Home > NRC Library > ADAMS Public Documents
FOIA/PA-2005-0280 - Resp 1 - Final.
Accession Number: ML052130153
Date Released: Friday, August 5, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML052130156 - FOIA/PA-2005 -0280 - Resp 1 - Final. (92 page(s), 7/28/2005)
- ML022910333 - 10/16/2002 & 10/17/2002, Meeting Agenda, Slides & Viewgraphs for Meeting with NEI re: Early Site Permit Issues. (87 page(s), 12/12/2002)
- ML023010055 - Letter to C. Dodgen, City Clerk for the City of Port Gibson, MS from J. Lyons re: November 14, 2002, Public Meeting. (2 page(s), 10/31/2002)
- ML023020400 - 11/14/02, Forthcoming Meeting to Discuss ESP Review Process for Grand Gulf Site ESP Application. (12 page(s), 11/1/2002)
- ML023570393 - Meeting Handouts - Presentation Material for 11/14/02 Public Meetings to Discuss ESP Review of the Grand Gulf Site ESP Application. (24 page(s), 11/14/2002)
- ML023570400 - Meeting Agenda for Public Meetings to Discuss ESP Review of the Grand Gulf Site ESP Application. (1 page(s), 11/14/2002)
- ML023570402 - Meeting Attendees for the 11/14/02 Public Meeting To Discuss ESP Review of the Grand Gulf Site ESP Application. (3 page(s), 11/14/2002)
- ML030280655 - 11/14/02 Summary of Public Meetings to Discuss Early Site Permit (ESP) Review of the Grand Gulf Site ESP Application. (11 page(s), 2/11/2003)
- ML030350519 - 2003/04/04-Pre-Application Review of Dominion North Anna Early Site Permit Project Quality Assurance Plan. (15 page(s), 4/4/2003)
- ML030980029 - Letter to G. Zinke, Entergy to provide NRC guidance on how security measures should be addressed in application for early site permit (ESP) at Grand Gulf site. (6 page(s), 5/6/2003)
- ML031280718 - Letter to K. Hughey - USNRC Responses to Entergy Nuclear Comments on Draft RS-002, "Processing Applications for Early Site Permits." (6 page(s), 6/23/2003)
- ML031350581 - Schedule for Entergy Early Site Permit Application. (2 page(s), 5/9/2003)
- ML031480443 - Letter to G. Zinke, re: Alternative Energy Sources. (8 page(s), 6/2/2003)
- ML031540413 - Letter from G. A. Zinke, Entergy re: Quality Processes for Preparing the Entergy ESP Application. (3 page(s), 8/15/2002)
- ML031540416 - Attachment - Early Site Permitting Project - Grand Gulf Nuclear Station Site from Enercon Services Inc. - Quality Assurance Project Planning Document. (13 page(s), 7/29/2002)
- ML031540420 - Attachment 2 - Enercon Services, Inc. Quality Assurance Planning Document - Preparation and Control of Project Instructions. (34 page(s), 5/28/2002)
- ML031540423 - Attachment 5 - Enercon Services, Inc. Quality Assurance Planning Document - Preliminary Evaluation of Uniform Hazard Spectra (8 page(s), 5/20/2002)
- ML031540739 - Attachment 6 - Enercon Services, Inc. Quality Assurance Planning Document - Geologic, Geotechnical, and Geophysical Field Exploration and Laboratory Testing. (190 page(s), 7/29/2002)
- ML031710783 - USNRC Responses - Comments on Draft RS-002, "Processing Applications for Early Site Permits." (39 page(s), 6/23/2003)
- ML032250068 - Schedule for Entergy Early Site Permit Application. (2 page(s), 8/1/2003)
- ML032300354 - 09/02/2003, Forthcoming Meeting with Entergy Nuclear Potomac Regarding QA for Grand Gulf ESP Application. (9 page(s), 8/19/2003)
- ML032340622 - 09/02/2003-REVISED - Forthcoming Meeting with Entergy Nuclear Potomac Regarding QA for the Grand Gulf ESP Application. (9 page(s), 8/25/2003)
- ML032471714 - 09/02/2003, Meeting with Entergy Nuclear Potomac re: plans for NRC to conduct inspections of quality assurance measures in support of prospective ESP application for Grand Gulf site. (31 page(s), 9/2/2003)
- ML032680514 - 09/02/03 Summary of Meeting Regarding QA for Grand Gulf ESP Application. (8 page(s), 10/14/2003)
- ML032731680 - Maintenance of Documents at Port Gibson Public Library Related to Application by SERI for Early Site Permit for Grand Gulf. (4 page(s), 9/30/2003)
- ML032960291 - Grand Gulf Early Site Permit Application, Part 1, Cover and Table of Contents. (30 page(s), 10/22/2003)
- ML032960294 - Grand Gulf Early Site Permit Application, Part 2, Site Safety Analysis Report, Table of Contents. (28 page(s), 10/22/2003)
- ML032960313 - Grand Gulf Early Site Permit Application, Part 2, Chapter 1, Introduction and General Description. (18 page(s), 10/22/2003)
- ML032960320 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Site Characteristics, Pages 2.2-2 - 2.5-97. (192 page(s), 10/22/2003)
- ML032960323 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Tables, 2.1-1 through 2.5-25. (366 page(s), 10/22/2003)
- ML032960331 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.1-2 through 2.3-21. (35 page(s), 10/22/2003)
- ML032960334 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.4-1 through 2.4-55. (69 page(s), 10/22/2003)
- ML032960335 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figure 2.5-1. (1 page(s), 10/22/2003)
- ML032960338 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-2 through 2.5-3. (2 page(s), 10/22/2003)
- ML032960343 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figure 2-5.4a. (1 page(s), 10/22/2003)
- ML032960347 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures, 2.5-4b through 2.5-8. (5 page(s), 10/22/2003)
- ML032960348 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figure 2.5-9a. (1 page(s), 10/22/2003)
- ML032960350 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figure 2.5-9b. (1 page(s), 10/22/2003)
- ML032960364 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-10 through 2.5-14. (5 page(s), 10/22/2003)
- ML032960367 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figure 2.5-15. (1 page(s), 10/22/2003)
- ML032960370 - Grand Gulf Early Site Permit Application. (2 page(s), 10/22/2003)
- ML032960372 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-16a through 2.5-19. (5 page(s), 10/22/2003)
- ML032960373 - Grand Gulf Early Site Permit Application Submittal. (3 page(s), 10/16/2003)
- ML032960376 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-20 through 2.5-24. (5 page(s), 10/22/2003)
- ML032960379 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figure 2.5-25. (1 page(s), 10/22/2003)
- ML032960388 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-26 through 2.5-28. (3 page(s), 10/22/2003)
- ML032960390 - Grand Gulf Early Site Permit Application, Part 3, Chapter 2, Environmental Description. (84 page(s), 10/22/2003)
- ML032960393 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figure 2.5-29. (1 page(s), 10/22/2003)
- ML032960396 - Grand Gulf Early Site Permit Application, Part 3, Chapter 2, Tables 2.2-1 through 2.7-120. (249 page(s), 10/22/2003)
- ML032960398 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-30 through 2.5-37. (8 page(s), 10/22/2003)
- ML032960399 - Grand Gulf Early Site Permit Application, Part 3, Chapter 2, Figures 2.1-1 through 2.4-4. (52 page(s), 10/22/2003)
- ML032960402 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-38 through 2.5-68 (31 page(s), 10/22/2003)
- ML032960404 - Grand Gulf Early Site Permit Application, Part 3, Chapter 2, Figures 2.5-1 through 2.8-2. (31 page(s), 10/22/2003)
- ML032960406 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-69 through 2.5-80. (12 page(s), 10/22/2003)
- ML032960410 - Grand Gulf Early Site Permit Application, Part 3, Chapter 3, Plant Description. (56 page(s), 10/22/2003)
- ML032960411 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-81 through 2.5-86. (6 page(s), 10/22/2003)
- ML032960414 - Grand Gulf Early Site Permit Application, Part 3, Chapter 4, Environmental Effects of Construction. (70 page(s), 10/22/2003)
- ML032960417 - Grand Gulf Early Site Permit Application, Part 2, Chapter 2, Figures 2.5-87 through 2.5-94. (8 page(s), 10/22/2003)
- ML032960418 - Grand Gulf Early Site Permit Application, Part 3, Chapter 5, Environmental Effects of Station Operations. (133 page(s), 10/22/2003)
