The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Staff Requirements Memoranda (SRM) for 2002
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Document number | Description | Date |
|---|---|---|
| SECY-02-0225 | Proposed Criteria for the Treatment of Individual Requirements in a Regulatory Analysis | 03/21/2003 |
| SECY-02-0221 | Final Rule to Standardize the Process for Allowing a Licensee to Release Part of Its Reactor Facility or Site for Unrestricted Use Before NRC Has Approved Its License Termination Plan | 03/07/2003 |
| SECY-02-0216 | Proposed Process for Providing Information on Significant Nuclear Materials Issues and Adverse Licensee Performance | 02/25/2003 |
| SECY-02-0214 | Guidance on the Use of Effective Dose Equivalent in External Dose Assessments | 01/22/2003 |
| SECY-02-0204 | Update of Uranium Recovery Guidance Documents | 05/07/2003 |
| SECY-02-0199 | Denial of Petition for Rulemaking to Use Information from Prior Licensing Actions as Resolved Information for Early Site Permit and Combined License Applications (PRM-52-1) | 05/07/2002 |
| SECY-02-0196 | Recommendations Stemming from the Systematic Assessment of Exemptions from Licensing in 10 CFR parts 30 and 40; and a Rulemaking Plan for Risk-informing 10 CFR Parts 30, 31, and 32 | 11/17/2003 |
| SECY-02-0194 | Options for Addressing Part 35 Training and Experience Issues Associated With Recognition of Specialty Boards by NRC | 02/12/2003 |
| SECY-02-0191 | Status of the Entombment Option for Power Reactors | 11/26/2002 |
| SECY-02-0182 | Briefing on EEO Program | 11/07/2002 |
| SECY-02-0180 | Legal and Financial Policy Issues Associated with Licensing New Nuclear Power Plants | |
| SECY-02-0179 | Final Rule: Material Control and Accounting Amendments | 12/03/2002 |
| SECY-02-0176 | Proposed Rulemaking to Add New Section 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components" (WITS 199900061) | 03/28/2003 |
| SECY-02-0175 | Denial of Petition for Rulemaking to Eliminate Review of Alternative Sites, Alternative Energy Sources and Need for Power in Nuclear Power Reactor Siting and Licensing Reviews (PRM-52-2) | 05/07/2003 |
| SECY-02-0169 | Briefing on Decommissioning Activities and Status | 10/16/2002 |
| SECY-02-0166 | Policy Options and Recommendations for Revising the NRC's Process for Handling Discrimination Issues | 03/26/2003 |
| SECY-02-0138 | Denial of Petition for Rulemaking on Mandatory Submittal of Performance Indicator Information Needed for the Reactor Oversight Process (PRM-50-72) | 08/13/2002 |
| SECY-02-0135 | Proposed Rule: 10 CFR Parts 63: Specification of a Probability for Unlikely Features, Events, and Processes | 09/04/2002 |
| SECY-02-0133 | Control of Solid Materials: Options and Recommendations for Proceeding | 10/25/2002 |
| SECY-02-0132 | Proposed Rule: Revision of 10 CFR 50.48 to Permit Light-Water Reactors to Voluntarily Adopt National Fire Protection Association (NFPA) Standard 805, " Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants, 2001 Edition" (NFPA 805) as an Alternative Set of Risk-Informed, Performance-Based Fire Protection Requirements (WITS 199900032) | 10/03/2002 |
| SECY-02-0127 | Proposed Response to State of Ohio on Its Assured Isolation Storage Facility Draft Rules | 09/05/2002 |
| SECY-02-0122 | Staff Review Guidance for Gaseous Diffusion Plant Changes in Ownership or Control | 09/10/2002 |
| SECY-02-0116 | Proposed Rule: 10 CFR Parts 30, 40, and 70: Financial Assurance Amendments for Materials Licensees | 08/27/2002 |
| SECY-02-0112 | NRC Review of Idaho National Engineering and Environmental Laboratory Draft Incidental Waste (Waste Incidental to Reprocessing) Determination for Sodium-bearing Waste | 07/26/2002 |
