The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Staff Requirements Memoranda (SRM) for 2018 Commission Papers
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Document Number | Description | Date |
|---|---|---|
| SECY-18-0113 | Recommendations for Modifying the Reactor Oversight Process Engineering Inspections | 08/05/2021 |
| SECY-18-0112 | Petition for Rulemaking and Rulemaking Plan on Individual Monitoring Devices for Industrial Radiographic Personnel | 01/04/2019 |
| SECY-18-0104 | Draft Final Rule: Amendments to Material Control and Accounting Regulations (RIN 3150-AI61; NRC-2009-0096) | 04/03/2019 |
| SECY-18-0103 | Proposed Rule - Emergency Preparedness for Small Modular Reactors and Other New Technologies (RIN 3150 AJ68; NRC-2015-0225) | 12/17/2019 |
| SECY-18-0102 | Denial of Petition for Rulemaking Requiring Licensees to Confirm Seismic Hazards and Flooding Hazards Every 10 Years and Address Any New and Significant Information (PRM-50-99; NRC-2011-0189) | 01/09/2019 |
| SECY-18-0097 | Proposed Controlled Unclassified Information Policy Statement | 01/29/2019 |
| SECY-18-0096 | Functional Containment Performance Criteria for Non-Light-Water-Reactors | 12/04/2018 |
| SECY-18-0093 | Recommended Change to Verification of the Design Reliability Assurance Program | 08/07/2019 |
| SECY-18-0091 | Recommendations for Modifying the Reactor Oversight Process for New Large Light Water Reactors with Passive Safety Systems such as the AP1000 (Generation III + Reactor Designs) | 02/24/2020 |
| SECY-18-0076 | Options and Recommendations for Physical Security for Advanced Reactors | 11/19/2018 |
| SECY-18-0082 | Section 247b. Agreement with the State of Wyoming | 09/10/2018 |
| SECY-18-0080 | Dominion Energy Virginia Request To Consolidate Emergency Operations Facilities for North Anna and Surry Power Stations | 08/27/2018 |
| SECY-18-0062 | Request by the Exelon Generation Company, LLC for Exemptions from Certain Emergency Planning Requirements for the Oyster Creek Nuclear Generating Station | 07/17/2018 |
| SECY-18-0061 | Proposed Agreement Between the State of Wyoming and the Commission Pursuant to Section 274 of the Atomic Energy Act of 1954, As Amended | 06/19/2018 |
| SECY-18-0060 | Achieving Modern Risk-Informed Regulation | 10/10/2019 |
| SECY-18-0058 | Affirmation Session - Final Rule: Enhanced Weapons, Firearms Background Checks, and Security Event Notifications | 01/27/2022 |
| SECY-18-0055 | Proposed Rule: Regulatory Improvements for Production and Utilization Facilities Transitioning to Decommissioning (RIN 3150-AJ59) | 11/03/2021 |
| SECY-18-0049 | Management Directive and Handbook 8.4, "Management of Backfitting, Issue Finality, and Information Collection" | 05/29/2019 |
| SECY-18-0042 | Draft Final NUREG/BR-0058, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission" | 07/26/2019 |
| SECY-18-0036 | Denial of Petition for Rulemaking Submitted by the C-10 Research and Education Foundation (PRM-50-109) | 10/16/2019 |
| SECY-18-0031 | Report to Congress on Abnormal Occurrences: Fiscal Year 2017 | 06/15/2018 |
| SECY-18-0026 | Proposed Rule: Financial Qualifications Requirements for Reactor Licensing (RIN 3150-AJ43) | 07/14/2022 |
| SECY-18-0022 | Denial of Petitions for Rulemaking on Calculated Maximum Fuel Element Cladding Temperature (PRM-50-93 and PRM-50-95; NRC-2009-0554) | 12/21/2020 |
| SECY-18-0013 | Southern Nuclear Operating Company Request to Relocate the Existing Commission-Approved Consolidated Emergency Operations Facility | 02/08/2018 |
| SECY-18-0005 | Policy Statement on Enhancing Participation in U.S. Nuclear Regulatory Commission Public Meetings | 02/19/2021 |
| SECY-18-0003 | Discontinuation of Rulemaking Activity and Denial of Petition for Rulemaking – Requirement to Submit Complete and Accurate Information (Docket No. PRM-50-107; NRC-2013-0077) | 08/06/2019 |
Page Last Reviewed/Updated Tuesday, September 08, 2026
Page Last Reviewed/Updated Tuesday, September 08, 2026