- ML032960419 - Grand Gulf Early Site Permit Application, Part 2, Chapter 3, Site Safety Assessment. (61 page(s), 10/22/2003)
- ML032960421 - Grand Gulf Early Site Permit Application, Part 3, Chapter 6, Environmental Measurement and Monitoring Programs. (38 page(s), 10/22/2003)
- ML032960422 - Grand Gulf Early Site Permit Application, Part 3, Environmental Report, Table of Contents. (31 page(s), 10/22/2003)
- ML032960425 - Grand Gulf Early Site Permit Application, Part 3, Chapter 7, Environmental Impacts of Postulated Accidents Involving Radioactive Materials. (48 page(s), 10/22/2003)
- ML032960426 - Grand Gulf Early Site Permit Application, Part 3, Chapter 1, Introduction. (9 page(s), 10/22/2003)
- ML032960427 - Grand Gulf Early Site Permit Application, Part 3, Chapter 8, Need for Power. (1 page(s), 10/22/2003)
- ML032960429 - Grand Gulf Early Site Permit Application, Part 3, Chapter 9, Alternatives to Proposed Action. (43 page(s), 10/22/2003)
- ML032960430 - Grand Gulf Early Site Permit Application, Part 3, Chapter 10, Environmental Consequences of Proposed Action. (11 page(s), 10/22/2003)
- ML032960432 - Grand Gulf Early Site Permit Application, Part 4, Emergency Planning Information. (100 page(s), 10/22/2003)
- ML032960435 - Grand Gulf Early Site Permit Application, Part 5, Programs and Plans. (4 page(s), 10/22/2003)
- ML033020043 - Letter to W. A. Eaton re: Notice of Receipt and Availability of Application for Early Site Permit for the Grand Gulf ESP Site. (8 page(s), 11/7/2003)
- ML033110003 - Federal Register Notice - Notice of Receipt and Availability for Early Site Permit for the Grand Gulf ESP Site. (2 page(s), 11/7/2003)
- ML040260250 - Letter submitting comments regarding the Environmental Impact Statement for the construction of one or more new nuclear power plants in Claiborne County, Mississippi. (2 page(s), 1/21/2004)
- ML040300886 - 01/20/2004 Summary of Meeting on QA Site Visit wth System Energy Resources, Inc. (SERI) Regarding the Grand Gulf ESP Application. (8 page(s), 2/6/2004)
- ML040350504 - Response to requested information on the presence of any federally listed threatened or endangered species and/or designated critical habitat for listed species under the jurisdiction of the National Marine Fisheries Service. (3 page(s), 1/28/2004)
- ML040370323 - Letter responding to 01/06/04 request for information on the presence of endangered species in the vicinity of the proposed Grand Gulf ESP alternative site. (3 page(s), 1/26/2004)
- ML040650612 - Letter providing Information on threatened and endangered species, per the Grand Gulf Early Site Permit. (3 page(s), 2/5/2004)
- ML040650620 - Comments on the Application for an Early Site Permit (ESP) Grand Gulf ESP Site. (2 page(s), 2/9/2004)
- ML042080437 - Letter from Robert H. Fitzgerald, Department of Army to Mr. Goutam Bagchi re: Grand Gulf ESP Application. (2 page(s), 7/9/2004)
- ML051680132 - "Measurement of Void Reactivity." (26 page(s), 9/30/1972)
- ML033180651 - Letter to W.A. Eaton Announcing Acceptance and Docketing of the Grand Gulf ESP. (7 page(s), 11/24/2003)
- ML033180654 - Grand Gulf ESP Application Review Schedule. (1 page(s), 11/24/2003)
- ML033280060 - Federal Register Notice - Notice of Acceptance and Docketing of the Application for Early Site Permit for the Grand Gulf ESP Site. (3 page(s), 11/24/2003)
- ML033530010 - Letter to Multiple Addresses re: Grand Gulf ESP Application. (13 page(s), 1/13/2004)
- ML033630515 - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Related to Early Site Permit for Grand Gulf (TAC NO. MC1379). (9 page(s), 12/23/2003)
- ML040081014 - APPLICATION FOR AN EARLY SITE PERMIT FOR THE GRAND GULF SITE (G. CRANMORE). (5 page(s), 1/6/2004)
- ML040081042 - Early Site Permit Review for the Grand Gulf Site (D. Klima). (5 page(s), 1/6/2004)
- ML040081088 - APPLICATION FOR AN EARLY SITE PERMIT (ESP) FOR THE GRAND GULF ESP SITE (P. KURKUL). (5 page(s), 1/6/2004)
- ML040081108 - Application for an Early Site Permit (ESP) for the Grand Gulf ESP Site (M. Bartlett). (4 page(s), 1/6/2004)
- ML040081119 - APPLICATION FOR AN EARLY SITE PERMIT (ESP) FOR THE GRAND GULF ESP SITE (D. STILWELL). (5 page(s), 1/6/2004)
- ML040090099 - APPLICATION FOR AN EARLY SITE PERMIT FOR THE GRAND GULF SITE (R. AYCOCK). (5 page(s), 1/8/2004)
- ML040090125 - Early Site Permit (ESP) Review for the Grand Gulf Site (T. Wagner). (6 page(s), 1/8/2004)
- ML040090141 - Application for an Early Site Permit for the Grand Gulf Site (R. Watson). (4 page(s), 1/8/2004)
- ML040090292 - EARLY SITE PERMIT (ESP) REVIEW FOR THE GRAND GULF SITE (HONORABLE P. MARTIN). (6 page(s), 1/8/2004)
- ML040090309 - Early Site Permit (ESP) Review for the Grand Gulf Site (Honorable G. Pyle). (7 page(s), 1/8/2004)
- ML040090330 - Early Site Permit (ESP) Review for Grand Gulf Site (E. Barbry). (6 page(s), 1/8/2004)
- ML040090364 - 01/21/04 Notice of Public Meeting to Discuss Environmental Scoping Process for Grand Gulf Early Site Permit Review (TAC NO. MC1379). (10 page(s), 1/7/2004)
- ML040300698 - Summary of January 8, 2004, Telephone Conference Call With System Energy Resources, Inc., Regarding Emergency Planning Information Provided in the Grand Gulf Early Site Permit (ESP) Application. (9 page(s), 2/6/2004)
- ML040360176 - 01/21/2004 Attachment 1: (Corrected Transcripts with Copy of NRC Slides, Written Statements); Attachment 2: (List of Meeting Attendees). (173 page(s), 2/21/2004)
- ML040430320 - 2004/01/30-Notices of Appearances for David A. Repka and Kathryn M. Sutton on behalf of System Energy Resources, Inc. (3 page(s), 1/30/2004)
- ML040440048 - 2004/01/29-System Energy Resources, Inc.'s Answer to Notice of Hearing (4 page(s), 1/29/2004)
- ML040480141 - 2004/02/12-Hearing Request & Petition to Intervene by the National Association for the Advancement of Colored People Claiborne County, Mississippi Branch, Nuclear Information & Resource Service, Public Citizen, and Mississippi Chapter of the Sierra Club (27 page(s), 2/12/2004)
- ML040500106 - 2004/02/17-Amended Hearing Request & Petition to Intervene: National Association for the Advancement of Colored People Claiborne County, Mississippi Branch, Nuclear Information & Resource Service, Public Citizen & Mississippi Chapter of the Sierra Club (5 page(s), 2/17/2004)
- ML040510279 - 01/21/2004 Summary of Public Meeting to Discuss the Environmental Scoping Process for the Grand Gulf Early Site Permit (ESP) Application (Tac No. MC1379). (7 page(s), 2/18/2004)
- ML040540751 - Comment (16) of Michael A. Berk Regarding Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (2 page(s), 2/9/2004)
- ML040540752 - Comment (17) of Bob Kochtitzky opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (2 page(s), 2/9/2004)
- ML040540753 - Comment (18) of Cynthia M. Sarthou, on behalf of Gulf Restoration Network regarding Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (3 page(s), 2/9/2004)
- ML040540755 - Comment (20) of Lorraine Kitman opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/9/2004)
- ML040540757 - Comment (2) of Solomon S. Wilson Regarding the Grand Gulf Public Meeting. (1 page(s), 1/19/2004)
- ML040540758 - Comment (19) of Tony Bland opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/9/2004)
- ML040540760 - Comment (21) of Sallie E. Davis opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (2 page(s), 2/10/2004)
- ML040540764 - Comment (22) of Becky Gillette and Rose Johnson on behalf of the Sierra Club in Mississippi, opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (2 page(s), 2/10/2004)
- ML040540765 - Comment (5) of Reilly Morse Regarding the Early Site Permit for a New Reactor at Grand Gulf Nuclear Power Plant. (2 page(s), 2/8/2004)
- ML040540769 - Comment (23) of Judy Treichel opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/10/2004)
- ML040540772 - Comment (8) of Ned Ford opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (4 page(s), 2/8/2004)
