Date |
Title |
EDO
Response |
12/22/2008 |
Interim Letter 6: Chapters 7 and 14 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design |
02/13/2009 |
12/22/2008 |
Final Review of the Vogtle Electric Generating Plant Early Site Permit Application and Limited Work Authorization Request and the Associated Safety Evaluation Report |
01/23/2009 |
12/18/2008 |
Technical Basis and Rulemaking Strategy for the Revision of 10 CFR 50.46(b) Loss-of-Coolant Accident Embrittlement Criteria for Fuel Cladding Materials |
01/23/2009 |
12/10/2008 |
Proposed Rules Regarding Enhancements to Emergency Preparedness Regulations |
|
11/14/2008 |
White Paper on "Historical Perspectives and Insights on Reactor Consequence Analyses" |
No Response Required |
11/14/2008
|
Draft Final Revision to Regulatory Guides 1.125 and 3.25 |
No Response Required |
11/14/2008 |
Proposed Interim Staff Guidance (ISG) DC/COL-ISG-08 |
No Response Required |
11/14/2008 |
Draft Regulatory Guide DG-1204 |
No Response Required |
11/14/2008
|
Withdrawl of Regulatory Guide 3.38, "General Fire Protection Guide for Fuel Reprocessing Plants" |
No Response Required |
11/14/2008
|
Supplement 1 to NUREG-1875, "Safety Evaluation Report Related to License Renewal of Oyster Creek Generating Station" |
No Response Required |
10/29/2008 |
Interim Letter 5: Chapters 19 and 22 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design |
12/02/2008 |
10/22/2008 |
ACRS Assessment of the Quality of Selected NRC Research Projects - FY 2008 |
|
10/22/2008 |
Status of Resolution of Generic Safety Issue-191, "Assessment of Debris Accumulation on PWR Sump Performance" |
11/26/2008 |
10/16/2008 |
Report on the Safety Aspects of the License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1 |
12/04/2008 |
10/08/2008 |
Draft Final Revision to Regulatory Guides 1.114 and 3.11 |
No Response Required |
10/08/2008 |
Proposed Interim Staff Guidances COL/ESP-ISG-004 and DC/COL-ISG-07 |
No Response Required |
10/08/2008 |
Withdrawal of Regulatory Guide 6.8, "Identification Plaque for Irretrievable Well-Logging Sources" |
No Response Required |
09/24/2008 |
Development of the Trace Thermal-Hydraulic System Analysis |
|
09/17/2008 |
Report on the Safety Aspects of the License Renewal Application for the Wolf Creek Generating Station, Unit 1 |
10/27/2008 |
09/09/2008 |
Draft Final Regulatory Guide 10.7, 10.8, and 10.9 |
No Response Required |
09/09/2008 |
Draft Regulatory Guides DG-1205, DG-1187, DG-1197, DG-1196, DG-3031, DG-0020, DG-5026, DG-1141, DG-3035, DG-5027, and DG-1203 |
No Response Required |
09/09/2008 |
Purposed Interim Staff Guidance (ISG) DC/COL-ISG-06 |
No Response Required |
09/09/2008 |
Withdrawal of Regulatory Guide 8.1, "Radiation Symbol" |
No Response Required |
07/15/2008 |
Draft Regulatory Guides 1149 and 1189 |
No Response Required |
07/23/2008 |
Stretch Power Uprate Application for the Millstone Power Station, Unit 3 |
08/13/2008 |
07/21/2008 |
Interim Letter 4: Chapter 3 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design |
08/15/2008 |
07/18/2008 |
Security and Aircraft Impact Rulemaking for Nuclear Power Plants |
|
06/13/2008 |
Artist Test Program |
|
06/09/2008 |
Withdrawl of Regulatory Guide 1.139, "Guidance for Residual Heat Removal" |
No Response Required |
06/09/2008 |
Draft Regulatory 1186, 4013, and 3034 |
No Response Required |
06/09/2008 |
Draft Final Revision to 10 CFR 50.55a, "Codes and Standards" |
No Response Required |
06/09/2008 |
Draft Final Regulatory Guide 4.21, "Minimization of Contamination and Radioactive Waste Generation: Life-Cycle Planning" |
No Response Required |
06/03/2008 |
Response to the January 17, 2008, EDO Letter Regarding Susquehanna Steam Electric Station Units 1 and 2 Extended Power Uprate |
08/21/2008 |
05/30/2008 |
PHEBUS Fission Product (PHEBUS-FP) Progam |
|
05/23/2008 |
Interim Letter 3: Chapters 4, 6, 15, 18, and 21 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design |
07/08/2008 |
05/19/2008 |
Draft Report NUREG/CR-6962, "Approaches to Using Traditional Probabilistic Rsik Assessment Methods for Digital Systems," and Related Matters |
07/08/2008 |
05/15/2008 |
Withdrawal of Regulatory Guide 3.42 |
No Response Required |
05/15/2008 |
Multiple Draft Regulatory Guides to be Issued as Final |
No Response Required |
05/15/2008 |
Draft Regulatory Guides 3024 and 3033 |
No Response Required |
05/15/2008 |
Draft Regulatory Guides 1178, 1190, 1198, and 1200 |
No Response Required |
05/02/2008 |
Hope Creek Generating Station Extended Power Uprate Application |
05/27/2008 |
04/29/2008 |
Digital Instrumentation and Control Systems Interim Staff Guidance |
05/28/2008 |
04/23/2008 |
Regulatory Guide 1.210 |
No Response Required |
04/23/2008 |
Proposed Stretch Power Uprate to Millstone Power Station, Unit 3 |
05/23/2008 |
04/23/2008 |
Proposed Regulatory Guides/Withdrawl of Certain Regulatory Guides |
No Response Required |
04/23/2008 |
ACRS Review of Power Uprates |
06/23/2008 |
04/21/2008 |
Response to Your April 7, 2008 Letter Regarding State-of-the Art Reactor Consequences Analyses (SOARCA) Project |
05/20/2008 |
03/20/2008 |
Report on the Safety Aspects of the License Renewal Application for the Vermont Yankee Nuclear Power Station |
04/17/2008 |
03/20/2008 |
Report on the Safety Aspects of the License Renewal Application for the James A. Fitzpatrick Nuclear Power Plant |
04/24/2008 |
03/20/2008 |
Interim Letter: Chapters 9, 10, 13, and 16 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design |
04/24/2008 |
03/06/2008 |
Review and Evaluation of the NRC Safety Research Program |
04/11/2008 |
02/28/2008 |
Cable Response to Live Fire (Carolfire) Testing and Fire Model Improvement Program |
04/01/2008 |
02/25/2008 |
State-of-the-Art Reactor Consequence Analyses (SOARCA) Project |
04/07/2008 |
02/22/2008 |
Draft Final Revision 1 to Regulatory Guide 1.45, "Guidance on Monitoring and Responding to Reactor Coolant System Leakage" |
03/27/2008 |
02/19/2008 |
Final ACRS Review of the Vermont Yankee License Renewal Application |
No Response Required |