Construction Permit Application Review Documents for Hermes 2 – Kairos Power

The following table provides access to the construction permit application for Hermes 2 and other documents that Kairos Power, LLC has submitted to support the review of the application. Key documents published by the NRC as part of the application review are also listed.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description Status
09/11/2023 Federal Register Notice: Construction permit application; acceptance for docketing Published on 09/15/2023 (88 FR 63632)
09/11/2023 Acceptance for Docketing of the Hermes 2 Non-power Test Reactor Construction Permit Application Acceptance Letter
07/31/2023 Federal Register Notice: Construction permit application; receipt Published on 08/04/2023 (88 FR 51876)
07/14/2023
Kairos Power Construction Permit Application for Hermes 2.  Includes both the Preliminary Safety Analysis Report and the Environmental Report.
Accepted for review on 09/11/2023

Page Last Reviewed/Updated Friday, September 29, 2023