- ML040540773 - Comment (24) of Arthur D. Unger opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/10/2004)
- ML040540774 - Comment (9) of Edward A. Mainland re Early Site Permit for New Nuclear Reactor at Grand Gulf Nuclear Power. (1 page(s), 2/8/2004)
- ML040540776 - Comment (10) of Barbara Powell opposing the Grand Gulf Early Site Permit. (1 page(s), 2/8/2004)
- ML040540779 - Comment (25) of Christine Blair opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/11/2004)
- ML040540780 - Comment (11) of Patricia Neveleff opposing the Grand Gulf Early Site Permit. (1 page(s), 2/9/2004)
- ML040540782 - Comment (12) of Davis Mounger opposing the Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/9/2004)
- ML040540783 - Comment (26) of Julianna Padgett opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/11/2004)
- ML040540786 - Comment (13) of Martha Ferris opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (2 page(s), 2/9/2004)
- ML040540787 - Comment (27) of Mark M. Gonzalez opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/11/2004)
- ML040540791 - Comment (28) of Leonard Levine opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/11/2004)
- ML040540792 - Comment (14) of William Ferris opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (2 page(s), 2/9/2004)
- ML040540793 - Comment (29) of Wendy King opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (1 page(s), 2/11/2004)
- ML040540795 - Comment (30) of Micah Walker Parkin on behalf of Alliance for Affordable Energy opposing the Grand Gulf Early Site Permit. (2 page(s), 2/11/2004)
- ML040540798 - Comment (15) of Takasha Lewis opposing Site Permit for Nuclear Reactor at Grand Gulf Nuclear Power Plant. (2 page(s), 2/9/2004)
- ML040540801 - Comment (33) of Paul and Linda Gunter, Nuclear Information and Resource Service, Regarding the Grand Gulf EIS Scoping. (5 page(s), 2/12/2004)
- ML040540802 - Comment (34) of Ruth Pullen Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (2 page(s), 2/13/2004)
- ML040540805 - Comment (35) of Tom Pullen Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (2 page(s), 2/13/2004)
- ML040540812 - Comment (36) of Chris Holly Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/13/2004)
- ML040540821 - Comment (37) of Tiffany Elyce Crane Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/13/2004)
- ML040540826 - Comment (38) of Charlie Brenner Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (2 page(s), 2/13/2004)
- ML040540827 - Comment (39) of Susan Hall Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/13/2004)
- ML040540829 - Comment (40) of Marianne Hill Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (2 page(s), 2/13/2004)
- ML040540831 - Comment (41) of Ginnette A. Lolli Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/13/2004)
- ML040540834 - Comment (42) of Betty Daugherty Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/13/2004)
- ML040540836 - Comment (43) of Tom Mann Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/13/2004)
- ML040540839 - Comment (44) of Alex Major Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (2 page(s), 2/14/2004)
- ML040540843 - Comment (45) of K. Brad Ott Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/14/2004)
- ML040540845 - Comment (46) of Lavaree Jones Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (2 page(s), 2/16/2004)
- ML040540853 - Comment (47) of Christine Murphey Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/17/2004)
- ML040540857 - Comment (48) of Jane W. Lusk Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/9/2004)
- ML040540861 - Comment (49) Opposing the Early Site Permit at Grand Gulf Nuclear Power Plant. (1 page(s), 2/13/2004)
- ML040620151 - SRM-M040302A-Affirmation Session: I.SECY-04-0023 - Private Fuel Storage (Independent Spent Fuel Storage Installation); II. SECY-04-0028 - Req for Application of New Part 2 Rules to Early Site Permit Hearings in North Anna, Clinton, & Grand Gulf. (1 page(s), 3/2/2004)
- ML040620405 - 2004/03/02-Commission Memorandum and Order (CLI-04-08) (13 page(s), 3/2/2004)
- ML040620547 - 2004/02/24-Answer by System Energy Resources, Inc. to Petition to Intervene (6 page(s), 2/24/2004)
- ML040630831 - 2004/03/01-Petitioners' Response to System Energy Resources Inc.'s Motion to Apply Revised Rules of Practice (4 page(s), 3/1/2004)
- ML040640456 - 2004/02/27-NRC Staff's Answer to Hearing Request and Petition to Intervene by the National Association for the Advancement of Colored People Claiborne County, Mississippi Branch, Nuclear Information and Resource Service, Public Citizen. . . (10 page(s), 2/27/2004)
- ML040700060 - 2004/03/08-MEMORANDUM AND ORDER (Initial Prehearing Order) (14 page(s), 3/8/2004)
- ML040770494 - 2004/03/15-Grand Gulf - Notice of Appearance of Tyson R. Smith on behalf of the NRC Staff (3 page(s), 3/15/2004)
- ML040780554 - Comment (1) of Solomon S. Wilson regarding the Environmental Impact Study, Grand Gulf Nuclear Power Station. (1 page(s), 1/25/2004)
- ML040830045 - IR 05200009-04-001 on 02/13/2004 for System Energy Resources, Inc., - NRC Inspection of Applicant and Contractor Quality Assurance Activities Involved with Preparation of the Application for an Early Site Permit. (40 page(s), 3/19/2004)
- ML040850591 - 2004/03/22-ESTABLISHMENT OF ATOMIC SAFETY AND LICENSING BOARD (4 page(s), 3/22/2004)
- ML040850612 - 2004/03/22-LB MEMORANDUM AND ORDER (Scheduling Initial Prehearing Conference) (9 page(s), 3/22/2004)
- ML040980201 - 2004/04/01-Petitioners' Motion for Reconsideration of Memorandum and Order Scheduling Initial Prehearing Conference (8 page(s), 4/1/2004)
- ML040990460 - 2005/04/05-LB MEMORANDUM AND ORDER (Denying Motion Requesting Reconsideration of Initial Prehearing Conference Location) (10 page(s), 4/5/2004)
- ML041180060 - Trip Report From Site Visit To The Grand Gulf ESP Site and Audit of Meteorology and Design Basis Accident Aspects of Grand Gulf ESP Application. (5 page(s), 5/7/2004)
- ML041270178 - 2004/05/03-Waste Confidence Contentions of the NAACP-Claiborne County, MS Branch, Nuclear Information & Resource Service, Public Citizen, and Mississippi Chapter of the Sierra Club Regarding Early Site Permit Application for Site of Grand Gulf... (18 page(s), 5/3/2004)
- ML041270478 - Summary of Site Audit to Support Review of Early Site Permit for Grand Gulf Site (TAC NO. MC1379). (12 page(s), 5/5/2004)
- ML041310449 - Comments on Listed Species, the Endangered Fat Pocketbook Mussel (Potamilus Capax Identified. (2 page(s), 4/14/2004)
- ML041320391 - 2004/05/03-Contentions of the NAACP-Claiborne County, Mississippi Branch, Nuclear Information & Resource Service, Public Citizen, and Mississippi Chapter of the Sierra Club Regarding Early Site Permit... (131 page(s), 5/3/2004)
- ML041330230 - Issuance of Environmental Scoping Summary Report Associated with the Staff's Review of the Application by System Energy Resources, Inc. (SERI) Entergy for an Early Site Permit for the Grand Gulf ESP Site. (71 page(s), 5/11/2004)
- ML041400113 - Request For Additional Information Letter No. 1 - System Energy Resources, Inc. Early Site Permit (ESP) Application for the Grand Gulf ESP Site Safety Analysis Report Sections 2.3.1 and 2.3.2. (9 page(s), 6/1/2004)
- ML041400221 - 06/22/04-Letter to W. Eaton, Entergy Operations, re: ESP Template. (6 page(s), 6/22/2004)
- ML041400230 - 2004/06/22-Draft Template for the Issuance of Early Site Permits. (8 page(s), 6/22/2004)
- ML041420530 - Request for Additional Information Related to the Staff's Review of the Environmental Report for the Grand Gulf Early Site Permit (ESP) Application. (25 page(s), 5/19/2004)
- ML041450301 - 2004/05/14-Petitioners' Errata to Contentions (4 page(s), 5/14/2004)
- ML041470464 - Followup to Early Site Permit Application Environmental Audit - Response 2. (5 page(s), 5/19/2004)
