Issue 159: Qualification of Safety-Related Pumps While Running on Minimum Flow
DESCRIPTION
Historical Background
This issue was identified[1]by NRR and addressed concerns involving centrifugal pumps operat
This issue was identified[1]by NRR and addressed concerns involving centrifugal pumps operat
This issue was identified[1]by NRR after reactor operating experience and research results o
The results of ongoing staff-sponsored research which culminated in the assessment of risk at five U.S. nuclear
In 1977, the NRC initiated the Systematic Evaluation Program (SEP) to review the designs of 51 older, operating nuclear power plants. The SEP was divided into 2 phases.
The TMI-2 Safety Advisory Board was established to provide the licensee, General Public Utilities Nuclear Corporation, with a qualified, independent appraisal of the cleanup of TMI-2
This issue arose as the result of an event at the Palo Verde Nuclear Generating Station (PVNGS) Unit 3 in which
The reliability of essential service water (ESW) systems and related problems have been an ongoing staff concern which has been documented in NUREG/CR-2
This issue was identified[1]by DSIR/RES following ACRS concerns raised during the review of
This issue was identified in a DSIR/RES memorandum[1]which addressed the concern for the rel
This issue was identified[1]by DSIR/RES and addressed the concern for overpressurization of