The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Advanced Safety Evaluations for Turkey Point, Units 6 and 7 Application

The following table provides access to Advanced Safety Evaluations that the NRC has issued in connection with its review of its review of the COL application that FPL submitted for Turkey Point, Units 6 & 7.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and Interfaces TBD
2 Site Characteristics TBD
3 Design of Structures, Components, Equipment, and Systems TBD
4 Reactor 05/08/13
5 Reactor Coolant System and Connected Systems 07/12/16
6 Engineered Safety Features TBD
7 Instrumentation and Controls 07/12/16
8 Electric Power 01/06/16
9 Auxiliary Systems TBD
10 Steam and Power Conversion 05/06/14
11 Radioactive Waste Management TBD
12 Radiation Protection 07/12/16
13 Conduct of Operations TBD
14 Initial Test Program 07/12/16
15 Accident Analysis 07/12/16
16 Technical Specifications 07/12/16
17 Quality Assurance 07/24/13
18 Human Factors Engineering 07/24/13
19 Response to Severe Accident Policy Statement TBD

Page Last Reviewed/Updated Sunday, September 18, 2022