The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

ACRS 1983 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/20/1983 ACRS Report On The Decentralization Of NRC Regulatory Activities
12/19/1983 ACRS Comments On The NRC Staff Requirements For Reinspection Of BWR
12/19/1983 ACRS Action On Revision 1 To Proposed Regulatory Guide 1.89 On Environmental Qualification Of Electric Equipment
12/19/1983 ACRS Report On Training and Qualification Of Nuclear Power Plant Personnel
12/19/1983 ACRS Action On Rev. 1 To Proposed Reg. Guide 1.89
12/19/1983 ACRS Report On The Proposed Addition Of A Human Factors Criterion To 10 CFR 50, Appendix A
11/22/1983 Report on the Expanded Systematic Evaluation Program Integrated Plant Safety Assessment of the Big Rock Point Plant.
11/22/1983 ACRS Action On Reg. Guide 1.105, Rev. 2, Instrument Setpoints For Safety-Related Systems.
11/22/1983 Generic Issue B-10, Hydrodynamic Loads On Mark III Containment Structures.
10/18/1983 Need For Rapid Depressurization Capability In Newer Combustion Engineering, Inc. Plants.
10/18/1983 ACRS Interim Report Related to the Operating License Application for the Limerick Generating Station, Units 1 and 2
10/18/1983 Severe Accident Decisions for Existing Nuclear Power Plants.
10/18/1983 ACRS Comments On The NRC Integrated Program For The Resolution Of Unresolved Safety Issues
10/17/1983 ACRS Comments On Use Of The TAU Effect At The Diablo Canyon Nuclear Power Plant.
09/07/1983 ACRS Review Of NRC Staff Resolution For Unresolved Safety Issues.
09/06/1983 Letter To Honorable Victor Gilinsky.
09/06/1983 ACRS Report On The Proposed Insider Safeguards Rules
09/02/1983 ACRS Report On Training and Qualification Of Nuclear Power Plant Personnel
09/02/1983 ACRS Report On The Severe Accident Policy.
08/16/1983 ACRS Comments OnThe Prioritization Of Generic Safety Issues.
08/09/1983 ACRS Report On The Rule Concerning Fitness For Duty Of Nuclear Power Plant Personnel.
08/09/1983 ACRS Report On a Proposed Rule Requiring On-Shift Engineering Expertise
08/09/1983 ACRS Report On Flaw Evaluation Procedures For BWR Pipe Cracks
08/09/1983 Revisions To Operational Controls For The Shipment Of Small Quantities Of Plutonium Using the PAT-2 Package
07/15/1983 Additional ACRS Comments On The Prioritization Of Generic Issues
07/15/1983 ACRS Report On The Proposed Final Rule On Anticipated Transients Without Scram
07/14/1983 ACRS Comments On USI A-17, Systems Interaction
07/13/1983 ACRS Comments On The NRC Staff Proposal For Resolution Of USI A-44 Station Blackout
07/12/1983 Proposed Integrated Safety Assessment Program (ISAP)
07/11/1983 ACRS Comments On The NRR Pilot Program For Decentralization Of Operating Reactor Licensing Activities.
06/20/1983 ACRS Comments On The Prioritization Of Generic Issues.
06/16/1983 Comments On the NRC Safety Research Program Budget For Fiscal Years 1985 And 1986.
06/15/1983 ACRS Report Related To The Final Design Approval Of The GESSAR II BWR-6 Nuclear Island Design.
06/14/1983 Fracture Mechanics Approach To Pipe Failure.
05/18/1983 ACRS Report On The Accident Sequence Precursor Study And The Use Of Operational Experience.
05/17/1983 ACRS Subcommittee Report On Control Room Habitability.
05/17/1983 ACRS Report on the Systematic Evaluation Program Review of the La Crosse Boiling Water Reactor.
05/17/1983 ACRS Report on the Systematic Evaluation Program Review of the Haddam Neck Plant.
05/16/1983 ACRS Report On Regionalization.
05/16/1983 ACRS Report On The Proposed Final Rules On Immediate Notification Requirements (10 CFR 50.72) and (10 CFR 50.73).
05/16/1983 ACRS Action On Proposed Regulatory Guide On Instrument Sensing Lines (Task No. IC 126-5).
04/29/1983 Survivability Of Safety-Related Equipment.
04/19/1983 ACRS Report on the Systematic Evaluation Program Review of the Yankee Nuclear Power Station.
04/19/1983 ACRS Report on Low Power Operation of the Seabrook Station, Units 1 and 2.
04/19/1983 ACRS Report on the Clinch River Breeder Reactor Plant.
04/19/1983 ACRS Comments On Regionalization Of NRC Staff Activities.
03/16/1983 ACRS Comments Regarding Potential Pipe Break Effects On Control Rod Drive.
03/15/1983 ACRS Report on the Catawba Nuclear Station, Units 1 and 2.
02/16/1983 ACRS Report on the Skagit-Hanford Nuclear Project, Units 1 and 2.
01/11/1983 Quantification Of Seismic Design Margins.
01/11/1983 ACRS Report On The Proposed Generic Safety Issues Prioritization Methodology.
01/11/1983 ACRS Action On Regulatory Guides.
01/11/1983 Clarification - ACRS Report on the Systematic Evaluation Program Review of the Millstone N P S, Unit 1.
01/10/1983 ACRS Report On SECY-82-1B

Page Last Reviewed/Updated Thursday, July 17, 2025