Issue 139: Thinning of Carbon Steel Piping in LWRs
DESCRIPTION
Historical Background
This issue was raised[1]as a result of a pipe rupture in the main feedwater (MFW) system at
This issue was raised[1]as a result of a pipe rupture in the main feedwater (MFW) system at
The issue of deinerting upon discovery of RCS leakage was identified[1]by DL/NRR, based on d
On August 21, 1984, the Haddam Neck plant experienced failure of a refueling cavity seal during preparations for refueling.
This issue was identified by NRR/EIB in February 1986 when it was suggested that Issue 106, "Piping and the Use of Highly Combustible Gases in Vital Are
Steam generator overfill and its consequences have received staff and industry attention because of the frequency and severity of overfill events.
Since the TMI-2 accident in March 1979, to which human error was a major contributor, the issue of academic requirements for reactor operators has been a major concern of the NRC.
In IE Circular No.
This issue was identified[1]by NRR as a result of concern for the potential loss of the RHR
Potential seismic interaction involving the movable in-core flux mapping systems was identified as a generic
This issue was identified[1]when the staff found the Byron Unit 1 vulnerable to core-melt se