Advisory Committee on Reactor Safeguards (ACRS) 2009 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title EDO
Response
12/15/2009 Draft Final Regulatory Guide 1.205, Revision 1, "Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants," and Draft Final Standard Review Plan (SRP) Section 9.5.1.2, "Risk-Informed, Performance-Based Fire Protection Program" 01/27/2010
12/15/2009 Proposed Revision 1 to Regulatory Guide 1.93 (DG-1244) No Response Required
12/15/2009 Draft Final Regulatory Guide 1.40 No Response Required
12/15/2009 Interim Staff Guidance Document 2 (ISG-2) Revision 1, "Fuel Retrievability" No Response Required
12/10/2009 Report on the Safety Aspects of the License Renewal Application for the Prairie Island Nuclear Generating Plant, Units 1 and 2 01/13/2010
12/10/2009 Draft Final Revision 1 of Regulatory Guide 1.151, "Instrument Sensing Lines" 02/01/2010
11/13/2009 Westinghouse AP1000 Design Certification Amendment Status of ACRS Review 12/11/2009
11/12/2009 Draft Final Regulatory Guide 5.71, "Cyber Security Programs for Nuclear Facilities" 03/25/2010
11/06/2009 Proposed Revisions to Regulatory Guides 1.82 and 4.11 No Response Required
10/23/2009 NRC Staff's Safety Evaluation Report with Open Items Regarding the North Anna, Unit 3 Combined License Application 11/18/2009
10/23/2009 Report on the Safety Aspects of the License Renewal Application for the Susquehanna Steam Electric Station, Units 1 and 2 11/19/2009
10/22/2009 Closure of Steam Generator Action Plan Items 3.1k, 3.4, 3.5, 3.10, 3.11 and 3.12 12/03/2009
10/20/2009 Report on Draft Final Revision 2 to Regulatory Guide 1.189 (DG1214), "Fire Protection for Nuclear Power Plants" 11/16/2009
10/16/2009 Report on the 3-Dimensional Structural Analysis of the Oyster Creek Drywell Shell 11/17/2009 
10/02/2009 Draft Digital System Research Plan FY 2010 - FY 2014 Dated July 28, 2009  11/17/2009
09/28/2009 Withdrawl of Regulatory Guides 4.5, 4.6, 7.1, 7.5, 1.83, and 1.165 No Response Required
09/28/2009 Plant Specific Operating Experience for License Renewal Applications  
09/28/2009 Report on the Safety Aspects of the License Renewal Application for the Three Mile Island Nuclear Station, Unit 1 10/21/2009
09/23/2009 Open Items in the Draft Safety Evaluation Report Related to License Renewal Applications  
09/23/2009 Report on the Safety Aspects of the License Renewal Application for the Indian Point Nuclear Generating Unit Nos. 2 and 3 10/21/2009
09/22/2009 Letter from Citizen Power and Beyond Nuclear Concerning the License Renewal for the Beaver Valley Power Station 10/29/2009
09/21/2009 Proposed Revision to NUREG-15201, "Standard Review Plan for the Review of a License Application for a Fuel Cycle Facility." No Response Required
09/21/2009 Proposed Revision to Regulatory Guides 4.16, 8.18, 8.24, 6.9, and 1.115 No Response Required
09/21/2009 Proposed Revision 2 to Regulatory Guide 6.7 No Response Required
09/21/2009 Request by the ACRS for a Future Briefing by NRR on Current Containment Liner Corrosion Issues and Actions Being Taken by the Staff to Address Them  
09/16/2009 Questions Raised by a Member of the Public During an ACRS Subcommittee Meeting on Watts Bar Unit 2  
09/16/2009 ACRS Assessment of the Quality of Selected NRC Research Projects - FY 2009  
09/16/2009 Report of the Safety Aspects of the License Renewal Application for the Beaver Valley Power Station, Units 1 and 2 10/29/2009
07/29/2009 Applicability of Trace Thermal-Hydraulic System Analysis Code to Evaluate the ESBWR Design and Related Matters 10/06/2009
07/27/2009 Draft Final Revision 3 to Regulatory Guide 1.100, "Seismic Qualification of Electrical and Active Mechanical Equipment and Functional Qualification of Active Mechanical Equipment for Nuclear Power Plants" 08/25/2009
07/24/2009 Draft Final Regulatory Guide 1.215, "Guidance for ITAAC Closure Under 10 CFR Part 52" 09/22/2009
07/22/2009 Draft Template NEI-08-08 and Draft DC/COL-ISG-06 08/27/2009
07/22/2009 Withdrawl of Regulatory Guides 7.2, 1.16, 6.3, and 1.135 No Response Required
07/21/2009 Letter From Citizen Power and Beyond Nuclear Concerning the License Renewal for the Beaver Valley Power Station No Response Required
07/21/2009 Proposed Revision 1 to Regulatory Guide 4.2 No Response Required
07/21/2009 Proposed Revisions to Regulatory Guides 1.11, 2.5, 3.39, 5.10, and DG-8039 No Response Required
07/15/2009 Supplement 1 to NUREG-1907, "Safety Evaluation Report Related to License Renewal of Vermont Yankee Nuclear Power Station" No Response Required
06/25/2009 Safety Evaluation for the Mitsubishi Heavy Industries Topical Report MUAP-07006-P, Revision 2, "Defense-Indepth and Diversity," Related to the US-APWR Design 07/29/2009
06/17/2009 Draft Final Revision 2 to Regulatory Guides 1.21, "Measuring, Evaluating and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste," and 4.1, "Radiological Environmental Monitoring for Nuclear Power Plants"

