Date |
Description |
Status |
09/11/2023 |
Federal Register Notice: Construction permit application; acceptance for docketing |
Published on 09/15/2023 (88 FR 63632) |
09/11/2023 |
Acceptance for Docketing of the Hermes 2 Non-power Test Reactor Construction Permit Application |
Acceptance Letter |
07/31/2023 |
Federal Register Notice: Construction permit application; receipt |
Published on 08/04/2023 (88 FR 51876) |
07/14/2023 |
Kairos Power Construction Permit Application for Hermes 2. Includes both the Preliminary Safety Analysis Report and the Environmental Report. |
|
Accepted for review on 09/11/2023 |