The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Preliminary Notification (PN) Reports for 2008

| January | February | March | Apil | May | June | July | August | September | October | November | December |

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

December
PNO-III-08-013A 12/22/2008 Exelon Generation Company, LLC/Quad Cities Station 2: Quad Cities Unit 2 Startup After Repairs to the Steam Piping Bellows Failure Inside of the Main Condenser - Update
PNO-III-08-013 12/15/2008 Quad Cities: Unit 2 Shutdown Due to a Steam Piping Bellows Failure Inside of the Main Condenser
PNO-I-08-013A 12/05/2008 Oyster Creek: Shutdown Greater than 72 Hours: Automatic Reactor Scram due to Main Transformer Fault (Update)
PNO-I-08-013 12/01/2008 Oyster Creek: Shutdown Greater than 72 Hours; Automatic Reactor Scram due to Main Transformer Fault

To top of page

November
PNO-I-08-012 11/17/2008 AmerGen Energy Company, LLC: Results of Implementationof Oyster Creek License Renewal Commitments Related to the Drywell Primary Containment.

To top of page

October
PNO-III-08-012A 10/29/2008 Quad Cities: Notice of Unusual Event Due to Onsite Explosion (Update)
PNO-I-08-011 10/27/2008 PPL Susquehanna, LLC: Alert Declared Due to High Nitrogen Levels in a Unit 2 Safety-Related Pump Room
PNO-III-08-012 10/27/2008 Quad Cities Nuclear Power Plant: Quad Cities Notice of Unusual Even Due to Onsite Explosion

To top of page

September
PNO-III-08-009A 09/29/2008 Monticello Nuclear Generating Station Nuclear Management Company (NMC): Unplanned Shutdown Greater Than 72 Hours (Update)
PNO-III-08-011 09/22/2008 D. C. Cook Power Plant, Indiana Michigan Power Company, American Electric Power (AEP): DC Cook Unit 1 Manual Trip Due to Main Turbine Generator Fire and Significant Fire Suppression System Degradation
PNO-III-08-010 09/17/2008 Monticello Nuclear Generating Station, Nuclear Management Company (NMC): Monticello Loss-of-Offsite-Power
PNO-III-08-009 09/15/2008 Monticello Nuclear Generating Station Nuclear Management Company (NMC): Unplanned Shutdown Greater Than 72 Hours
PNO-IV-08-008A 09/11/2008 Entergy Operations, Inc., Waterford-3 and River Bend Station: NRC Response to Hurricane Gustav (Update)
PNO-IV-08-009 09/09/2008 Department of the Air Force, Lackland Air Force Base: Unintended Dose To An Embryo/Fetus
PNO-IV-08-007A 09/08/2008 Pacific Gas and Electric Company, Diablo Canyon Power Plant: Notice of Unusual Event at Diablo Canyon Unit 2 (Update)
PNO-IV-08-008 09/02/2008 Entergy Operations, Inc., Waterford-3 and River Bend Station: NRC Response to Hurricane Gustav

To top of page

August
PNO-I-08-010 08/28/2008 PSEG: Hope Creek Generating Station Notification of Unusual Event Due to Indications of Internal Flooding
PNO-II-08-010 08/20/2008 Florida Power and Light Company: Unit 1 Shutdown Due to out of Specification Steam Generator Water Chemistry
PNO-IV-08-007 08/18/2008 Pacific Gas and Electric Company, Diablo Canyon Power Plant: Notice of Unusual Event at Diablo Canyon Unit 2
PNO-II-08-009 08/18/2008 Florida Power and Light Company, Turkey Point: Unit 4 Shutdown to Repair Piping Leak
PNO-III-08-008A 08/11/2008 Entergy Nuclear Operations, Inc., Palisades Nuclear Power Plant: Palisades Forced Shutdown to Replace Leaking Control Rod Drive Seals (Update)
PNO-III-08-008 08/07/2008 Entergy Nuclear Operations, Inc., Palisades Nuclear Power Plant: Palisades Forced Shutdown to Replace Leaking Control Rod Drive Seals
PNO-III-08-007A 08/04/2008 Prairie Island: Unplanned Unit 1 Shutdown Greater than 72 Hours/Special Inspection (Update)
PNO-III-08-007 08/01/2008 Prairie Island: Unplanned Unit 1 Shutdown Greater than 72 Hours/Special Inspection

