986.
06/15/1983 ACRS Report Related To The Final Design Approval Of The GESSAR II BWR-6 Nuclear Island Design.
06/14/1983 Fracture Mechanics Approach To Pipe Failure.
05/18/1983 ACRS Report On The Accident Sequence Precursor Study And The Use Of Operational Experience.
05/17/1983 ACRS Subcommittee Report On Control Room Habitability.
05/17/1983 ACRS Report on the Systematic Evaluation Program Review of the La Crosse Boiling Water Reactor.
05/17/1983 ACRS Report on the Systematic Evaluation Program Review of the Haddam Neck Plant.
05/16/1983 ACRS Report On Regionalization.
05/16/1983 ACRS Report On The Proposed Final Rules On Immediate Notification Requirements (10 CFR 50.72) and (10 CFR 50.73).
05/16/1983 ACRS Action On Proposed Regulatory Guide On Instrument Sensing Lines (Task No. IC 126-5).
04/29/1983 Survivability Of Safety-Related Equipment.
04/19/1983 ACRS Report on the Systematic Evaluation Program Review of the Yankee Nuclear Power Station.
04/19/1983 ACRS Report on Low Power Operation of the Seabrook Station, Units 1 and 2.
04/19/1983 ACRS Report on the Clinch River Breeder Reactor Plant.
04/19/1983 ACRS Comments On Regionalization Of NRC Staff Activities.
03/16/1983 ACRS Comments Regarding Potential Pipe Break Effects On Control Rod Drive.
03/15/1983 ACRS Report on the Catawba Nuclear Station, Units 1 and 2.
02/16/1983 ACRS Report on the Skagit-Hanford Nuclear Project, Units 1 and 2.
01/11/1983 Quantification Of Seismic Design Margins.
01/11/1983 ACRS Report On The Proposed Generic Safety Issues Prioritization Methodology.
01/11/1983 ACRS Action On Regulatory Guides.
01/11/1983 Clarification - ACRS Report on the Systematic Evaluation Program Review of the Millstone N P S, Unit 1.
01/10/1983 ACRS Report On SECY-82-1B

Page Last Reviewed/Updated Thursday, July 17, 2025