- ML041530462 - 2004/05/28-Grand Gulf - NRC Staff's Response to Petitioners' Contentions Regarding the Early Site Permit Application for the Grand Gulf Site (50 page(s), 5/28/2004)
- ML041540537 - 2004/06/02-Grand Gulf - NRC Staff's Errata to its Response to Petitioners' Contentions Regarding the Early Site Permit Application for the Grand Gulf Site (4 page(s), 6/2/2004)
- ML041550744 - 2004/06/03-LB ORDER (Granting Extension Request) (9 page(s), 6/3/2004)
- ML041560142 - 2004/05/28-Answer by System Energy Resources. Inc. to Proposed Contentions (57 page(s), 5/28/2004)
- ML041560238 - 2004/06/03-Clinton, North Anna, Grand Gulf - NRC Staff's Motion for Leave to File Notices of Appearance (14 page(s), 6/3/2004)
- ML041610345 - Grand Gulf, Request For Additional Information Letter No. 2, Early Site Permit Application for the Grand Gulf ESP Site. (9 page(s), 7/15/2004)
- ML041610498 - 2004/06/04-LB Memorandum and Order (Initial Prehearing Conference Schedule; Attendee Preregistration; Argument Allocations; Opportunity for Written Limited Appearance Statements) (12 page(s), 6/4/2004)
- ML041630136 - 2004/06/01-Petitioners' Motion for Extension of Time to Reply to Responses to Contentions (7 page(s), 6/1/2004)
- ML041740053 - 2004/06/09-Reply by Petitioners, National Association for the Advancement of Colored People-Claiborne County, Mississippi Branch, Nuclear Information & Resource Service, Public Citizen, and Mississippi Chapter of the Sierra Club, to System Energy . . . (25 page(s), 6/9/2004)
- ML041740691 - SERI ESP Application - EQHAZARD PSHA Calculation. (3 page(s), 6/14/2004)
- ML041800211 - 2004/06/21-Transcript of Pre-Hearing Conference held in Rockville, MD on 06/21/04; pp. 1 - 219 (221 page(s), 6/21/2004)
- ML041810253 - 2004/06/28-LB Memorandum and Order (Material for the Record) (10 page(s), 6/28/2004)
- ML041810358 - 2004/06/22-Transcript of Pre-Hearing Conference held in Rockville, MD on 06/22/04; pp. 220 - 410 (193 page(s), 6/22/2004)
- ML041890202 - Early Site Permit Selection Committee Notebook. Sections 1 through 4. (176 page(s), 12/6/2001)
- ML041890204 - GGNS, Early Site Permit Application, Part 3 - Environmental Report Appendix 2.4A, Agency Consultation Correspondence. (15 page(s), 9/15/2002)
- ML041890206 - Census 2000 Census Block Data. (16 page(s), 5/19/2004)
- ML041890209 - Emergency Planning Zone. (8 page(s), 5/19/2004)
- ML041890211 - Civilian Labor Force Summary for the Tensas Parish Area of Louisiana. (3 page(s), 3/31/2002)
- ML041890213 - Mississippi Employment Security Commission, Labor Data Table for Five Mississippi Counties from 1970-2000. (5 page(s), 5/19/2004)
- ML041890215 - GGNS Early Site Permit Application - Part 3 - Environmental Report, Table 2.5-12, Employment Trends for Claiborne County, Contiguous MS Counties and Tensas Parish, LA - 1990-2000. (1 page(s), 5/19/2004)
- ML041890216 - Record of Communication with Anderson-Tully Company re: Information About the Forest Companies. (1 page(s), 5/31/2002)
- ML041890222 - "Great Expectations: From Welfare to Work in the South." (15 page(s), 8/31/1999)
- ML041890224 - GGNS Early Site Permit Application - Part 3 - Environmental Report, Table 2.5-9, Area Employment by Industry. (2 page(s), 5/19/2004)
- ML041890225 - Mississippi Community Profiles. (41 page(s), 11/11/2002)
- ML041890226 - Tensas Parish Community Profile. (4 page(s), 5/19/2004)
- ML041890227 - Mississippi & Louisiana School District Information. (23 page(s), 5/19/2004)
- ML041890229 - Record of Communication with Clara May of Grand Gulf Military Monument. (2 page(s), 5/31/2002)
- ML041890230 - Record of Contact with Casey Custer of YMCA Camp. (1 page(s), 11/4/2002)
- ML041890233 - Mississippi & Louisiana Wildlife and Transportation Information. (12 page(s), 5/19/2004)
- ML041890235 - Record of Contact with John Ainsworth of Mississippi Wildlife Fisheries & Parks. (1 page(s), 10/31/2002)
- ML041890236 - Correspondence from Robert Goodson re: Information on Hunters within Parish Near the Mississippi River Across from the GGNS. (1 page(s), 12/9/2002)
- ML041890238 - Correspondence from Bo Boehringer re: Lake Bruin Visitation Numbers. (2 page(s), 9/20/2002)
- ML041890239 - Record of Communication with Rene Meyers of Claiborne County Hospital. (1 page(s), 10/16/2002)
- ML041890241 - Record of Contact with Jim Kegerreis of Enercon Services. (1 page(s), 11/30/2002)
- ML041890242 - Record of Contact with Paul Conguista of Willowford, Gerhardt, & Knight Inc. (1 page(s), 10/1/2002)
- ML041890243 - Record of Communication with Paul Conquista of Willowford, Gerhardt and Knight. (1 page(s), 3/28/2003)
- ML041890245 - Record of Communication/Contact with Carl Middleton & Ray Valentine of MDOT District Office re: GGNS: Widening/Road Projects. (3 page(s), 3/21/2003)
- ML041890247 - Distribution of GGNS Employees by Zip Code & Town. (14 page(s), 4/15/2004)
- ML041890249 - Correspondence from Glenda Hill of the US Army Corps of Engineers re: Data for the Mississippi River. (2 page(s), 6/17/2002)
- ML041890250 - Change in Number of Employed in Claiborne County. (2 page(s), 2/28/1981)
- ML041890361 - Followup to Early Site Permit Application Environmental Audit - Response 1. (17 page(s), 5/19/2004)
- ML041910070 - GGNS Early Site Permit Application, Part 2 - Site Safety Analysis Report, Draft Revision 1, Table 2.3-1 through 2.3-146. (55 page(s), 6/26/2004)
- ML041910079 - Draft Figures 2.3-1 through 2.3-7 and 2.3-18 of SERI - Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report. (8 page(s), 6/26/2004)
- ML041910083 - GGNS Early Site Permit Application, Part 2 - Site Safety Analysis Report, Draft Revision 1. (52 page(s), 6/26/2004)
- ML041910085 - GGNS Early Site Permit - Meteorological Data File Instructions. (1 page(s), 7/1/2004)
- ML041910089 - GGNS Early Site Permit - Meteorological Data Files for 1996. (157 page(s), 7/1/2004)
- ML041910090 - GGNS Early Site Permit - Meteorological Data Files for 1997. (157 page(s), 7/1/2004)
- ML041910093 - GGNS Early Site Permit - Meteorological Data Files for 1998. (157 page(s), 7/1/2004)
- ML041910095 - GGNS Early Site Permit - Meteorological Data Files for 1999. (157 page(s), 7/1/2004)
- ML041910097 - GGNS Early Site Permit - Meteorological Data Files for 2000. (164 page(s), 7/1/2004)
- ML041910099 - GGNS Early Site Permit - Meteorological Data Files for 2001. (157 page(s), 7/1/2004)
- ML041910102 - GGNS Early Site Permit - Meteorological Data Files for 2002. (157 page(s), 7/1/2004)
- ML041910104 - GGNS Early Site Permit - Meteorological Data Files for 2003. (157 page(s), 7/1/2004)
- ML041910507 - Trip Report From Site Visit to the Grand Gulf ESP Site and Audit of Hydrology, Site Hazards, and Physical Security Aspects of Grand Gulf ESP Application. (5 page(s), 7/23/2004)
- ML041960024 - Request For Additional Information Letter No. 3 - System Energy Resources, Inc., ESP Application for the Grand Gulf ESP Site. (9 page(s), 7/23/2004)
- ML042090422 - 2004/07/16-LB MEMORANDUM (Notice of Need for More Time) (8 page(s), 7/16/2004)
- ML042100194 - Request For Additional Information Letter No 4 - Grand Gulf ESP Application. (15 page(s), 8/13/2004)
- ML042110002 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Chapter 1, Intro, TOC & Executive Summary. (32 page(s), 4/14/2005)
- ML042250232 - Request For Additional Information Letter No. 5 - Concerning Grand Gulf ESP Application. (16 page(s), 9/17/2004)
- ML042250507 - 2004/08/12-Commission Order Extending Time for the Petitioners to File their Appeal of LBP-04-19 until 08/27/04. (3 page(s), 8/12/2004)
- ML042290395 - Response to Request for Additional Environmental Information Related to Early Site Permit Application (Partial Response No. 4). (22 page(s), 8/10/2004)
- ML042290410 - "Soil Survey, Claiborne County, Mississippi". (63 page(s), 7/31/1963)
- ML042300040 - 2004/08/06-LB Memorandum and Order (Ruling on Standing and Contentions) (LBP-04-19) (26 page(s), 8/6/2004)
