The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Advanced Safety Evaluations
Advanced Safety Evaluations for Comanche Peak Nuclear Power Plant, Units 3 and 4 Application
The following table provides access to Advanced Safety Evaluations that the NRC has issued in connection with its review of the COL application that Luminant submitted for Comanche Peak Nuclear Power Plant, Units 3 & 4.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Chapter | Description | Date |
|---|---|---|
| 1 | Introduction and General Description of Plant | TBD |
| 2 | Site Characteristics | TBD |
| 3 | Design of Structures, Components, Equipment, and Systems | TBD |
| 4 | Reactor | TBD |
| 5 | Reactor Coolant Connecting Systems | TBD |
| 6 | Engineered Safety Features | TBD |
| 7 | Instrumentation and Controls Systems | TBD |
| 8 | Electric Power | TBD |
| 9 | Auxiliary Systems | TBD |
| 10 | Steam and Power Conversion Systems | TBD |
| 11 | Radioactive Waste Management | TBD |
| 12 | Radiation Protection | TBD |
| 13 | Conduct of Operations | TBD |
| Conduct of Operations - 13.7 Fitness for Duty | 10/01/13 | |
| 14 | Initial Test Program | TBD |
| 15 | Accident and Analysis | TBD |
| 16 | Technical Specifications | TBD |
| 17 | Quality Assurance | TBD |
| 18 | Human Factors Engineering | TBD |
| 19 | Response to Severe Accident Policy Statement | TBD |
Page Last Reviewed/Updated Thursday, September 03, 2026
Page Last Reviewed/Updated Thursday, September 03, 2026