Issue 128: Electrical Power Reliability
DESCRIPTION
Following the NRR reorganization in November 1985, EIB/DSRO was responsible for resolving three issues that were directly related to onsite electrical sy
Following the NRR reorganization in November 1985, EIB/DSRO was responsible for resolving three issues that were directly related to onsite electrical sy
This issue was identified in the U.S.
The reliability of PWR main steam safety valves (MSSVs) was identified as a generic issue in a DSRO
On June 9, 1985, Davis-Besse had a partial loss of feedwater while operating at 90% power. Following a reactor trip, the loss of all feedwater occurred.
In 1985, operating experience as well as staff and industry studies indicated that AFW systems continued to fail at a high rate. These studies also indic
Following the Davis-Besse event in June 1985, potential inadequacies of nuclear power plant design criteria and safety analyses were raised in a DST/NRR
The loss of all feedwater event at Davis-Besse on June 9, 1985, resulted in the formation of an NRC project
In December 1984, the staff recommended in SECY-83-357B[1]that rulemaking with regard to H
In an August 1983 memorandum,[1]the EDO requested a comprehensive review of NRC requirements