Public Meeting Schedule

NOTE: When a meeting offers video conferencing at multiple locations, these details will be provided.

Detailed information for each meeting is available by selecting [more...]

Meetings presently scheduled from 12/31/2025 forward

Date/Time Purpose Location Contact
01/07/26
9:00AM -
4:30PM ET

Meeting info
The objective of this workshop is to provide a forum for the NRC and the industry to discuss ongoing efforts to improve PRA Realism. This is a continuation of the workshop originally scheduled for September 30-October 1 that was interrupted due to the government shutdown. Topics will include presentations on PRA modeling applications, operating experience, external hazards, human reliability analysis, regulatory and oversight applications, realism for advanced reactors and public perspectives. [more...]

Participation: Information with Q&A

 Teleconference

NRC One White Flint North
11555 Rockville Pike
HQ OWFN-01G05B
Rockville MD
Michelle Gonzalez
(301) 415-5664

01/07/26
9:00AM -
12:00PM ET

Meeting info
The purpose of the meeting is to discuss supplemental information needed for the SNC Fleet License Amendment Request for Changes to Emergency Action Level Schemes to Adopt NEI 99-01 Rev. 7 (L-2025-LLA-0157). [more...]

Participation: Observation

 Teleconference

Hybrid
O-09B2
John G. Lamb
(301) 415-3100

01/07/26
10:00AM -
11:00AM ET

Meeting info
The purpose of the meeting between the U.S. Nuclear Regulatory Commission (NRC) and Duke Energy Progress, LLC (Duke) is to discuss a proposed license amendment request for Shearon Harris Nuclear Power Plant, Unit 1 (HPN), to modify HNP Technical Specification (TS) 3/4.7.5, “Ultimate Heat Sink,” by relocating the minimum water level limits to the licensee-controlled Technical Requirements Manual. The proposed amendment would also update the TS to reflect that either the Auxiliary Reservoir or the Main Reservoir, when operable, meets the associated Limiting Condition for Operation. In addition, an administrative change is proposed to consolidate content from TS Table 6.2-1, “Minimum Shift Crew Composition,” related to the responsibility of the individual designated for the control room command function, into TS 6.1.2. [more...]

Participation: Observation

 Teleconference

Webinar
Tony Sierra
(301) 287-9531

* Date/Time Change *
01/08/26
1:00PM -
2:00PM ET

Meeting info
The purpose of this closed meeting is for Constellation Energy Generation, LLC, (CEG) to discuss with the U.S. Nuclear Regulatory Commission (NRC) staff restoration of the Cyber Security Plan for the Christopher M. Crane Clean Energy Center. [more...]

Participation: Closed

Webinar
Brent Ballard
(301) 415-0680

Justin Poole
(301) 415-2048

01/09/26
1:00PM -
3:30PM ET

Meeting info
The purpose of this partially closed meeting is for GE Vernova to engage with the NRC on the BWRX-300 Expedited Construction and Manufacturing of Certain Structures, Systems, and Components (SSCs) related to SECY-25-0074 Expedited Construction of Certain Structures, Systems, and Components. [more...]

Participation: Partially Closed

 Teleconference

Hybrid
Stacy Joseph
(301) 415-3256

Elias Haddad
(301) 415-4669

01/12/26
2:00PM -
3:00PM ET

Meeting info
The purpose of this meeting between the U.S. Nuclear Regulatory Commission (NRC) and NextEra Energy Florida Power & Light Company (NextEra FPL) is to discuss a planned exemption and license amendment request to change examination requirements for operator licenses. [more...]

Participation: Open

 Teleconference

Webinar
Theo Edwards
(301) 415-1721

01/14/26
12:30PM -
3:00PM ET

Meeting info
For Westinghouse Electric Company (Westinghouse) to present to the U.S. Nuclear Regulatory Commission (NRC) and discuss proprietary information related to the future submittal of Westinghouse Topical Report (TR) WCAP-19027, "High Burnup Extension for Westinghouse Fuel Designs." [more...]

Participation: Closed

Teleconference
Ekaterina Lenning
(301) 415-3151

01/14/26
1:00PM -
2:30PM ET

Meeting info
The purpose of the meeting is to discuss with Virginia Electric Power Company (the licensee) a proposed license amendment which proposes to change Technical Specification (TS) 3.16 Action B.1.a.3 and extend its Allowed Outage Time from 7 days to 14 days to facilitate the replacement of Emergency Diesel Generator 1 cabling. The cable replacement will require a change to Unit 1 and Unit 2 TS to allow Unit 2 to continue to operate while Unit 1 is in outage, and EDG 1 is out of service for cable replacement. A probabilistic risk-informed approach will be used to support this proposed license amendment. [more...]

Participation: Observation

Webinar
Ed Miller
(301) 415-2481

John Klos
(301) 415-5136

01/14/26
1:00PM -
3:00PM ET

Meeting info
To discuss the process for a special nuclear materials license under Title 10 of the Code of Federal Regulations Part 70 (10 CFR Part 70) and to clarify construction activities allowed under 10 CFR Part 70.4(2) [more...]

