Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

ACRS 2005 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date

Title

12/23/2005

Early Site Permit Application for the Grand Gulf Site and the Associated Final Safety Evaluation Report

12/21/2005

Draft Final Generic Letter 2005-XX, "Impact of Potentially Degraded HEMYC/MT Fire Barrier Materials on Compliance with Approved Fire Protection Programs"

12/16/2005

Draft Regulatory Guide DG-1120, "Transient and Accident Analysis Methods," and Standard Review Plan Chapter 15 Section 15.0.2, "Review of Transient and Accident Methods"

12/16/2005

Proposed Revision to Regulatory Guide 1.76, "Design Basis Tornado and Tornado Missiles for Nuclear Power Plants," and Standard Review Plan, Sections 2.3.1, "Regional Climatology," and 3.5.1.4, "Missiles Generated by Tornado and Extreme Winds"

12/16/2005

Proposed Revision to Standard Review Plan Section 17.5, "Quality Assurance Program Description Design Certification, Early Site Permit and New License Applicants"

11/21/2005

Draft NRC Digital System Research Plan for FY 2005 - FY 2009

11/18/2005

Draft Final Generic Letter 2005-XX, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power"

11/18/2005

Staff Recommendation to Withdraw the Proposed Rule on Post-Fire Operator Manual Actions

11/18/2005

Report on the Safety Aspects of the License Renewal Application for the Point Beach Nuclear Plant Units 1 and 2

11/15/2005

Final Rule - AP1000 Design Certification

11/09/2005

Draft Final Generic Letter 2005-XX, "Steam Generator Tube Integrity and Associated Technical Specifications"

11/09/2005

Standard Review Plan Section 14.2.1, "Generic Guidelines for Extended Power Uprate Testing Programs"

11/08/2005

Proposed Revision to Standard Review Plan Section 12.5, "Operational Radiation Protection Program"

11/04/2005

ACRS Assessment o f the Quality of Selected NRC Research Projects - FY 2005

10/19/2005

Interim Report on the Safety Aspects of the License Renewal Application for the Browns Ferry Nuclear Plant Units 1, 2, and 3

10/18/2005

Proposed Recommendation for Resolving Generic Safety Issue 80, "Pipe Break Effects on Control Rod Drive Hydraulic Lines in the Drywells of BWR Mark I and II Containments"

10/13/2005

Draft Regulatory Guide Dg-1120 (DG-1120), "Transient and Accident Analysis Methods," and Standard Review Plan Chapter 15 Section 15.0.2 (SRP 15.0.2), "Review of Transient and Accident Methods"

10/11/2005

Proposed Rule on Safety/Security Interface

09/23/2005

Proposed Draft Regulatory Guide DG-8028, "Control of Access to High and Very High Radiation Areas in Nuclear Power Plants"

09/23/2005

Report on a Proposed Technical Basis for Revision of the Embrittlement Criteria in 10 CFR 50.46

09/22/2005

Proposed Revision to Standard Review Plan Section 6.2.1.3 "Mass and Energy Release Analysis for Postulated Loss-of-Coolant Accidents"

09/22/2005

Interim Letter: Exelon Generation Company, LLC, Application for Early Site Permit and the Associated NRC Staff's Draft Safety Evaluation Report

09/22/2005

Draft Final Revisions to Generic License Renewal Guidance Documents

09/22/2005

Report on the Safety Aspects of the License Renewal Applications for the Millstone Power Station, Units 2 and 3

09/21/2005

Report on Two Policy Issues Related to New Plant Licensing

09/20/2005

ACRS Review of the North Anna Early Site Permit Application - Final Safety Evaluation Report Changed Pages Prior to Publishing as a NUREG

09/20/2005

Proposed Rule: Licenses, Certifications, and Approvals For Nuclear Power Plants, 10 CFR Part 52 and Conforming Amendments to Parts 1, 2, 10, 19, 20, 21, 25, 26, 50, 51, 54, 55, 72, 73, 95, 140, 170, and 171

09/20/2005

Proposed Revision 4 to Regulatory Guide 1.82, "Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident"

09/14/2005

Draft Final Regulatory Guide 3.71, "Nuclear Criticality Safety Standards for Fuels and Materials Facilities"