- ML042300613 - 2004/08/11-Petitioners' Request for Extension of Time to File Appeal of LBP-04-19 and Request for Expedited Consideration (4 page(s), 8/11/2004)
- ML042320593 - GGNS Early Site Permit Application, Part 2 - Site Safety Analysis Report, Draft Revision No. 1, Table of Contents through Page 3.4-2. (116 page(s), 8/5/2004)
- ML042320597 - SERI GGNS Early Site Permit Application, Part 2 - Site Safety Analysis Report, Draft Revision No. 1, Figures 2.5-48 through 2.5-59. (12 page(s), 7/30/2004)
- ML042320600 - SERI GGNS Early Site Permit Application, Part 2 - Site Safety Analysis Report, Draft Revision No. 1, Figures 2.5-63 through 2.5-68. (6 page(s), 7/30/2004)
- ML042320601 - GGNS Early Site Permit Application, Part 2 - Site Safety Analysis Report, Draft Revision No. 1, Table 2.5-15 through 26. (19 page(s), 7/30/2004)
- ML042330035 - 2004/08/11-Answer by System Energy Resources, Inc. to Request for Extension of Time (4 page(s), 8/11/2004)
- ML042360603 - 2004/08/24-Notice of Meeting with Dominion Nuclear North Anna, LLC (Dominion), System Energy Resources, Inc. (SERI), & Exelon Generating Company, LLC (Exelon) Re Reviews of Emergency Planning Aspects of Respective Early Site Permit (ESP) Applications. (10 page(s), 8/24/2004)
- ML042390512 - Supplemental Request for Additional Information (RAI) Regarding the Environmental Portion of the Early Site Permit Application by System Energy Resources, Inc. (SERI) for the Grand Gulf ESP Site (TAC No. MC1379). (5 page(s), 8/26/2004)
- ML042400269 - Response to Request for Additional Environmental Information Related to Early Site Permit Application (Partial Response No. 5). (5 page(s), 8/16/2004)
- ML042400279 - Drawing GG1-R88, "A Composite Plat of the Land Surveys, Records and Gulf Nuclear Power Generating Facilities Near Grand Gulf, District 2." (1 page(s), 12/8/1988)
- ML042400285 - Grand Gulf Nuclear Station (GGNS) - Early Site Permit Application, Part 3 - Environmental Report. (15 page(s), 8/13/2004)
- ML042450046 - Grand Gulf Request For Additional Information - System Energy Resources, Inc. Early Site Permit Application. (7 page(s), 9/2/2004)
- ML042450188 - 2004/08/31-LB Notice of Hearing (Application for Early Site Permit) (7 page(s), 8/31/2004)
- ML042450641 - 2004/08/27-Notice of Appeal of LBP-04-19 by the National Association for the Advancement of Colored People-Claiborne County, Mississippi Branch, Nuclear Information and Resource Service, Public Citizen, and Mississippi Chapter of the Sierra Club (2 page(s), 8/27/2004)
- ML042450647 - 2004/08/27-Brief of the National Association for the Advancement of Colored People-Claiborne County, Mississippi Branch, Nuclear Information and Resource Service, Public Citizen, and Mississippi Chapter of the Sierra Club on Appeal of LBP-04-19 (29 page(s), 8/27/2004)
- ML042570264 - 2004/09/08-Grand Gulf ESP - NRC Staff's Brief in Opposition to Petitioner's Appeal of LBP-04-19 (31 page(s), 9/8/2004)
- ML042580204 - 2004/09/07-Brief of System Energy Resources, Inc. in Opposition to Appeal by NAACP-Claiborne County, Mississippi Branch, Nuclear Information and Resource Service, Public Citizen, and Mississippi Chapter of the Sierra Club from LBP-04-19 (27 page(s), 9/7/2004)
- ML042590004 - 2004/09/17 - Summary of Meeting with Dominion, SERI and Exelon Regarding Reviews of EP Aspects of Their Respective ESP Applications. (10 page(s), 9/17/2004)
- ML042600179 - 2004/09/07-Joint Filing of System Energy Resources, Inc. and the Nuclear Regulatory Commission Staff Regarding Mandatory Hearing (8 page(s), 9/7/2004)
- ML042610048 - Early Site Permit - Response to Request for Additional Information Letter No. 3. (30 page(s), 9/14/2004)
- ML042610057 - Grand Gulf Nuclear Station, Early Site Permit Application, Part 2 - Site Safety Analysis Report, Draft Revision 1. (12 page(s), 9/3/2004)
- ML042610059 - Draft Figure 2.2-5, Air Route Map, SERI Grand Gulf Nuclear Station Site, Early Site Permit Application Site, Safety Analysis Report, Draft Revision 1. (1 page(s), 9/4/2004)
- ML042720365 - Early Site Permit - Request for Additional Information Letter No. 4. (1 page(s), 9/21/2004)
- ML042750446 - 2004/10/01-Grand Gulf ESP - Notice of Withdrawal of Appearance for Tyson R. Smith (3 page(s), 10/1/2004)
- ML042810129 - Early Site Permit Application - Update of Referenced Mississippi Radiological Emergency Preparedness Plan. (2 page(s), 9/30/2004)
- ML042810132 - Response to Supplemental Request for Additional Information Regarding the Environmental Portion of the Early Site Permit Application by System Energy Resources, Inc., for the Grand Gulf ESP Site. (7 page(s), 9/30/2004)
- ML042940089 - Response to Request for Additional Information Letter No. 7 - System Energy Resources, Inc., Early Site Permit Application for the Grand Gulf ESP Site. (8 page(s), 9/30/2004)
- ML042940098 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report, Draft Revision 1, pages 2.3-1 through 2.3-33. (33 page(s), 10/1/2004)
- ML042940107 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report, Draft Revision 1, table 3.3-1 through 3.3-28. (31 page(s), 10/1/2004)
- ML042940109 - GGNS Early Site Permit Application Part 3 - Environmental Report, Draft Revision 1, pages 2.7-1 through 2.7-24. (24 page(s), 10/1/2004)
- ML042940128 - GGNS Early Site Permit Application Part 3 - Environmental Report, Draft Revision 1, table 7.1-1 through 7.1-28. (31 page(s), 10/1/2004)
- ML043010057 - 2004/10/25-Grand Gulf ESP - Letter from Antonio Fernández to Administrative Judges informing that the Commission has blocked public access to all applicant and Staff-generated documents related to this proceeding, through ADAMS (1 page(s), 10/25/2004)
- ML043020633 - Second Supplemental Request for Additional Information (RAI) Regarding the Environmental Portion of the Early Site Permit Application by System Energy Resources, Inc. (SERI) for the Grand Gulf ESP SiteTAC NO. MC1379). (5 page(s), 10/28/2004)
- ML043090132 - Revised Dates For Conducting the Environmental Review of the Application by SERI For An ESP For The Grand Gulf ESP Site. (7 page(s), 11/12/2004)
- ML043230065 - 2004/11/17-Grand Gulf ESP - Letter from Antonio Fernández to Administrative Judges informing of the status of the temporary suspension of public access to ADAMS (2 page(s), 11/17/2004)
- ML043350120 - Undated Letter Request For Additional Information Letter No. 6 - Concerning Grand Gulf Early Site Permit Application (15 page(s), 7/28/2005)
- ML043450012 - Requested Legal Determination on Exclusion Area Authority and Control. (3 page(s), 12/17/2004)
- ML043450262 - Sections and Figures of Grand Gulf SSAR. (16 page(s), 12/17/2004)
- ML043520051 - Response to Request for Additional Information Letter No. 5 - System Energy Resources, Inc., Early Site Permit Application for the Grand Gulf ESP Site. (70 page(s), 12/10/2004)
- ML043520084 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology: National Weather Service, UNWS Jackson, MS Climate Zone" (December 16, 2004). (2 page(s), 12/16/2004)
- ML043520091 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology; Southern Regional Climate Center, "Climate Synopsis for Mississippi." (2 page(s), 12/16/2004)
- ML043520134 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report. (128 page(s), 12/10/2004)
- ML043520137 - ANSS-CNSS seismicity 1985 to present. (57 page(s), 12/10/2004)
- ML043520139 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Distribution of Tectonic Features and Historical Seismicity in the Site Region, Figure 2.5-5, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520141 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Histogram of Historic Seismicity for Area Within 200-mile Radius (1627 - 1984 and 1985 - 2004), RAI Figure 2.5.1-1-1. (1 page(s), 11/19/2004)