Participation: Partially Closed

 Teleconference

Hybrid
Jonathan Rowley
(415) 301-4053

01/14/26
2:00PM -
3:00PM ET

Meeting info
To discuss issues related to public access to ADAMS, in particular the recent release of version 1.2.0 of the ADAMS Public Search application. [more...]

Participation: Open

 Teleconference

Webinar
Stephanie Blaney
(301) 415-6975

NRC Public Document Room
(800) 397-4209

01/14/26
2:00PM -
3:00PM ET

Meeting info
The purpose of the meeting between the U.S. Nuclear Regulatory Commission (NRC) and the Tennessee Valley Authority (TVA) is to discuss a proposed alternative request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, for use of mechanical agitation. [more...]

Participation: Observation

 Teleconference

Teleconference
Kimberly Green
(301) 415-1627

Blake Purnell
(301) 415-1380

01/15/26
10:00AM -
2:30PM ET

Meeting info
The purpose of these periodic Advanced Reactor Stakeholder Meetings is to share information and discuss topics related to the licensing and regulation of advanced reactors with the nuclear industry and other stakeholders. This meeting will be a hybrid meeting and use Microsoft Teams. [more...]

Participation: Information with Q&A

 Teleconference

NRC One White Flint North
11555 Rockville Pike
Rockville MD
Kristin McElwee
(301) 415-3703

01/21/26
8:00AM -
5:00PM ET

01/22/26
8:00AM -
5:00PM ET

Meeting info
To facilitate an exchange of technical information about current and emerging NDE in nuclear industry [more...]

Participation: Partially Closed

 Teleconference

NRC Two White Flint North
11555 Rockville Pike
P2 Auditorium (HQ-TWFN-P2AUD)
Rockville MD
Karen Sida
(301) 415-3517

Stephen Cumblidge
(301) 415-2823

01/22/26
2:00PM -
3:30PM ET

Meeting info
The purpose of the meeting between the U.S. Nuclear Regulatory Commission (NRC) and the Tennessee Valley Authority (TVA) is to discuss a proposed license amendment request for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, to revise the licensing basis for the TVA Radiological Emergency Plan by adopting the new Emergency Action Level scheme guidance provided in NEI 99-01, Revision 7, "Development of Emergency Action Levels for Non-Passive Reactors." [more...]

Participation: Observation

 Teleconference

OWFN
11555 Rockville Pike
O-8B4
Rockville MD
Kimberly Green
(301) 415-1627

Blake Purnell
(301) 415-1380

01/27/26
12:30PM -
2:30PM ET

Meeting info
The purpose of the meeting is to hear Southern Nuclear Operating Company (SNC) plan and general overview to submit EPUs and EPU-related LARs for Farley, Units 1 and 2, and Vogtle, Units 1 and 2. [more...]

Participation: Observation

 Teleconference

NRC One White Flint North
11555 Rockville Pike
O-9B4
Rockville MD
John G. Lamb
(301) 415-3100

01/27/26
3:00PM -
4:30PM ET

Meeting info
The purpose of this meeting is to discuss with the National Organization of Test, Research and Training Reactors (TRTR) members, current activities related to operations at research and test reactors. [more...]

Participation: Observation

 Teleconference

Webinar
Cindy K. Montgomery
(301) 415-3398

01/28/26
9:00AM -
4:30PM ET

Meeting info
This is the second of two meetings for the 2025 NRC Standards Forum. This meeting will discuss codes and standards (C&S) activities in detail, following stakeholder perspectives in the first meeting. The Forum aims at facilitating strategic discussions on C&S needs and priorities, accelerating C&S development, and NRC endorsement efficiencies. The Forum is an interactive meeting that engages a variety of stakeholders, such as standards development organizations (e.g. ACI, AISC, ANS, ASCE, ASME, IEEE, etc.), industry representatives, international regulators, research organizations, academia, the general public, and NRC staff. [more...]

Participation: Open

NRC Two White Flint North
11545 Rockville Pike
TWFN Auditorium
Rockville MD
Erick Martinez Rodriguez
(301) 415-0840

Curtis Lurvey
(301) 415-5221

01/29/26
9:00AM -
12:00PM ET

Meeting info
The purpose of this meeting is to discuss Reactor Oversight Process (ROP) topics with the nuclear industry and the public. #NRCForward [more...]

Participation: Observation

 Teleconference

NRC One White Flint North
11555 Rockville Pike
OFWN 1F20
Rockville MD
Brian Benney
(301) 415-2767

02/11/26
8:30AM -
10:30AM ET

Meeting info
The purpose of this meeting is to discuss topics related to Rolls-Royce SMR design Pre-Application activities. [more...]

Participation: Partially Closed

 Teleconference

NRC One White Flint North
11555 Rockville Pike
HQ-OWFN-01F23-Tech
Rockville MD
Getachew Tesfaye
(301) 415-8013

Page Last Reviewed/Updated Friday, November 19, 2021