07/25/2005

Draft Final Amendment to 10 CFR 50.55a "Codes and Standards"

07/25/2005

Proposed Generic Letter 2005-XX, "Post-Fire Safeshutdown Circuit Analysis Spurious Actuations"

07/18/2005

Draft Final Regulatory Guide DG-1137, "Guidelines for Lightning Protection of Nuclear Power Plants"

07/18/2005

Dominion Nuclear North Anna, LLC, Early Site Permit Application and the Associated NRC Final Safety Evaluation Report

07/18/2005

Report on the Safety Aspects of the License Renewal Application for the Donald C. Cook Nuclear Plant, Units 1 and 2

07/15/2005

Proposed Revision 2 to Regulatory Guide 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants"

07/15/2005

Assessment of the Quality of the NRC Research Projects

07/08/2005

Proposed Regulatory Guide (DG)-1128, "Criteria for Accident Monitoring Instrumentation for Nuclear Power Plants" (Revision 4 of Regulatory Guide 1.97)

07/07/2005

Proposed Generic Letter 2005-XX, "Impact of Potentially Degraded Hemyc/MT Fire Barrier Materials on Compliance with Approved Fire Protection Programs"

07/07/2005

Proposed Generic Letter 2005-XX, "Inaccessible or Underground Cable Failures That Disable Accident Mitigation Systems"

07/07/2005

Proposed Revision to Standard Review Plan Section 6.5.2, "Containment SPRAy as a Fission Product Cleanup System"

07/07/2005

Proposed Rulemaking to Amend 10 CFR Parts 19 and 20: Collection, Reporting, and Labeling Requirements, and Clarification of Dose Determination Methodology

06/14/2005

Draft Final Regulatory Guide, "Risk-Informed, Performancebased Fire Protection for Existing Light-Water Nuclear Power Plants"

06/14/2005

Interim Letter: Draft Safety Evaluation Report on Grand Gulf Early Site Permit Application

06/10/2005

Draft Final NUREG/CR-6850, "EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities"

06/10/2005

Draft Commission Paper on "Risk-Informed Alternatives to the Single Failure Criterion"

06/09/2005

Interim Report on the Safety Aspects of the License Renewal Application for the Point Beach Nuclear Plant, Units 1 and 2

06/07/2005

Draft Final Regulatory Guides on ASME Code Cases

06/03/2005

Proposed Bulletin Entitled "Emergency Preparedness and Response Actions for Security-Based Events"

05/13/2005

Guidance for Assessing Exemption Requests from Nuclear Power Plant Licensed Operator Staffing Requirements

05/13/2005

Report on the Safety Aspects of the License Renewal Application for Arkansas Nuclear One, Unit 2

05/06/2005

Draft Regulatory Guide DG-8029 (Proposed Revision 2 of Regulatory Guide 8.7), "Instructions for Recording and Reporting Occupational Radiation Dose Data"

04/14/2005

Report on the Safety Aspects of the License Renewal Application for the Joseph M. Farley Nuclear Plant, Units 1 and 2

04/08/2005

Draft NUREG, "Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications"

04/08/2005

Proposed Revision to Regulatory Guide 3.71, "Nuclear Criticality Safety Standards for Fuels and Materials Facilities"

04/08/2005

Proposed Revision to Management Directive 6.4, "Generic Issues Program"

03/14/2005

Proposed Rulemaking to Modify 10 CFR 50.46, "Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements"

03/11/2005

Pressurized Thermal Shock (PTS) Reevaluation Project: Technical Basis for Revision of the PTS Screening Criterion in the PTS Rule

03/11/2005

Interim Letter: Draft Safety Evaluation Report on North Anna Early Site Permit Application

03/11/2005

Revised Draft NUREG Report "Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process"

03/08/2005

Proposed Generic Letter 2005-XX, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power"

02/24/2005

Waterford Steam Electric Station, Unit 3 - Extended Power Uprate

02/24/2005

Review of the Final Safety Evaluation Report for the Mixed Oxide Fuel Fabrication Facility Construction Authorization Request

02/11/2005

Draft Regulatory Guide, DG-1137, "Guidelines for Lightning Protection for Nuclear Power Plants"