Regulatory Issue Summaries - 2013
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
RIS-13-19 |
Removal of Safeguards Information Designation from Attachment 2 to Order EA-02-261, "Order for Compensatory Measures Related to Access Authorization" |
-- |
12/13/2013 |
-- |
RIS-13-18 |
Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs |
W |
81 FR 73448
10/25/2016 |
-- |
-- |
11/15/2013 |
-- |
RIS-13-17 |
Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown |
-- |
10/17/2013 |
-- |
RIS-13-16 |
Interactions Between the NRC and NRC Stakeholders During a Lapse of Agency Appropriations |
W |
82 FR 27085
06/13/2017 |
05/17 |
S1 |
10/09/2013 |
-- |
W |
82 FR 27085
06/13/2017 |
05/17 |
-- |
10/01/2013 |
-- |
RIS-13-15 |
Not Issued |
-- |
-- |
-- |
RIS-13-14 |
Reporting Transactions Involving Temporary Jobsites to the National Source Tracking System |
-- |
09/11/2013 |
-- |
RIS-13-13 |
Not Issued |
-- |
-- |
-- |
RIS-13-12 |
Notice Of Issuance Of Enforcement Guidance Memorandum – Interim Guidance For Dispositioning Violations Involving 10 CFR 35.60 And 10 CFR 35.63 For The Calibration Of Instrumentation To Measure The Activity Of Rubidium-82 And The Determination Of Rubidium-82 Patient Dosages |
-- |
08/23/2013 |
-- |
RIS-13-11 |
Resolution of Licensing Process Expectations for Pressurized Water Reactor Fuel Assemblies Susceptible to Top Nozzle Stress Corrosion Cracking in Dry Cask Spent Fuel Storage and Transportation |
-- |
09/04/2013 |
-- |
RIS-13-10 |
Permanent Implant Brachytherapy Medical Event Reporting Under 10 CFR Part 35 |
-- |
07/30/2013 |
-- |
RIS-13-09 |
Guidelines for Effective Prevention and Management of System Gas Accumulation |
-- |
08/23/2013 |
-- |
RIS-13-08 |
Process For Scheduling Acceptance Reviews Of New Reactor Licensing And Design Certification Applications And Process For Determining Budget Needs For Fiscal Year 2016 |
W |
81 FR 73448
10/25/2016 |
-- |
-- |
05/28/2013 |
-- |
RIS-13-07 |
NRC Staff Position On The Use of American Society Of Mechanical Engineers Certification Mark |
-- |
05/28/2013 |
-- |
RIS-13-06 |
Preparation and Scheduling of Operator Licensing Examinations |
W |
81 FR 31969
05/20/2016 |
-- |
|
06/07/2013 |
RIS-13-05 |
NRC Position on the Relationship between General Design Criteria and Technical Specification Operability |
-- |
05/09/2013 |
-- |
RIS-13-04 |
Content Specification and Shielding Evaluation for Type B Transportation Packages |
-- |
04/23/2013 |
-- |
RIS-13-03 |
Pre-Application Communication and Scheduling for Medical Radioisotope Facilities Intending to Produce Molybdenum-99 |
-- |
04/24/2013 |
-- |
RIS-13-02 |
Impact of Sequestration on NRC Activities and NRC Stakeholders |
-- |
03/01/2013 |
-- |
RIS-13-01 |
Use Of Aftermarket Sealed Sources Registered Under 10 CFR 32.210 |
-- |
03/12/2013 |
-- |
