Date |
Title |
12/11/1980 | Status Report on Restart of the Three Mile Island Nuclear Station, Unit 1. |
11/12/1980 | ACRS Review Of License Applications. |
11/12/1980 | Nuclear Data Link |
11/12/1980 | Diablo Canyon Nuclear Station. |
11/12/1980 | Report on the Restart of the General Electric Test Reactor. |
10/15/1980 | Seimic Qualification Of Auxiliary Feedwater Systems. |
10/14/1980 | Proposed Rule Making On Fire Protection - SECY-80-438A. |
10/02/1980 | ACRS Review Of License Applications |
09/09/1980 | Cladding Swelling And Rupture Models For LOCA Analysis - NUREG-0630. |
09/08/1980 | Additional ACRS Comments on Hydrogen Control and Improvement of Containment Capability. |
09/08/1980 | Sequoyah Nuclear Power Plant, Units 1 and 2. |
08/12/1980 | Cascading Failures In Nuclear Plants. |
08/12/1980 | New Unresolved Safety Issues. |
08/11/1980 | Power Level Increase At Fort Calhoun Station, Unit No. 1. |
07/16/1980 | Letter To The Honorable Victor Gilinsky. |
07/16/1980 | Additional ACRS Comments on the RCP Trip and HPI Termination Criteria. |
07/15/1980 | Letter to Honorable Victor Gilinsky |
06/11/1980 | Report On Draft Final Rule On Emergency Planning (10 CFR Part 50 And Part 70). |
06/10/1980 | Near-Term Construction Permit Applications. |
06/10/1980 | Report On NUREG-0667 Transient Response Of Babcock - Wilcox-Designed Reactors. |
05/07/1980 | Letter To The Honorable Victor Gilinsky. |
05/07/1980 | Letter To Honorable Victor Gilinsky |
05/06/1980 | Report On Proposed Emergency Planning Rule (10 CFR Part 50). |
05/06/1980 | Near-Term Construction Permit Applications. |
05/06/1980 | Extended Operation of Shippingport Light Water Breeder Reactor |
05/06/1980 | Nuclear Data Link. |
05/06/1980 | ACRS Action On Regulatory Guides. |
04/17/1980 | NUREG-0660 NRC Action Plans Developed as a Result of the TMI-2 Accident, Draft 3. |
04/16/1980 | Floating Nuclear Plant (FNP) Core Ladle. |
04/16/1980 | Report On NRC Staff Report On Anticipated Transients Without Scram, NUREG-0460. |
04/15/1980 | ACRS Action On Regulatory Guides. |
04/15/1980 | Babcock And Wilcox Nuclear Plants under Construction. |
04/14/1980 | Reorganization Plan No. 1 of 1980 |
03/12/1980 | ACRS Comments On Recommendations Of NRC Special Inquiry Group Regarding ACRS Activities |
03/11/1980 | ACRS Report on Near-Term Operating License Items from Draft 3 of NUREG-0660. |
03/11/1980 | Letter To William J. Dircks |
03/11/1980 | Recommendations of the NRC Task Force on Bulletins and Orders. |
02/20/1980 | Letter To Honorable Morris K. Udall. |
02/14/1980 | NUREG-0625, Report Of The Siting Policy Task Force. |
02/13/1980 | NRC Acceptance Criteria For The Mark I Containment Long Term Program. |
02/11/1980 | NUREG-0660 Draft 2. |
01/15/1980 | Draft NUREG-0600 |
01/15/1980 | Recommendations Of Presidents Commission On ACRS Role |