News and Correspondence for 2004

This page lists, in chronological order, general news and correspondence on Reactor Vessel Head Degradation for 2004.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
12/20/04 Davis-Besse Nuclear Power Station NRC IntegratedInspection Report 05000346/2004015
12/06/04 Submittal of Independent Assessment Report of the Engineering Program Effectiveness at the Davis-Besse Nuclear Power Station
12/06/04 Davis-Besse NRC Update - December 2004 Issue
11/29/04 Correction of Information Provided Regarding Response to Generic Letter 95-07
11/15/04 NRC Triennial Fire Protection Baseline Inspection Report
11/15/04 Submittal of Independent Assessment Report of Corrective Action Program Implementation for the Davis-Besse Nuclear Power Station
11/08/04 Davis Besse Inspection Report 2004-014
11/04/04 Correction of Performance Indicator Data for the Davis-Besse Nuclear Power Station Alert
10/21/04 Letter to Sandy Buchanan - Ohio Citizen Action
10/21/04 Announcement of Special Inspection: Follow-up of Discrepant Alert and Notification System Performance Indicator
10/17/04 NRC Special Inspection - Management and Human Performance Corrective Action Effectiveness
10/08/04 Submittal of Independent Assessment Report of Operations Performance for the Davis-Besse Nuclear Power Station
10/04/04 LER 04-002-00 for Davis-Besse Nuclear Power Station, Unit No. 1 Regarding notification of an unplanned reactor trip during reactor trip breaker testing.
09/29/04 Davis Besse NRC Update - September 2004 Issue
09/27/04 Integrated Inspection Report
09/16/04 Transmittal of Preliminary Davis-Besse ASP Analysis for Internal and Licensee Peer Review
08/18/04 Request for Additional Information Regarding Root Cause Analysis Report
08/13/04 Revision to Commitments Related to Generic Letter 2003-01, "Control Room Habitability"
08/03/04 Davis-Besse Nuclear Power Station; NRC evaluations of changes, experiments, or tests and permanent plant modifications; Inspection Report 05000346/2004010(DRS)
07/30/04 Davis-Besse Nuclear Power Station; Flood Protection Measures, and Maintenance Effectiveness IR 05000346-04-008
07/21/04 Davis Besse NRC Update - July 2004 Issue
07/02/04 Re-submittal of Corrective Action Program Implementation Independence Assessment Plan for Davis-Besse Nuclear Power Station
07/12/04 Submittal of Engineering Program Effectiveness Independent Assessment Plan for the Davis-Besse Nuclear Power Station
06/30/04 Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 1
06/21/04 Davis-Besse Nuclear Power Station; Routine Integrated Inspection Report
06/10/04 Davis-Besse Nuclear Plant; Initial License Examination Report
05/25/04 Davis-Besse Response to Request for Additional Information Regarding Root Cause Analysis Report
05/13/04 Davis Besse NRC Update - May 2004 Issue
05/07/04 Davis-Besse Nuclear Power Station-Notice of Violation NRC Special Inspection-Completeness and Accuracy of Required Records and Submittals to the NRC-Report No.50-346/03-19(DRP)
05/05/04 Davis-Besse Nuclear Power Station NRC Integrated Inspection Report 05000346/2004006
04/30/04 Update on Structural Integrity Assessment of Davis-Besse Reactor Pressure Vessel Head with Corrosion Wastage Cavity
03/25/04 NRC Special Inspection Report 50-346/04-04 Restart Readiness Assessment Team Follow-Up Inspection.
03/22/04 NRC Integrated Special Inspection Report 05000346/2004002
03/11/04 Correction of Information Provided Regarding Status of the Design Basis Validation Program.
03/11/04 Correction to Response date for Request for additional information regarding the Davis-Besse root cause analysis of the reactor pressure vessel head degradation.
03/08/04 Davis-Besse Nuclear Power Station - Inspection Schedule Update
03/08/04 NRC Press Release III-04-011: NRC Approves Davis-Besse Restart
03/08/04 Approval to Restart the Davis-Besse Nuclear Power Station, Closure of Confirmatory Action Letter, and Issuance of Confirmatory Order
03/08/04

Davis-Besse Unit 1, Amendment, One-Time Extension of Steam Generator Tube Inservice Inspection

03/08/04 Confirmatory Order Modifying License (Effective Immediately)
03/05/04 Inspection Report 50-346/04-05 - HPI Pump Final significance Letter
03/05/04 NRC Special Team Inspection Report 50-346/02-10, Corrective Action Program Implementation and Notice of Violation
03/04/04 Request for additional information regarding root cause analysis submitted to the NRC concerning the reactor pressure information.
03/03/04 LER 04-001-00 for Davis-Besse, Unit 1 Regarding Violation of Steam and Feedwater Rupture Control System Technical Specification
02/27/04 NRC Special Inspection Report 50-346/03-12 - Management and Human Performance Root Cause Assessment Phase 3
02/26/04 Meeting Slides from NRC Commission Briefing on Status of Implementation of Davis-Besse Lessons Learned Task Force Recommendations
02/26/04

Recommendation for NRC to Approve Restart of the Davis-Besse Nuclear Power Station and Recommendation to Issue Confirmatory Order

02/25/04 Licensing Renewal Related Correspondence, Updated Forecast for Submittal of License Amendment Applications to Convert to the Improved Standard Technical Specifications and Renew the Operating License
02/23/04

Semiannual Report - Status of Implementation of Davis-Besse Lessons Learned Task Force Report Recommendations

02/20/04 Revised Order EA-03-009
02/13/04 Disposition of Reactor Vessel Head Sample Pieces "A2A7L," A2A7M," and A2A7N."
02/13/04 Request to Amend the Existing Exemption from 10 CFR 50.46 and 10 CFR 50, "Appendix K, for Boric Acid Precipitation Control Methodology.
02/13/04 Supplemental Information Regarding License Amendment Application to Revise Technical Specification 3/4.4.5, "Reactor Coolant System - Steam Generators (SG)," to Permit One-Time Extension of SG Tube Inservice Inspection Interval.
02/12/04 Davis Besse NRC Update - February 2004 Issue
02/10/04 Tech Spec Change, Related Correspondence, Correction of Information Provided in License Amendment Request No. 96-0008
02/06/04 Supplement to the Integrated Report to Support Restart of the Davis-Besse Nuclear Power Station
02/04/04 NRC Special Inspection - Restart Readiness Assessment Team Inspection Report No. 05000346/2003011 (DRP)
01/29/04 Supplemental Information Regarding License Amendment Application to Revise TS 3/4.5, "Reactor Coolant System - Steam Generators," to Permit One-Time Extension of Steam Generator Tube Inservice Inspection Interval.
01/28/04 NRC Special Inspection Report 50-346/03-19 - Completeness and Accuracy of Required Records and Submittals to the NRC
01/28/04 NRC Integrated Inspection Report 05000346/2003025
01/21/04 Davis Besse NRC Update - January 2004 Issue
01/20/04 Request for Exemption From 10CFR50, Appendix R, Section III.G.3 for Fire Area HH.
01/09/04 Supplemental Information Regarding License Amendment Applications to Modify Technical Specification 3/4.5.2, Emergency Core Cooling Systems - ECCS Subsystems
01/07/04 Response to Questions Regarding the 2002 Steam Generator Tube Inspections.
01/05/04 LER 03-011-01. Davis-Besse Unit 1 Inoperability of Containment Spray Pump 1 Due to Solid State Trip Device Ground Fault False Trip
01/05/04 NRC Special Inspection Report No. 05-346/03-24

(To top of page)

Page Last Reviewed/Updated Thursday, January 6, 2022