- ML043520144 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Histogram of Historic Seismicity for Area Within 100-mile Radius (1627 - 1984), RAI Figure 2.5.1-1-2. (1 page(s), 11/19/2004)
- ML043520146 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Summary of Saline River and New Madrid Paleoliquefaction Data, Figure 2.5-97, Draft Rev. 0. (1 page(s), 11/19/2004)
- ML043520149 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Four Liquefaction Event Scenario Maximum Age Range, Figure 2.5-98, Draft Rev. 0. (1 page(s), 11/19/2004)
- ML043520152 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Five Liquefaction Event Scenario Minimum Age Range, Figure 2.5-99, Draft Rev. 0. (1 page(s), 11/19/2004)
- ML043520154 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, New Madrid Composite Liquefaction Scenario and Saline River Correlation, Figure 2.5-100, Draft Rev. 0. (1 page(s), 11/19/2004)
- ML043520156 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report Table 2.5-5, Summary of Minimum and Maximum Limiting Ages for Liquefaction Features Identified in Ashley and Desha Counties, Arkansas, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520157 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report, Figure 2.5-6, Estimation of Average Recurrence and Inter-event Recurrence Intervals from Paleoliquefaction Data in the Saline River Source Zone, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520158 - Text of e-mail correspondence from Dr. R. T. Cox to J. V. Hengesh Regarding liquefaction data from Goldan and Morgan sites in southeastern Arkansas. (1 page(s), 11/2/2004)
- ML043520160 - Text of e-mail correspondence from Dr. R. T. Cox to Dr. D.C. Witter Regarding radiocarbon dates for liquefaction fields in southeastern Arkansas. (2 page(s), 6/19/2004)
- ML043520162 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Fault Sources of New Madrid Seismic Zone, RAI Figure 2.5.1-4-1. (1 page(s), 11/19/2004)
- ML043520164 - SERI Grand Gulf Nuclear Station Early Site Permit Application NRC RAI Response, Estimated Distance to Maximum Extent of Liquefaction, RAI Figure 2.5.1-4-2. (1 page(s), 11/19/2004)
- ML043520165 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report, Table 2.5-13, Calculation of Characteristic Earthquake Recurrence Time Using Slip-rate Method, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520166 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Engineering Report Site Safety Analysis Report, Site Exploration Locations and Extent of Swale Infill, Figure 2.5-69, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520168 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Geologic Section A-A', Figure 2.5-75, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520170 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Geologic Section B - B' (Extended), Figure 2.5-76, Draft Rev. 0. (1 page(s), 11/19/2004)
- ML043520172 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Geologic Section C - C', Figure 2.5-77, Draft Rev. 0. (1 page(s), 11/19/2004)
- ML043520173 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Deep Profiles for Sensitivity Analyses, RAI Figure 2.5.4-4-1. (1 page(s), 11/19/2004)
- ML043520174 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Median Spectra (5% Damping) Computed for the Base-case, "Fast" and "Slow" Profiles (Figure 2.5.4-4-1) RAI Figure 2.5.4-4-2. (1 page(s), 11/19/2004)
- ML043520177 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Median Spectra (5% Damping) Computed for the Base-case, "Fast", and "Slow" Profiles (Figure 2.5.4-4-1), RAI Figure 2.5.4-4-3. (1 page(s), 11/19/2004)
- ML043520178 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Shear Modulus Reduction Curves for Loess, Figure 2.5-87, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520180 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Damping Ratio Curves for Loess, Figure 2.5-88, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520181 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Shear Modulus Reducton Curves for Loess at 4x Confining Stress, Figure 2.5-89, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520182 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Damping Ratio Curves for Loess at 4x Confining Stress, Figure 2.5-90, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520186 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Shear Modulus Reduction Curves for Upland Complex Alluvium, Figure 2.5-91, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520189 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Damping Ratio Curves for Upland Complex Alluvium, Figure 2.5-92, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520190 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Shear Modulus Reduction Curves for Upland Complex Alluvium at 4x Confining Stress, Figure 2.5-93, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520191 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Damping Ratio Curves for Upland Complex Alluvium at 4x Confining Stress, Figure 2.5-94, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520193 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Shear Modulus Reduction Curves for Old Alluvium, Figure 2.5-95, Draft Rev. 0. (1 page(s), 11/19/2004)
- ML043520195 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report Damping Ratio Curves for Old Alluvium, Figure 2.5-96, Draft Rev. 0. (1 page(s), 11/19/2004)
- ML043520196 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report, Table 2.5-26, Dynamic Soil Test Specimens and Properties, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520197 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Geologic Map of Site Region, RAI Figure 2.5.4-9-1.. (1 page(s), 11/19/2004)
- ML043520200 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Geology Map and Digital Terrain Map of Vicksburg Area, RAI Figure 2.5.4-9-2. (1 page(s), 11/19/2004)
- ML043520203 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Topography of the Vicksburg Group Glendon Limestone and Bryan Marl Formations, RAI Figure 2.5.4-9-3. (1 page(s), 11/19/2004)
- ML043520205 - RAI Table 2.5.4-12-1a ESP SPT Data - Loess. (4 page(s), 12/10/2004)
- ML043520208 - RAI Table 2.5.4-12-2a, UFSAR SPT Data - Loess. (26 page(s), 12/10/2004)
- ML043520209 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report, Table 2.5-7, Summary of Static Soil Properties from Site Investigation Program, Draft Rev. 1. (2 page(s), 11/19/2004)
- ML043520210 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application NRC RAI Response, Schematic Section Showing Relationships Between Loess Bluff Slide and ESP Site, RAI Figure 2.5.5-1-1. (1 page(s), 11/19/2004)
- ML043520211 - SERI Grand Gulf Nuclear Station Site Early Site Permit Application Site Safety Analysis Report, Comparison of the GGNS 10-5 Median Uniform Hazard Response Spectrum and the Median Response Spectra Associated with the Controlling Earthquakes. (1 page(s), 11/19/2004)
- ML043520214 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report Table 2.5-11. (1 page(s), 11/19/2004)
- ML043520215 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report Table 2.5-12. (1 page(s), 11/19/2004)
- ML043520217 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report, Table 2.5-14 Earthquakes Within Approximately 320 Km of GGNS- 1985-2004, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML043520221 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report, Table 2.5-20, Summary of Borings and CPT Soundings, Draft Rev. 1. (1 page(s), 11/19/2004)
- ML050050234 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology: Ramsdell, J. V., Jr., Technical Evaluation Report on Design Basis Tornadoes for the Grand Gulf ESP Site," Pacific Northwest National Laboratories, November 9, 2004. (15 page(s), 11/9/2004)
- ML050110438 - Sunshine Federal Register Notice for week of 01/17/05. (2 page(s), 1/11/2005)
