The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Advisory Committee on Reactor Safeguards (ACRS) 2008 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title EDO
Response
12/22/2008 Interim Letter 6: Chapters 7 and 14 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design 02/13/2009
12/22/2008 Final Review of the Vogtle Electric Generating Plant Early Site Permit Application and Limited Work Authorization Request and the Associated Safety Evaluation Report 01/23/2009
12/18/2008 Technical Basis and Rulemaking Strategy for the Revision of 10 CFR 50.46(b) Loss-of-Coolant Accident Embrittlement Criteria for Fuel Cladding Materials 01/23/2009
12/10/2008 Proposed Rules Regarding Enhancements to Emergency Preparedness Regulations  
11/14/2008 White Paper on "Historical Perspectives and Insights on Reactor Consequence Analyses" No Response Required

11/14/2008

Draft Final Revision to Regulatory Guides 1.125 and 3.25 No Response Required
11/14/2008 Proposed Interim Staff Guidance (ISG) DC/COL-ISG-08 No Response Required
11/14/2008 Draft Regulatory Guide DG-1204 No Response Required

11/14/2008

Withdrawl of Regulatory Guide 3.38, "General Fire Protection Guide for Fuel Reprocessing Plants" No Response Required

11/14/2008

Supplement 1 to NUREG-1875, "Safety Evaluation Report Related to License Renewal of Oyster Creek Generating Station" No Response Required
10/29/2008 Interim Letter 5:  Chapters 19 and 22 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design 12/02/2008
10/22/2008 ACRS Assessment of the Quality of Selected NRC Research Projects - FY 2008  
10/22/2008 Status of Resolution of Generic Safety Issue-191, "Assessment of Debris Accumulation on PWR Sump Performance" 11/26/2008
10/16/2008 Report on the Safety Aspects of the License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1 12/04/2008
10/08/2008 Draft Final Revision to Regulatory Guides 1.114 and 3.11 No Response Required
10/08/2008 Proposed Interim Staff Guidances COL/ESP-ISG-004 and DC/COL-ISG-07 No Response Required
10/08/2008 Withdrawal of Regulatory Guide 6.8, "Identification Plaque for Irretrievable Well-Logging Sources" No Response Required
09/24/2008 Development of the Trace Thermal-Hydraulic System Analysis  
09/17/2008 Report on the Safety Aspects of the License Renewal Application for the Wolf Creek Generating Station, Unit 1 10/27/2008
09/09/2008 Draft Final Regulatory Guide 10.7, 10.8, and 10.9 No Response Required
09/09/2008 Draft Regulatory Guides DG-1205, DG-1187, DG-1197, DG-1196, DG-3031, DG-0020, DG-5026, DG-1141, DG-3035, DG-5027, and DG-1203 No Response Required
09/09/2008 Purposed Interim Staff Guidance (ISG) DC/COL-ISG-06 No Response Required
09/09/2008 Withdrawal of Regulatory Guide 8.1, "Radiation Symbol" No Response Required
07/15/2008 Draft Regulatory Guides 1149 and 1189 No Response Required
07/23/2008 Stretch Power Uprate Application for the Millstone Power Station, Unit 3 08/13/2008
07/21/2008 Interim Letter 4: Chapter 3 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design 08/15/2008
07/18/2008 Security and Aircraft Impact Rulemaking for Nuclear Power Plants  
06/13/2008 Artist Test Program  
06/09/2008 Withdrawl of Regulatory Guide 1.139, "Guidance for Residual Heat Removal" No Response Required
06/09/2008 Draft Regulatory 1186, 4013, and 3034 No Response Required
06/09/2008 Draft Final Revision to 10 CFR 50.55a, "Codes and Standards" No Response Required
06/09/2008 Draft Final Regulatory Guide 4.21, "Minimization of Contamination and Radioactive Waste Generation: Life-Cycle Planning" No Response Required
06/03/2008 Response to the January 17, 2008, EDO Letter Regarding Susquehanna Steam Electric Station Units 1 and 2 Extended Power Uprate 08/21/2008
05/30/2008 PHEBUS Fission Product (PHEBUS-FP) Progam  
05/23/2008 Interim Letter 3: Chapters 4, 6, 15, 18, and 21 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design 07/08/2008
05/19/2008 Draft Report NUREG/CR-6962, "Approaches to Using Traditional Probabilistic Rsik Assessment Methods for Digital Systems," and Related Matters 07/08/2008
05/15/2008 Withdrawal of Regulatory Guide 3.42 No Response Required
05/15/2008 Multiple Draft Regulatory Guides to be Issued as Final No Response Required
05/15/2008 Draft Regulatory Guides 3024 and 3033 No Response Required
05/15/2008 Draft Regulatory Guides 1178, 1190, 1198, and 1200 No Response Required
05/02/2008 Hope Creek Generating Station Extended Power Uprate Application 05/27/2008
04/29/2008 Digital Instrumentation and Control Systems Interim Staff Guidance 05/28/2008
04/23/2008 Regulatory Guide 1.210 No Response Required
04/23/2008 Proposed Stretch Power Uprate to Millstone Power Station, Unit 3 05/23/2008
04/23/2008 Proposed Regulatory Guides/Withdrawl of Certain Regulatory Guides No Response Required
04/23/2008 ACRS Review of Power Uprates 06/23/2008
04/21/2008 Response to Your April 7, 2008 Letter Regarding State-of-the Art Reactor Consequences Analyses (SOARCA) Project 05/20/2008
03/20/2008 Report on the Safety Aspects of the License Renewal Application for the Vermont Yankee Nuclear Power Station 04/17/2008
03/20/2008 Report on the Safety Aspects of the License Renewal Application for the James A. Fitzpatrick Nuclear Power Plant 04/24/2008
03/20/2008 Interim Letter: Chapters 9, 10, 13, and 16 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design 04/24/2008
03/06/2008 Review and Evaluation of the NRC Safety Research Program 04/11/2008
02/28/2008 Cable Response to Live Fire (Carolfire) Testing and Fire Model Improvement Program 04/01/2008
02/25/2008 State-of-the-Art Reactor Consequence Analyses (SOARCA) Project 04/07/2008
02/22/2008 Draft Final Revision 1 to Regulatory Guide 1.45, "Guidance on Monitoring and Responding to Reactor Coolant System Leakage" 03/27/2008
02/19/2008 Final ACRS Review of the Vermont Yankee License Renewal Application No Response Required

Page Last Reviewed/Updated Wednesday, May 27, 2020