Staff Requirements Memoranda (SRM) for 2002
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Document number | Description | Date |
---|---|---|
SECY-02-0225 | Proposed Criteria for the Treatment of Individual Requirements in a Regulatory Analysis | 03/21/2003 |
SECY-02-0221 | Final Rule to Standardize the Process for Allowing a Licensee to Release Part of Its Reactor Facility or Site for Unrestricted Use Before NRC Has Approved Its License Termination Plan | 03/07/2003 |
SECY-02-0216 | Proposed Process for Providing Information on Significant Nuclear Materials Issues and Adverse Licensee Performance | 02/25/2003 |
SECY-02-0214 | Guidance on the Use of Effective Dose Equivalent in External Dose Assessments | 01/22/2003 |
SECY-02-0204 | Update of Uranium Recovery Guidance Documents | 05/07/2003 |
SECY-02-0199 | Denial of Petition for Rulemaking to Use Information from Prior Licensing Actions as Resolved Information for Early Site Permit and Combined License Applications (PRM-52-1) | 05/07/2002 |
SECY-02-0196 | Recommendations Stemming from the Systematic Assessment of Exemptions from Licensing in 10 CFR parts 30 and 40; and a Rulemaking Plan for Risk-informing 10 CFR Parts 30, 31, and 32 | 11/17/2003 |
SECY-02-0194 | Options for Addressing Part 35 Training and Experience Issues Associated With Recognition of Specialty Boards by NRC | 02/12/2003 |
SECY-02-0191 | Status of the Entombment Option for Power Reactors | 11/26/2002 |
SECY-02-0182 | Briefing on EEO Program | 11/07/2002 |
SECY-02-0180 | Legal and Financial Policy Issues Associated with Licensing New Nuclear Power Plants | |
SECY-02-0179 | Final Rule: Material Control and Accounting Amendments | 12/03/2002 |
SECY-02-0176 | Proposed Rulemaking to Add New Section 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components" (WITS 199900061) | 03/28/2003 |
SECY-02-0175 | Denial of Petition for Rulemaking to Eliminate Review of Alternative Sites, Alternative Energy Sources and Need for Power in Nuclear Power Reactor Siting and Licensing Reviews (PRM-52-2) | 05/07/2003 |
SECY-02-0169 | Briefing on Decommissioning Activities and Status | 10/16/2002 |
SECY-02-0166 | Policy Options and Recommendations for Revising the NRC's Process for Handling Discrimination Issues | 03/26/2003 |
SECY-02-0138 | Denial of Petition for Rulemaking on Mandatory Submittal of Performance Indicator Information Needed for the Reactor Oversight Process (PRM-50-72) | 08/13/2002 |
SECY-02-0135 | Proposed Rule: 10 CFR Parts 63: Specification of a Probability for Unlikely Features, Events, and Processes | 09/04/2002 |
SECY-02-0133 | Control of Solid Materials: Options and Recommendations for Proceeding | 10/25/2002 |
SECY-02-0132 | Proposed Rule: Revision of 10 CFR 50.48 to Permit Light-Water Reactors to Voluntarily Adopt National Fire Protection Association (NFPA) Standard 805, " Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants, 2001 Edition" (NFPA 805) as an Alternative Set of Risk-Informed, Performance-Based Fire Protection Requirements (WITS 199900032) | 10/03/2002 |
SECY-02-0127 | Proposed Response to State of Ohio on Its Assured Isolation Storage Facility Draft Rules | 09/05/2002 |
SECY-02-0122 | Staff Review Guidance for Gaseous Diffusion Plant Changes in Ownership or Control | 09/10/2002 |
SECY-02-0116 | Proposed Rule: 10 CFR Parts 30, 40, and 70: Financial Assurance Amendments for Materials Licensees | 08/27/2002 |
SECY-02-0112 | NRC Review of Idaho National Engineering and Environmental Laboratory Draft Incidental Waste (Waste Incidental to Reprocessing) Determination for Sodium-bearing Waste | 07/26/2002 |