- ML050130509 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.2, Local Meteorology: Southern Regional Climate Center, 'Monthly Total Snowfall, Port Gibson 1 NW, Mississippi." (2 page(s), 1/12/2005)
- ML050130513 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.2, Local Meteorology: National Weather Service, "NWS Jackson, MS - St. Joseph 3N Climate." (3 page(s), 1/12/2005)
- ML050130516 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.2, Local Meteorology: Southern Regional Climate Center, "Monthly Precipitation, Port Gibson 1 NW, Mississippi." (2 page(s), 1/12/2005)
- ML050130520 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.2, Local Meteorology: Southern Regional Climate Center, "Vicksburg Military Park, Mississippi Period of Record General Climate Summary - Temperature". (1 page(s), 1/11/2005)
- ML050130524 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology: National Climatic Data Center, Storm Event Database, "Storm Events for Mississippi, Query Results, Snow & Ice Event(s) Reported in Claiborne County, Mississippi .... (2 page(s), 12/20/2004)
- ML050130527 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology:National Climatic Data Center, Storm Event Database, "Storm Events for Mississippi, Query Results, Hail Event(s) Reported in Claiborne County, Mississippi. (2 page(s), 9/30/2004)
- ML050130530 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology: Jarrell, Jerry D. et al, "The Deadliest, Costliest, and Most Intense United States Hurricanes from 1900 to 2000 (And Other Frequently Requested Hurricane Facts)." .. (38 page(s), 12/20/2004)
- ML050140020 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology: National Climatic Data Center, "Severe Thunderstorm Climatology, Total Threat," National Severe Storms Laboratory, August 29, 2003. (7 page(s), 8/29/2003)
- ML050180180 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology: Southern Regional Climate Center, "Monthly Total Snowfall, Jackson 4 NW, Mississippi." (2 page(s), 1/16/2005)
- ML050180187 - Staff Reference for Grand Gulf ESP Application DSER Chapter 2.3.1, Regional Climatology: National Severe Storms Laboratory, "Severe Thunderstorm Climatology, Total Threat." National Severe Storms Laboratory. August 29, 2003. (6 page(s), 8/29/2003)
- ML050180273 - 2005/01/18-Commission Memorandum and Order (CLI-05-04) (15 page(s), 1/18/2005)
- ML050180397 - SRM-M050118 - Affirmation Session: (1) SECY-05-0004 - Grand Gulf ESP; (2) SECY-05-0011 - Louisiana Energy Services - Status of Depleted Uranium as LLW. (2 page(s), 1/18/2005)
- ML050180531 - M050108 - Affirmation Session: (1) SECY-05-0004 - Grand Gulf ESP; (2) SECY-05-0011 - Louisiana Energy Services. (5 page(s), 1/18/2005)
- ML050210086 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Chapter 17 - Early Site Permit Quality Assurance Measures. (46 page(s), 4/14/2005)
- ML050270303 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Chapters 18 and 19 - ACRS Reviews and Conclusions. (2 page(s), 4/14/2005)
- ML050350147 - Enclosed copies of Information at the PNNL gathered and referenced in the Grand Gulf Early Site Permit Environmental Impact Statement. (71 page(s), 1/14/2005)
- ML050380156 - Grand Gulf, Response to request for additional environmental information related to Grand Gulf Early Site Permit Application (Partial Response No. 2). (134 page(s), 7/19/2004)
- ML050380162 - Grand Gulf, Response to Request for Additional Environmental Information Related to Early Eiste Permit Application (Partial Response No. 4). (84 page(s), 8/10/2004)
- ML050380166 - Grand Gulf, Response to Request for Additional Environmental Information (Partial Response No. 1). (76 page(s), 8/16/2004)
- ML050380170 - Grand Gulf, Response to request for additional environmental information related to Grand Gulf Early Site Permit Application (Partial Response No. 3). (74 page(s), 7/22/2004)
- ML050380174 - Grand Gulf, Response to Request for Additional Information Letter No. 5 - System Energy Resources, Inc., Early Site Permit Application. (197 page(s), 12/10/2004)
- ML050380405 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Chapter 3 - Site Safety Assessment. (18 page(s), 4/14/2005)
- ML050380489 - Response to Second Supplemental Request for Additional Information (RAI) Regarding the Environmental Portion of the Early Site Permit Application by System Energy Resources, Inc. (SERI) for the Grand Gulf ESP Site (3 page(s), 2/3/2005)
- ML050410132 - 2004/12/29-Grand Gulf ESP - Letter from Antonio Fernández to Administrative Judges informing that additional material has been restored to the public Citrix-based version of the ADAMS Publicly Available Records System ("PARS") (3 page(s), 12/29/2004)
- ML050410367 - 2 FWS Figure used in GG ESP EIS. (4 page(s), 2/7/2005)
- ML050410499 - Response to request for additional environmental information related to Grand Gulf Early Site Permit Application. (32 page(s), 7/2/2004)
- ML050410501 - Aerial photograph - Response to request for additional environmental information related to Grand Gulf Early Site Permit Application. (1 page(s), 7/2/2004)
- ML050410502 - Aerial photo - Response to request for additional environmental information related to Grand Gulf Early Site Permit Application. (1 page(s), 7/2/2004)
- ML050410503 - Aerial photo - Response to request for additional environmental information related to Grand Gulf Early Site Permit Application. (1 page(s), 7/2/2004)
- ML050470305 - Response to Request for Additional Information (RAI) Regarding the Environmental Portion of the Early Site Permit Application by System Energy Resources, Inc. (SERI) for the Grand Gulf ESP Site. (13 page(s), 2/14/2005)
- ML050490086 - GGNS Early Site Permit Application Part 2 - Site Safety Analysis Report. (100 page(s), 2/11/2005)
- ML050490090 - Map, Figure 2.5-70, Draft Rev 1, "Geologic Map of Site Location and Site Area. (1 page(s), 2/11/2005)
- ML050530327 - Response to Request for Additional Information - System Energy Resources, Inc., Early Site Permit Application for the Grand Gulf ESP Site (Office of General Counsel Review). (32 page(s), 2/17/2005)
- ML050550333 - E-mail re Endangered and Threatened Species at Pilgrim Nuclear Station. (3 page(s), 2/18/2005)
- ML050600222 - Grand Gulf ESP E-Mail on EIS Chapters 2,4, and 5 with Federal T&E Information. (7 page(s), 2/23/2005)
- ML050670338 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Chapter 2, Site Characteristics. (122 page(s), 4/14/2005)
- ML050740064 - Potential Open Items for the Draft Safety Evaluation Report for the Grand Gulf Early Site Permit Application. (10 page(s), 3/24/2005)
- ML050760099 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Appendix A - Chronology. (22 page(s), 4/14/2005)
- ML050770162 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Chapter 13.3 - Emergency Planning. (112 page(s), 4/14/2005)
- ML050800315 - 2005/03/18-Memorandum (Certifying Questions Regarding Mandatory Hearing Procedures) (25 page(s), 3/18/2005)
- ML050820125 - System Energy Resources, Inc. Response to RAI re: Early Site Permit Application for Grand Gulf ESP Site (Seismic Review). (20 page(s), 3/12/2005)
- ML050820231 - OMB-3150-0093, (Final) 10 CFR Part 100 - "Reactor Site Criteria" (Supporting Statement). (8 page(s), 5/31/2005)
- ML050820244 - OMB-3150-0093, (Final) 10 CFR Part 100, "Reactor Site Criteria" (FRN). (5 page(s), 5/31/2005)
- ML050820290 - OMB-3150-0093, NRC Form 620. (1 page(s), 3/31/2005)
- ML050830089 - 2005/03/21-Motion for Leave to File Notices of Appearance (5 page(s), 3/21/2005)
- ML050830130 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Appendix B - References. (14 page(s), 4/14/2005)
- ML050840160 - Summary of February 24, 2005, Telephone Conference Call With System Energy Resources, Inc. (SERI). (11 page(s), 4/7/2005)
- ML050840356 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Chapter 2.5 Geology, Seismology, and Geotechnical Engineer. (106 page(s), 4/14/2005)
