Date |
Description |
12/20/04 |
Davis-Besse Nuclear Power Station NRC IntegratedInspection Report 05000346/2004015 |
12/06/04 |
Submittal of Independent Assessment Report of the Engineering Program Effectiveness at the Davis-Besse Nuclear Power Station |
12/06/04 |
Davis-Besse NRC Update - December 2004 Issue |
11/29/04 |
Correction of Information Provided Regarding Response to Generic Letter 95-07 |
11/15/04 |
NRC Triennial Fire Protection Baseline Inspection Report |
11/15/04 |
Submittal of Independent Assessment Report of Corrective Action Program Implementation for the Davis-Besse Nuclear Power Station |
11/08/04 |
Davis Besse Inspection Report 2004-014 |
11/04/04 |
Correction of Performance Indicator Data for the Davis-Besse Nuclear Power Station Alert |
10/21/04 |
Letter to Sandy Buchanan - Ohio Citizen Action |
10/21/04 |
Announcement of Special Inspection: Follow-up of Discrepant Alert and Notification System Performance Indicator |
10/17/04 |
NRC Special Inspection - Management and Human Performance Corrective Action Effectiveness |
10/08/04 |
Submittal of Independent Assessment Report of Operations Performance for the Davis-Besse Nuclear Power Station |
10/04/04 |
LER 04-002-00 for Davis-Besse Nuclear Power Station, Unit No. 1 Regarding notification of an unplanned reactor trip during reactor trip breaker testing. |
09/29/04 |
Davis Besse NRC Update - September 2004 Issue |
09/27/04 |
Integrated Inspection Report |
09/16/04 |
Transmittal of Preliminary Davis-Besse ASP Analysis for Internal and Licensee Peer Review |
08/18/04 |
Request for Additional Information Regarding Root Cause Analysis Report |
08/13/04 |
Revision to Commitments Related to Generic Letter 2003-01, "Control Room Habitability" |
08/03/04 |
Davis-Besse Nuclear Power Station; NRC evaluations of changes, experiments, or tests and permanent plant modifications; Inspection Report 05000346/2004010(DRS) |
07/30/04 |
Davis-Besse Nuclear Power Station; Flood Protection Measures, and Maintenance Effectiveness IR 05000346-04-008 |
07/21/04 |
Davis Besse NRC Update - July 2004 Issue |
07/02/04 |
Re-submittal of Corrective Action Program Implementation Independence Assessment Plan for Davis-Besse Nuclear Power Station |
07/12/04 |
Submittal of Engineering Program Effectiveness Independent Assessment Plan for the Davis-Besse Nuclear Power Station |
06/30/04 |
Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 1 |
06/21/04 |
Davis-Besse Nuclear Power Station; Routine Integrated Inspection Report |
06/10/04 |
Davis-Besse Nuclear Plant; Initial License Examination Report |
05/25/04 |
Davis-Besse Response to Request for Additional Information Regarding Root Cause Analysis Report |
05/13/04 |
Davis Besse NRC Update - May 2004 Issue |
05/07/04 |
Davis-Besse Nuclear Power Station-Notice of Violation NRC Special Inspection-Completeness and Accuracy of Required Records and Submittals to the NRC-Report No.50-346/03-19(DRP) |
05/05/04 |
Davis-Besse Nuclear Power Station NRC Integrated Inspection Report 05000346/2004006 |
04/30/04 |
Update on Structural Integrity Assessment of Davis-Besse Reactor Pressure Vessel Head with Corrosion Wastage Cavity |
03/25/04 |
NRC Special Inspection Report 50-346/04-04 Restart Readiness Assessment Team Follow-Up Inspection. |
03/22/04 |
NRC Integrated Special Inspection Report 05000346/2004002 |
03/11/04 |
Correction of Information Provided Regarding Status of the Design Basis Validation Program. |
03/11/04 |
Correction to Response date for Request for additional information regarding the Davis-Besse root cause analysis of the reactor pressure vessel head degradation. |
03/08/04 |
