Issue 198: Hydrogen Combustion in PWR Piping
DESCRIPTION
Historical Background
This issue was initiated[1]in response to a recommendation in the screening analysis of Gene
This issue was initiated[1]in response to a recommendation in the screening analysis of Gene
This GI was proposed[1]in response to a concern raised by the ACRS in its May 21, 2004, repo
The issue of potential hazards from combustible gases was raised[1]after two events involvin
Beginning in the early-1980s, the NRC sponsored the development of a Probabilistic Seismic Hazard Analysis (PSHA) methodology by LLNL.
This issue was raised[1]by NRR and addresses the adequacy of the calculations, testing, and
The issue of potential blockage in the containment sumps was first identified in Unresolved Safety Issue (USI)
The risk of failure from fatigue of various reactor coolant system components was studied under Issue 78 and