Issue 80: Pipe Break Effects on Control Rod Drive Hydraulic Lines in the Drywells of BWR Mark I and II Containments
DESCRIPTION
Historical Background
This issue was identified by the ACRS in 1978 during the operating license reviews of some BWRs.
This issue was identified by the ACRS in 1978 during the operating license reviews of some BWRs.
STS for newer OLs require licensees to keep account of the number of transient occurrences to ensure that transient limits, based on design assumptions, a
On November 11, 1981, the DAILY REPORT-REGION I carried a "prompt report" from Calvert Cliffs Units 1 and 2 indicating the
On two occasions (February 22 and 25, 1983), Salem Unit 1 failed to scram automatically due to failure of both reactor trip
This issue was raised[1]by DSI in June 1983 and addresses the concern that several operating P
During the period 1978 to 1980, there were reports of fatigue failure of thermal sleeve assemblies in the piping systems of both PWRs and BWRs.
This issue was raised in Board Notification No.