To top of page

July
PNO-IV-08-006 07/29/2008 Southern California Edison Company (San Onofre Nuclear Generating Station): Seismic Event Near San Onfore Nuclear Generating Station and University of California (Irvine) Research Reactor
PNO-I-08-009B 07/22/2008 Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Unit 1: Water Leak in a Cooling Tower at Vermont Yankee (Update)
PNO-I-08-009A 07/16/2008 Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Unit 1: Water Leak in a Cooling Tower at Vermont Yankee (Update)
PNO-I-08-009 07/11/2008 Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Unit 1: Water Leak in a Cooling Tower at Vermont Yankee
PNO-IV-2008-004B 07/11/2008 U.S. Department of Commerce, National Institute of Standards and Technology: Contamination Event (Update)

To top of page

June
PNO-II-08-008 06/27/2008 Duke Energy Carolinas, LLC/McGuire Nuclear Station: Unit 1 Shutdown Due to Loss of 1B Reactor Coolant Pump
PNO-IV-08-004A 06/20/2008 U.S. Department of Commerce, National Institute of Standards & Technology: Contamination Event (Update)
PNO-III-08-006A 06/20/2008 Florida Power and Light/Duane Arnold Energy Center: Status of Duane Arnold Notice of Unusual Event (Update)
PNO-III-08-006 06/16/2008 Florida Power and Light/Duane Arnold Energy Center: Status of Duane Arnold Notice of Unusual Event
PNO-III-08-005 06/13/2008 Detroit Edison Company/Fermi 2: Fermi Declaration of Notification of Unusual Event Due to partial Loss of Annunciators in Control Room. NRC Entered monitoring Mode
PNO-IV-08-005 06/12/2008 Kansas State University: Alert Declared Due to Tornado Damage to Kansas State University Reactor Facility
PNO-IV-08-004 06/11/2008 U.S. Department of Commerce, National Institute of Standards & Technology: Contamination Event

To top of page

May
PNO-I-08-006A 05/30/2008 Vermont Yankee Nuclear Power Station: Transfer of Spent Fuel from Spent Fuel Storage Pool to Onsite Independent Spent Fuel Storage Installation (ISFSI) (Update)
PNO-I-08-007 05/27/2008 Millstone Nuclear Power Station Unit 2: Unusual Event Declared Due to Loss of Offsite Power at Millstone Unit 2
PNO-II-08-007 05/19/2008 Watts Bar Nuclear Plant: Unit 1 Shutdown Due to Main Generator Stator Cooling Water Leak
PNO-II-08-006 05/16/2008 Westinghouse Electric Corporation: Declaration of Alert Due to Loss of Offsite Water Supply
PNO-I-08-005 05/13/2008 Nine Mile Point Nuclear Power Station, Unit 1: Unusual Event Declared Due to Loss of Offsite Power at Nine Mile Point Unit 1

To top of page

April
PNO-II-08-005 04/21/2008 Paducah Gaseous Diffusion Plant: Licensee Response to Earthquake on April 21, 2008
PNO-III-08-004A 04/18/2008 Indiana Michigan Power Company/D.C. Cook Entergy Nuclear Operations, Inc./Palisades: Unusual Events Declared Due to Earthquake (Update)
PNO-III-08-004 04/18/2008 Indiana Michigan Power Company/D.C. Cook Entergy Nuclear Operations, Inc./Palisades: Unusual Events Declared Due to Earthquake
PNO-III-08-003 04/08/2008 FPL Energy Point Beach, LLC: Possible Security Threat
PNO-I-08-004 04/07/2008 Notification of Unusual Event Due to Increase in Unidentified Leakage Following Shutdown for a Refueling Outage