Davis-Besse Nuclear Power Station - Inspection Schedule Update |
03/08/04 |
NRC Press Release III-04-011: NRC Approves Davis-Besse Restart |
03/08/04 |
Approval to Restart the Davis-Besse Nuclear Power Station, Closure of Confirmatory Action Letter, and Issuance of Confirmatory Order |
03/08/04 |
Davis-Besse Unit 1, Amendment, One-Time Extension of Steam Generator Tube Inservice Inspection
|
03/08/04 |
Confirmatory Order Modifying License (Effective Immediately) |
03/05/04 |
Inspection Report 50-346/04-05 - HPI Pump Final significance Letter |
03/05/04 |
NRC Special Team Inspection Report 50-346/02-10, Corrective Action Program Implementation and Notice of Violation |
03/04/04 |
Request for additional information regarding root cause analysis submitted to the NRC concerning the reactor pressure information. |
03/03/04 |
LER 04-001-00 for Davis-Besse, Unit 1 Regarding Violation of Steam and Feedwater Rupture Control System Technical Specification |
02/27/04 |
NRC Special Inspection Report 50-346/03-12 - Management and Human Performance Root Cause Assessment Phase 3 |
02/26/04 |
Meeting Slides from NRC Commission Briefing on Status of Implementation of Davis-Besse Lessons Learned Task Force Recommendations |
02/26/04 |
Recommendation for NRC to Approve Restart of the Davis-Besse Nuclear Power Station and Recommendation to Issue Confirmatory Order
|
02/25/04 |
Licensing Renewal Related Correspondence, Updated Forecast for Submittal of License Amendment Applications to Convert to the Improved Standard Technical Specifications and Renew the Operating License |
02/23/04 |
Semiannual Report - Status of Implementation of Davis-Besse Lessons Learned Task Force Report Recommendations
|
02/20/04 |
Revised Order EA-03-009 |
02/13/04 |
Disposition of Reactor Vessel Head Sample Pieces "A2A7L," A2A7M," and A2A7N." |
02/13/04 |
Request to Amend the Existing Exemption from 10 CFR 50.46 and 10 CFR 50, "Appendix K, for Boric Acid Precipitation Control Methodology. |
02/13/04 |
Supplemental Information Regarding License Amendment Application to Revise Technical Specification 3/4.4.5, "Reactor Coolant System - Steam Generators (SG)," to Permit One-Time Extension of SG Tube Inservice Inspection Interval. |
02/12/04 |
Davis Besse NRC Update - February 2004 Issue |
02/10/04 |
Tech Spec Change, Related Correspondence, Correction of Information Provided in License Amendment Request No. 96-0008 |
02/06/04 |
Supplement to the Integrated Report to Support Restart of the Davis-Besse Nuclear Power Station |
02/04/04 |
NRC Special Inspection - Restart Readiness Assessment Team Inspection Report No. 05000346/2003011 (DRP) |
01/29/04 |
Supplemental Information Regarding License Amendment Application to Revise TS 3/4.5, "Reactor Coolant System - Steam Generators," to Permit One-Time Extension of Steam Generator Tube Inservice Inspection Interval. |
01/28/04 |
NRC Special Inspection Report 50-346/03-19 - Completeness and Accuracy of Required Records and Submittals to the NRC |
01/28/04 |
NRC Integrated Inspection Report 05000346/2003025 |
01/21/04 |
Davis Besse NRC Update - January 2004 Issue |
01/20/04 |
Request for Exemption From 10CFR50, Appendix R, Section III.G.3 for Fire Area HH. |
01/09/04 |
Supplemental Information Regarding License Amendment Applications to Modify Technical Specification 3/4.5.2, Emergency Core Cooling Systems - ECCS Subsystems |
01/07/04 |
Response to Questions Regarding the 2002 Steam Generator Tube Inspections. |
01/05/04 |
LER 03-011-01. Davis-Besse Unit 1 Inoperability of Containment Spray Pump 1 Due to Solid State Trip Device Ground Fault False Trip |
01/05/04 |
NRC Special Inspection Report No. 05-346/03-24 |