| SECY-02-0111 | Proposed Rule to Amend 10 CFR Part 35 to Require Licensees to Notify NRC or an Individual Receiving a Dose Exceeding 50 Millisieverts (5 REM) From a Patient Released Under 10 CFR 35.75 | 08/27/2002 |
| SECY-02-0107 | Addendum to SECY-02-0074: "National Materials Program: Pilot Projects" | 08/20/2002 |
| SECY-02-0096 | Direct Final Rule on Electronic Maintenance and Submission of Information | 07/23/2002 |
| SECY-02-0095 | Applicability of Section 11e.(2) of the Atomic Energy Act to Material at the Sequoyah Fuels Corporation Uranium Conversion Facility | 07/25/2002 |
| SECY-02-0090 | Proposed Regulatory Framework and Cost Estimates for U.S. Nuclear Regulatory Commission Regulation of Nuclear Safety at the U.S. Department of Energy's Non-Defense Science Laboratories | 06/28/2002 |
| SECY-02-0089 | Revised Draft Nureg-1633 and Public Information Brochure on Potassium Iodide (KI) For the General Public | 11/26/2002 |
| SECY-02-0088 | Turkey Point Nuclear Plants, Units 3 and 4, Renewal of Full-Power Operating Licenses | 06/05/2002 |
| SECY-02-0085 | Recent Issues with Respect to Decommissioning Funding Assurance that have Arisen as part of License Transfer Applications and other Licensing Requests | 01/03/2003 |
| SECY-02-0084 | Final Rule on Decommissioning Trust Provisions | 11/21/2002 |
| SECY-02-0081 | Staff Activities Related to the NRC Goal of Reducing Unnecessary Regulatory Burden on Power Reactor Licensees | 06/25/2002 |
| SECY-02-0080 | Proposed Rulemaking—Risk-Informed 10 CFR 50.44 "Combustible Gas Control In Containment" (WITS 20010003) | 06/27/2002 |
| SECY-02-0077 | Proposed Rule to Update 10 CFR 52, "Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants" | 05/06/2003 |
| SECY-02-0068 | Proposed Rule on Financial Information Requirements for Applications to Renew or Extend the Term of an Operating License for a Power Reactor | 05/10/2002 |
| SECY-02-0067 | Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) for Operational Programs (Programmatic ITAAC) |
09/11/2002 |
| SECY-02-0060 | Proposed Policy on Enhancing Public Participation in NRC Meeting | 05/08/2002 |
| SECY-02-0057 | Update to Secy-01-0133, "Fourth Status Report on Study of Risk-informed Changes to the Technical Requirements of 10 CFR Part 50 (Option 3) and Recommendations on Risk-informed Changes to 10 CFR 50.46 (ECCS Acceptance Criteria)" | 03/31/2003 |
| SECY-02-0044 | Annual Status Report for FY 2001 on the Administration of the NRC's Requalification Program and the Results of Initial Operator Licensing Examinations (WITS 198800098) | 04/03/2002 |
| SECY-02-0043 | Proposed Rule: Geological and Seismological Characteristics for the Siting and Design of Dry Cask Independent Spent Fuel Storage Installations and Monitored Retrievable Storage Installations - 10 CFR Part 72 | 06/18/2002 |
| SECY-02-0033 | Amergen's Request to Consolidate the Clinton Power Station Emergency Operations Facility (EOF) into the Centralized EOF Operated by Exelon Generation Co. | 03/15/2002 |
| SECY-02-0032 | Report to Congress on Abnormal Occurrences for Fiscal Year 2001 | 03/27/2002 |
| SECY-02-0023A | Addendum to SECY-02-0023: Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort | 10/04/2002 |
| SECY-02-0023 | Proposed Revision to the Enforcement Policy to Include an Interim Policy Regarding Enforcement Discretion for Fitness-For-Duty Issues and Status of Rulemaking Effort | 10/04/2002 |
| SECY-02-0021 | Final Rule on Revision of the Skin Dose Limit, 10 CFR Part 20 | 03/20/2002 |
| SECY-02-0002 | Revision of Gaseous Diffusion Plant Recertification Standard Review Plan Chapter on Foreign Ownership and Financial Requirements | 02/21/2002 |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026