The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Safety Evaluations with Open Items
Safety Evaluations with Open Items for Comanche Peak Nuclear Power Plant, Units 3 and 4 Application
The following table provides access to Safety Evaluations with Open Items that the NRC has issued in connection with its review of the COL application that Luminant submitted for Comanche Peak Nuclear Power Plant, Units 3 & 4.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Chapter | Description | Date |
|---|---|---|
| 1 | Introduction and General Description of Plant | TBD |
| 2 | Sections 2.0 through 2.3 | 03/29/13 |
| 3 | Design of Structures, Components, Equipment, and Systems | TBD |
| 4 | Reactor | 10/17/12 |
| 5 | Reactor Coolant Connecting Systems | 04/28/11 |
| 6 | Engineered Safety Features | 08/02/13 |
| 7 | Instrumentation and Controls Systems | 03/26/13 |
| 8 | Electric Power | 07/05/11 |
| 9 | Auxiliary Systems | 08/02/13 |
| 10 | Steam and Power Conversion Systems | 07/21/11 |
| 11 | Radioactive Waste Management | 09/20/11 |
| 12 | Radiation Protection | 09/28/11 |
| 13 | Conduct of Operations | 12/06/11 |
| 14 | Initial Test Program | TBD |
| 15 | Accident and Analysis | 06/25/12 |
| 16 | Technical Specifications | 02/14/13 |
| 17 | Quality Assurance | 01/04/13 |
| 18 | Human Factors Engineering | TBD |
| 19 | Probabilistic Risk Assessment and Severe Accident Evaluation | 02/06/13 |
Page Last Reviewed/Updated Thursday, September 03, 2026
Page Last Reviewed/Updated Thursday, September 03, 2026