Issue 40: Safety Concerns Associated with Pipe Breaks in the BWR Scram System
DESCRIPTION
Historical Background
On April 3, 1981, AEOD published draft NUREG-0785, "Safety Concerns Associated with Pipe Breaks in the
On April 3, 1981, AEOD published draft NUREG-0785, "Safety Concerns Associated with Pipe Breaks in the
This issue was identified in a 1980 AEOD memorandum[1]and concerned the slow loss of control air pressure in the pneumatic c
In AEOD/CO05,[1]AEOD identified potential safety problems concerning steam generator overfill due to control system failures
This issue was identified in an AEOD memorandum[1]to NRR in May 1980.
This issue was raised in an AEOD memorandum[1]to NRR and OIE in October 1980 and addressed the problem of flow blockage by A