To top of page

March
PNO-III-08-002A 03/28/2008 Exelon Generation LLC/Byron Unit 2: Byron Unit 2 Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses (Update)
PNO-IV-08-003A 03/26/2008 Omaha Public Power District, Fort Calhoun Station: Fort Calhoun Station Reactor Trip and Shutdown Expected to Be Greater than 72 Hours (Supplemental)
PNO-III-08-002 03/26/2008 Exelon Generation LLC/Byron Unit 2: Byron Unit 2 Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses
PNO-II-08-003A 03/19/2008 Progress Energy, Crystal River Nuclear Plant Unit 3: Circumferential Indications in Alloy 600 Weld in Decay Heat Drop Line (Update)
PNO-IV-08-003 03/17/2008 Omaha Public Power District, Fort Calhoun Station: Fort Calhoun Station Reactor Trip and Shutdown Expected to Be Greater than 72 Hours
PNO-II-08-004 03/14/2008 Farley Nuclear Plant Unit 1: Alert Due to 1B Emergency Diesel Generator (EDG) Exhaust Header Failure at Farley
PNO-II-08-001A 03/10/2008 Global Nuclear Fuel - Americas L. L. C.: Alert Declared Based on Moderator Alarm in Moderator-Limited Process Vessel (Update)
PNO-II-08-0003 03/05/2008 Progress Energy, Crystal River Nuclear Plant Unit 3: Circumferential Indications in Alloy 600 Weld in Decay Heat Drop Line
PNO-IV-2008-002A 03/06/2008 Sabia, Inc. - Idaho Falls, Idaho: SR-90 Contamination Event (Update)
PNO-IV-2008-002 03/02/2008 Sabia, Inc. - Idaho Falls, Idaho: Contamination of Worker

To top of page

February
PNO-II-08-002 02/27/2008 Turkey Point Units 3 & 4: Dual Unit Trip at Turkey Point Due to Grid Disturbance
PNO-I-08-003A 02/15/2008 Limerick Generating Station, Unit 2: Shutdown Exceeding 72 Hours (Update)
PNO-I-08-003 02/11/2008 Limerick Generating Station, Unit 2: Shutdown Exceeding 72 Hours
PNO-III-08-001B 02/05/2008 Point Beach Unit 1: Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses (Update)

To top of page

January
PNO-I-08-001A 01/31/2008 Seabrook: Unplanned Shutdown Greater than 72 Hours Resulting from Automatic Reactor Trip Due to Ground Fault on 345kv Line (Update)
PNO-II-08-001 01/31/2008 Global Nuclear Fuel - Americas L. L. C.: Alert Declared Based on Moderator Alarm in Moderator-Limited Process Vessel
PNO-I-08-002 01/30/2008 Ginna Nuclear Power Plant: Loss of Site Communications Due to High Winds
PNO-I-08-001 01/22/2008 Seabrook: Unplanned Shutdown Greater than 72 Hours Resulting from Automatic Reactor Trip Due to Ground Fault on 345kv Line
PNO-III-08-001A 01/18/2008 Point Beach Unit 1: Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses (Update)
PNO-III-08-001 01/16/2008 Point Beach Unit 1: Notice of Unusual Event Due to Loss of Offsite Power to Vital Busses
PNO-IV-08-001A 01/16/2008 Wolf Creek Generating Station: Unplanned Shutdown Greater Than 72 Hours Due To Emergency Core Cooling System Voiding (Event Notification 43895) (Update)
PNO-IV-08-001 01/15/2008 Wolf Creek Generating Station: Unplanned Shutdown Greater Than 72 Hours Due To Emergency Core Cooling System Voiding (Event Notification 43895)