SECY-02-0111 | Proposed Rule to Amend 10 CFR Part 35 to Require Licensees to Notify NRC or an Individual Receiving a Dose Exceeding 50 Millisieverts (5 REM) From a Patient Released Under 10 CFR 35.75 | 08/27/2002 |
SECY-02-0107 | Addendum to SECY-02-0074: "National Materials Program: Pilot Projects" | 08/20/2002 |
SECY-02-0096 | Direct Final Rule on Electronic Maintenance and Submission of Information | 07/23/2002 |
SECY-02-0095 | Applicability of Section 11e.(2) of the Atomic Energy Act to Material at the Sequoyah Fuels Corporation Uranium Conversion Facility | 07/25/2002 |
SECY-02-0090 | Proposed Regulatory Framework and Cost Estimates for U.S. Nuclear Regulatory Commission Regulation of Nuclear Safety at the U.S. Department of Energy's Non-Defense Science Laboratories | 06/28/2002 |
SECY-02-0089 | Revised Draft Nureg-1633 and Public Information Brochure on Potassium Iodide (KI) For the General Public | 11/26/2002 |
SECY-02-0088 | Turkey Point Nuclear Plants, Units 3 and 4, Renewal of Full-Power Operating Licenses | 06/05/2002 |
SECY-02-0085 | Recent Issues with Respect to Decommissioning Funding Assurance that have Arisen as part of License Transfer Applications and other Licensing Requests | 01/03/2003 |
SECY-02-0084 | Final Rule on Decommissioning Trust Provisions | 11/21/2002 |
SECY-02-0081 | Staff Activities Related to the NRC Goal of Reducing Unnecessary Regulatory Burden on Power Reactor Licensees | 06/25/2002 |
SECY-02-0080 | Proposed Rulemaking—Risk-Informed 10 CFR 50.44 "Combustible Gas Control In Containment" (WITS 20010003) | 06/27/2002 |
SECY-02-0077 | Proposed Rule to Update 10 CFR 52, "Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants" | 05/06/2003 |
SECY-02-0068 | Proposed Rule on Financial Information Requirements for Applications to Renew or Extend the Term of an Operating License for a Power Reactor | 05/10/2002 |
SECY-02-0067 | Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Operational Programs (Programmatic ITAAC) |
09/11/2002 |
SECY-02-0060 | Proposed Policy on Enhancing Public Participation in NRC Meeting | 05/08/2002 |
SECY-02-0057 | Update to Secy-01-0133, "Fourth Status Report on Study of Risk-informed Changes to the Technical Requirements of 10 CFR Part 50 (Option 3) and Recommendations on Risk-informed Changes to 10 CFR 50.46 (ECCS Acceptance Criteria)" | 03/31/2003 |
SECY-02-0044 | Annual Status Report for FY 2001 on the Administration of the NRC's Requalification Program and the Results of Initial Operator Licensing Examinations (WITS 198800098) | 04/03/2002 |
SECY-02-0043 | Proposed Rule: Geological and Seismological Characteristics for the Siting and Design of Dry Cask Independent Spent Fuel Storage Installations and Monitored Retrievable Storage Installations - 10 CFR Part 72 | 06/18/2002 |
SECY-02-0033 | Amergen's Request to Consolidate the Clinton Power Station Emergency Operations Facility (EOF) into the Centralized EOF Operated by Exelon Generation Co. | 03/15/2002 |
SECY-02-0032 | Report to Congress on Abnormal Occurrences for Fiscal Year 2001 | 03/27/2002 |
SECY-02-0023A | Addendum to SECY-02-0023: Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort | 10/04/2002 |
SECY-02-0023 | Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort | 10/04/2002 |
SECY-02-0021 | Final Rule on Revision of the Skin Dose Limit, 10 CFR Part 20 | 03/20/2002 |
SECY-02-0002 | Revision of Gaseous Diffusion Plant Recertification Standard Review Plan Chapter on Foreign Ownership and Financial Requirements | 02/21/2002 |
Page Last Reviewed/Updated Friday, March 13, 2020
Page Last Reviewed/Updated Friday, March 13, 2020