07/17/2009

06/16/2009 Report on the Safety Aspects of the License Renewal Application for the National Bureau of Standards Test Reactor 07/17/2009
06/09/2009 Proposed Revisions to Regulatory Guides 1.174, 1.177, 1.40, 1.68.2, 1.159, DG-3037, and 1.183 No Response Required
05/20/2009 Proposed Resolution of Generic Safety Issue - 163, "Multiple Steam Generator Tube Leakage" 06/23/2009
05/20/2009 Draft Final Regulatory Guides 1.47, 1.69, and 3.52 No Response Required
05/20/2009 Proposed Revisions to Regulatory Guides 1.34, 1.43, 1.44, 1.50, 1.84, 1.147, and 1.193 No Response Required
05/18/2009 Draft Final Regulatory Guide 1.214 (DG-1212), "Response Procedures for Potential or Actual Aircraft Attacks" 06/23/2009
05/18/2009 ACRS Review of Steam Generator Action Plans No Response Required
04/21/2009 Draft Final Regulatory guide 1.211, "Qualification of Safety-Related Cables and Field Splices for Nuclear Power Plants" 05/18/2009
04/21/2009 Digital I&C Interim Staff Guidance 5, "Highly-Integrated Control Room-Human Factors Issues," and 6, "Licensing Process" 06/01/2009
04/17/2009 Report on the Safety Asspects of the License Renewal Application for the Vogtle Electric Generating Plant, Units 1 and 2 05/22/2009
04/09/2009 Draft Final Revison 2 to Regulatory Guide 1.200, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities" 05/08/2009
04/09/2009 Proposed Revision 1 to Regulatory Guide 1.65 (DG-1211), "Materials and Inspections for Reactor Vessel Closure Studs" No Response Required
04/09/2009 Draft Final Regulatory Guides No Response Required
03/19/2009

Draft Final Regulatory Guide 5.71, "Cyber Security Programs for Nuclear Facilities"

 
03/19/2009

Draft Final Regulatory Guide 5.73, "Fatigue Management of Power Plant Personnel"

Not Available
03/18/2009 Crediting Containment Overpressure in Meeting the Net Positive Suction Head Required to Demonstrate that the Safety Systems can Mitigate the Accidents as Designed 06/04/2009
03/13/2009 Draft Final Rule 10 CFR 50.61a, "Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events" 04/01/2009
03/12/2009 Draft Final Revision 3 to Regulatory Guide 10.4 No Response Required
03/12/2009 Proposed Revision to Regulatory Guide 1.141 (DG-1213) No Response Required
03/12/2009 Proposed Revisions to Regulatory Guide 1.205 (DG-1218) and Standard Review Plan Section 9.5.1.2 No Response Required
02/23/2009 Draft Final NUREG-1855, "Guidance on the Treatment of Uncertainties Associated with Pras in Risk-informed Decisionmaking," and Draft Appendix A, "Example Implementation of the Process for the Treatment of Pra Uncertainty in a Risk-informed Regulatory Application" 04/14/2009
02/18/2009 SECY-08-0197, "Review of Options to Revise Radiation Protection Regulations and Guidance With Respect to the 2007 Recommendations of the International Commission on Radiological Protection" 03/19/2009
02/18/2009 Draft Final Regulatory Guide DG-5021, "Managing the Safety/Security Interface"  
02/11/2009 Draft Regulatory Guides 1.189 (DG-1214), 1.28 (DG-1215), and DG-5028 No Response Required
02/09/2009 Draft Final Regulatory Guide 1.212 No Response Required