Issue 129: Valve Interlocks to Prevent Vessel Drainage During Shutdown Cooling
Historical Background
This issue was identified in a May 1986 DSI memorandum[1]in which 21 instances of BWR vessel drainin
This issue was identified in a May 1986 DSI memorandum[1]in which 21 instances of BWR vessel drainin
Following the NRR reorganization in November 1985, EIB/DSRO was responsible for resolving three issues that were directly related to onsite electrical systems: Issue 48, "LCO for Cla
This issue was identified in the U.S.
The reliability of PWR main steam safety valves (MSSVs) was identified as a generic issue in a DSRO
On June 9, 1985, Davis-Besse had a partial loss of feedwater while operating at 90% power. Following a reactor trip, the loss of all feedwater occurred.
In 1985, operating experience as well as staff and industry studies indicated that AFW systems continued to fail at a high rate. These studies also indicated that plants with similar
The loss of all feedwater event at Davis-Besse on June 9, 1985, resulted in the formation of an NRC project
In December 1984, the staff recommended in SECY-83-357B[1]that rulemaking with regard to H2 control for LWRs wi
This issue was raised[1]by the staff in 1985 during the review of several plant TS when it w