The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Escalated Enforcement Actions Issued to Fuel Cycle Facilites - S

A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

NRC Action Number(s) and
Facility Name
Action Type
(Severity) &
Civil Penalty
(if any)
Date
Issued
Description
EA-09-117
Shaw AREVA MOX Services, SC
ORDER 11/24/2009 On November 24, 2009, an immediately effective Confirmatory Order was issued to Shaw AREVA MOX Services (MOX Services) to confirm commitments made as a result of an Alternative Dispute Resolution mediation session held on October 8, 2009. This enforcement action is based on an apparent deliberate violation of 10 CFR 70.9, "Completeness and accuracy of information." Specifically, a senior structural engineer directed or allowed a junior engineer to sign the senior structural engineer's signature on travelers, which are used as part of MOX Services process to signify that field drawings match design drawings. MOX Services agreed to take a number of corrective actions, including: (1) periodic quality assurance assessments and surveillances of vendor submittals, including drawings, to ensure design requirements are properly implemented; (2) periodic training for all MOX Services project personnel, including onsite contractors, on the definition of and consequences associated with material false statements, as well as the obligations of the signer of project records; (3) periodic safety conscious work environment surveys through the life of construction. In consideration of these commitments, and additional corrective actions previously taken by MOX Services in response to this issue, the NRC agreed to refrain from issuing a civil penalty or Notice of Violation for this apparent violation.
To top of page

Page Last Reviewed/Updated Thursday, March 25, 2021