- ML050870578 - Grand Gulf Early Site Permit Safety Evaluation Report, Appendix A - Chronology. (22 page(s), 3/28/2005)
- ML050870582 - Grand Gulf Early Site Permit Draft Safety Evaluation Report, Appendix B - References. (14 page(s), 3/28/2005)
- ML050870593 - Grand Gulf Early Site Permit Draft Safety Evaluation Report - Chapter 1 - Intro, TOC & Executive Summary. (32 page(s), 3/28/2005)
- ML050870595 - Grand Gulf Early Site Permit Draft Safety Evaluation Report - Chapter 13.3 - Emergency Planning. (112 page(s), 3/28/2005)
- ML050870597 - Grand Gulf Early Site Permit Draft Safety Evaluation Report - Chapter 17 - Early Site Permit Quality Assurance Measures. (46 page(s), 3/28/2005)
- ML050870599 - Grand Gulf Early Site Permit Draft Safety Evaluation Report - Chapter 2 - Site Characteristics. (132 page(s), 3/28/2005)
- ML050870601 - Grand Gulf Early Site Permit Draft Safety Evaluation Report - Chapter 2.5 - Geology, Seismology, and Geotechnical Engineering. (106 page(s), 3/28/2005)
- ML050870605 - Grand Gulf Early Site Permit Draft Safety Evaluation Report - Chapter 3 - Site Safety Assessment. (17 page(s), 3/28/2005)
- ML050870608 - Grand Gulf Early Site Permit Draft Safety Evaluation Report - Chapters 18 and 19 - ACRS Reviews and Conclusions. (2 page(s), 3/28/2005)
- ML050910208 - Draft Safety Evaluation Report for the Grand Gulf Early Site Permit Application. (7 page(s), 4/7/2005)
- ML050970217 - 04/11/2005 - 05/16/2005 Commission Meetings - FRN. (3 page(s), 4/7/2005)
- ML050970298 - Press Release-05-063: NRC Issues Draft Safety Evaluation for Grand Gulf Early Site Permit Application. (1 page(s), 4/7/2005)
- ML050970312 - 2005/03/29-Notice of Withdrawal of Appearance for David A. Repka and Martin J. O'Neill on behalf of System Energy Resources, Inc. (3 page(s), 3/29/2005)
- ML051020313 - Draft Safety Evaluation Report for the Grand Gulf Early Site Permit Application. (7 page(s), 4/19/2005)
- ML051020450 - 04/18/2005 - 05/23/2005 Commission Meetings - FRN. (3 page(s), 4/12/2005)
- ML051100427 - 2005/04/20-Commission Memorandum and Order (CLI-05-09) (14 page(s), 4/20/2005)
- ML051110104 - 04/21/2005 - Draft Environmental Impact Statement for Early Site Permit (ESP) at Grand Gulf ESP Site (TAC MC1379). (7 page(s), 4/21/2005)
- ML051110284 - 04/21/2005 - Notice of Availability of Draft Environmental Impact Statement (DEIS) for Early Site Permit (ESP) at Grand Gulf ESP Site (TAC No. MC1379). (10 page(s), 4/21/2005)
- ML051170324 - FRN - Early Site Permits, May 16, 2005. (4 page(s), 4/27/2005)
- ML051230495 - 2005/04/08-Grand Gulf ESP - Letter from Kathryn L. Winsberg to Administrative Judges regarding Antonio Fernández's status as a licensed attorney in the State of Maryland (2 page(s), 4/8/2005)
- ML051240260 - 2005/04/19-Grand Gulf ESP - Letter from Kathryn L. Winsberg to Administrative Judges regarding Antonio Fernández's reinstatement by the State of Maryland as a licensed attorney in good standing (2 page(s), 4/19/2005)
- ML051250331 - Press Release-05-076: NRC Seeks Public Input On Grand Gulf Early Site Permit Environmental Impacts; Meeting To Be Held June 28. (2 page(s), 5/5/2005)
- ML051300141 - 2005/05/04-USEC, Inc. Brief in Response to Commission Memorandum and Order (CLI-05-09). (31 page(s), 5/4/2005)
- ML051430337 - 2005/05/18-System Energy Resources, Inc., Brief in Response to Commission Memorandum and Order (CLI-05-09) (31 page(s), 5/18/2005)
- ML051450211 - Press Release-05-084: NRC Advisory Committee on Reactor Safeguards to Meet June 1-3 in Rockville, Maryland. (1 page(s), 5/25/2005)
- ML051470011 - 2005/05/18-Intervenors' Response to Certified Questions (CLI-05-09) (26 page(s), 5/18/2005)
- ML051470274 - Transcript of ACRS Grand Gulf Application Early Site Permit Subcommittee Meeting, May 16, 2005, pages 1-179. (277 page(s), 5/16/2005)
- ML051520019 - OMB-3150-0093, Final Summary of Information, 10 CFR Part 100, Reactor Site Criteria. (2 page(s), 5/31/2005)
- ML051520079 - 1966/01/10-AEC Paper R4/38 on Proposed Amendment to Part 2 - Proposed Statement of General Policy Pertaining to Conduct of Proceedings by ASLB. (67 page(s), 1/10/1966)
- ML051520097 - 2005/05/25-Clinton ESP, North Anna ESP, Grand Gulf ESP, Louisiana Energy Services, L.P., USEC, Inc. - NRC Staff Brief In Response to Commission Memorandum and Order (CLI-05-09) On Mandatory Hearing Procedures (56 page(s), 5/25/2005)
- ML051530341 - G20050470/LTR-05-0338 - C. Randy Hutchinson Ltr re. Potential Delays in the NRC Review of the Grand Gulf Early Site Permit Application (7 page(s), 8/16/2005)
- ML051560010 - 06/28/05 Notice of Forthcoming Meeting with NRC to Receive Comments on the Draft Environmental Impact Statement for the Grand Gulf Early Site Permit Application (TAC No. MC1379). (10 page(s), 6/3/2005)
- ML051730180 - 06/27/2005 - 08/01/2005 Commission Meetings - FRN. (2 page(s), 6/22/2005)
- ML051730399 - OMB-3150-0093, NRC Form 408 Assessment of Proposed Information Collection: Part 100 Reactor Site Criteria (FINAL OCP). (1 page(s), 5/31/2005)
- ML051730405 - OMB-3150-0093, OMB 83-1: Paperwork Reduction Act Subission: 1OCFR Part 100, Reactor Site Criteria. (1 page(s), 5/31/2005)
- ML051730418 - OMB-3150-0093, NRC Form 620 Program Offical Certification for Proposed Collection Information: 10CFR Part 100, Reactor Site Criteria. (1 page(s), 3/31/2005)
- ML051750066 - Early Site Permit Application Part 2 - Site Safety Analysis Report. (54 page(s), 6/21/2005)
- ML051750067 - Early Site Permit Application Part 2 - Site Safety Analysis Report, Table 2.1-5 through Table 2.4-37. (9 page(s), 6/21/2005)
- ML051750068 - Early Site Permit Application Part 2 - Site Safety Analysis Report, Figure 2.1-1 through 2.4-33. (6 page(s), 6/21/2005)
- ML051750069 - Early Site Permit Application Part 2 - Site Safety Analysis Report, Figure 2.4-12 through 2.4-24. (5 page(s), 6/21/2005)
- ML051750072 - Early Site Permit Application Part 3 - Environmental Report. (30 page(s), 6/21/2005)
- ML051750082 - Early Site Permit Application Part 3 - Environmental Report, Table 2.7-117. (2 page(s), 6/21/2005)
- ML051750084 - Early Site Permit Application Part 3 - Environmental Report, Figures 2.1-1 through 2.3-7. (4 page(s), 6/21/2005)
- ML051750088 - Early Site Permit Application Part 3 - Environmental Report, Figures 2.3-12 through 2.3-20. (2 page(s), 6/21/2005)
- ML051750091 - Early Site Permit Application Part 4 - Emergency Planning Information. (3 page(s), 6/21/2005)
- ML051750094 - Early Site Permit Application Part 4 - Site Safety Analysis Report, Figure 2.5-5, Rev 1. (1 page(s), 6/21/2005)
- ML051750096 - Early Site Permit Application Part 4 - Site Safety Analysis Report, Figure OI 2.5-1-1. (1 page(s), 6/21/2005)
- ML051750097 - Early Site Permit Application Part 1 - Site Safety Analysis Report, Administrative Information. (2 page(s), 6/21/2005)
- ML051810398 - 07/04/2005 - 08/08/2005 Commission Meetings - FRN. (2 page(s), 6/30/2005)
- ML051860175 - Response to Grand Gulf Early Site Permit Draft Safety Evaluation Report Open Items 13.3-2 and 13.3-4 Discussion Grand Gulf Nuclear Station, Unit 1. (3 page(s), 6/28/2005)
- ML051950526 - Staff Reference for Grand Gulf ESP Application SER Chapter 2.3.1, Regional Climatology: Southern Regional Climate Center, "Monthly Total Snowfall, Jackson WSFO Airport, Mississippi." (2 page(s), 1/16/2005)
- ML051960026 - Comment (1) of Joseph Mangano on Document NUREG-1817, entitled Environmental Impact Statement for an Early Site Permit at the Grand Gulf ESP Site, Distributed in April 2005. (4 page(s), 7/5/2005)
- ML052000275 - Comment (2) of George A. Zinke re Draft Environmental Impact Statement (DEIS) for an Early Site Permit (ESP) at the Grand Gulf ESP Site. (9 page(s), 7/14/2005)
- ML052070247 - 07/26/2005 - E-Mail re: Grand Gulf ESP Open Item 2.5-3-Case Study of Alternative Treatment of PA=0.5 Source Hazard. (20 page(s), 7/26/2005)