Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

ACRS 1964 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/16/1964 Report on Shippingport Pressurized Water Reactor
11/18/1964 Report On Enrico Fermi Atomic Power Plant
11/18/1964 Report on Carolinas-Virginia Tube Reactor (CVTR) - Full-Term Operating License
11/18/1964 Report On Engineered Safeguards
11/18/1964 Report on the Peach Bottom Atomic Power Station - Philadelphia Electric Company
10/20/1964 Report on Bodega Bay Atomic Park - Unit 1
10/15/1964 Report on the NASA Plum Brook Reactor
10/15/1964 Report on Esada-Vallecitos Experimental Superheat Reactor (EVESR)
10/15/1964 Report on Nine Mile Point Nuclear Station
08/28/1964 Report on Loft Facility
08/28/1964 Report on Oyster Creek Nuclear Power Plant of Jersey Central Power and Light Company
07/16/1964 Report on Brookhaven High Flux Beam Research Reactor
07/15/1964 Report on City of Los Angeles - Malibu Nuclear Plant - Unit No. 1
07/15/1964 Report on Radiation Effects Reactor (RER) (Pgs. 1362-1363)
07/15/1964 Report on Radiation Effects Reactor (RER)
05/13/1964 Report on N.S. Savannah Changes
05/13/1964 Report on N.S. Savannah
04/09/1964 Report on Piqua Nuclear Power Facility
04/09/1964 Reactor Containment Testing
04/09/1964 Report on NASA Plum Brook Reactor Facility
04/09/1964 Report on N.S. Savannah Maritime Administration Backup Crew
02/25/1964 Seismic Design Of Nuclear Power Plants
02/25/1964 Report on PM-3A
02/19/1964 Report on Connecticut-Yankee Atomic Power Company
02/19/1964 Report on NASA Plum Brook Reactor Facility
02/15/1964 Report on N.S. Savannah
01/17/1964 Comments On Japanese Reactor Site Criteria Guides
01/17/1964 Report on Air Force Nuclear Engineering Test Facility (AF-NETF0)
01/17/1964 Report on Consumers Power Company - Big Rock Point Plant
01/17/1964 Report on La Crosse Boiling Water Reactor (LACBWR)

Page Last Reviewed/Updated Tuesday, July 29, 2025

Page Last Reviewed/Updated Tuesday, July 29, 2025