The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Advisory Committee on Reactor Safeguards (ACRS) 2023 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title Response
12/20/2023 Review Of Advanced Reactor Content of Application Project/Technology-Inclusive Content of Application Project Guidance 03/18/2024
11/24/2023 Interim Letter on Level 3 Probabilistic Risk Assessment  (L3PRA) – Volumes 2 and 4, Pertaining to Reactor at-Power Events  
10/25/2023 Draft White Paper, "Micro-Reactor Licensing and Deployment Considerations: Fuel Loading and Operational Testing at a Factory" 02/01/2024
09/26/2023 Report on the Safety Aspects of the Subsequent License Renewal Application Review of St. Lucie Plant, Units 1 and 2  
09/20/2023 Review of Regulatory Guide 1.183, Revision 1 - Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors 10/05/2023
07/31/2023 EPRI Topical Report 3002018337 – Use of Data Validation and Reconciliation Methods for Measurement Uncertainty Recapture  
07/31/2023 Framatome Topical Report ANP-10339P, ARITA™ - ARTEMIS™/RELAP™ Integrated Transient Analysis Methodology  
07/27/2023 Vogtle Electric Generating Plant, Units 1 and 2, Use of Accident Tolerant Fuel Lead Test Assemblies  
07/21/2023 Transmittal Of Report, International Meeting Of Nuclear Regulatory Advisory Committees - March 2023  
06/20/2023 General Atomics Topical Report, “Fast Modular Reactor Principal Design Criteria,” Revision 2  
05/16/2023 Kairos Non-Power Reactor Hermes Construction Permit Application 06/20/2023
03/20/2023 Safety Evaluation for Framatome Inc., Topical Report ANP-10353P, Revision 0, “Increased Enrichment for PWRs”  
02/25/2023 Report on the Safety Aspects of the Subsequent License Renewal Application Review of Oconee Nuclear Station, Units 1, 2, and 3  
02/15/2023 Draft Safety Evaluation of the Kairos Topical Report – KP-TR-013, “Metallic Materials Qualification for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor  
02/13/2023 Draft Safety Evaluation of the Kairos Topical Report – KP-TR-014, Revision 4 – Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor  

Page Last Reviewed/Updated Thursday, March 28, 2024